Functional Test of the Bleed Regulated Pressure-Transducer with the Bleed Test Set P/N 98L36103002000
TASK 36-11-16-720-001-A-01
Functional Test of the Bleed Regulated Pressure-Transducer with the Bleed Test Set P/N 98L36103002000
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 36-11-16-861-054-A ** ON A/C NOT FOR ALL Subtask 36-11-16-941-054-A ** ON A/C NOT FOR ALL
Subtask 36-11-16-720-051-A ** ON A/C NOT FOR ALL
Subtask 36-11-16-942-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:08:33 UTC
Functional Test of the Bleed Regulated Pressure-Transducer with the Bleed Test Set P/N 98L36103002000
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) ![]() | |
| 98L36103002000 | 1 | TEST SET - ENGINE BLEED |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [8HA1] (XDCR-BLEED REGULATED PRESS, ENG 1) | |
| 415AL, 415AR | |
| FOR [8HA2] (XDCR-BLEED REGULATED PRESS, ENG 2) | |
| 425AL, 425AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 36-11-16-861-054-A ** ON A/C NOT FOR ALL Subtask 36-11-16-941-054-A ** ON A/C NOT FOR ALL
B. Safety Precautions
(1) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On the AIR COND panel 30VU:
Subtask 36-11-16-010-054-A ** ON A/C NOT FOR ALL (1) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On the AIR COND panel 30VU:
- Make sure that the ENG 1(2) BLEED pushbutton switch is released (OFF legend is on).
- Make sure that the APU BLEED pushbutton switch is released (ON legend is off).
- Put a WARNING NOTICE(S) in position to tell persons not to operate the pneumatic system.
- Put a WARNING NOTICE(S) in position to tell the persons not to start the engine 1(2).
- Put a WARNING NOTICE(S) in position to tell persons not to pressurize the pneumatic system.
- Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton switch is off.
- Put a WARNING NOTICE(S) in position to tell persons not to energize the FADEC 1(2).
C. Get Access
(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the pylon access.
(2) Open the access doors:
(a) FOR [8HA1] (XDCR-BLEED REGULATED PRESS, ENG 1)
415AL 415AR
(b) FOR [8HA2] (XDCR-BLEED REGULATED PRESS, ENG 2)
425AL 425AR.
Subtask 36-11-16-860-057-A ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the pylon access.
(2) Open the access doors:
(a) FOR [8HA1] (XDCR-BLEED REGULATED PRESS, ENG 1)
415AL 415AR
(b) FOR [8HA2] (XDCR-BLEED REGULATED PRESS, ENG 2)
425AL 425AR.
D. Aircraft Maintenance Configuration
(2) Put the PLUG-BLANKING in each disconnected line end.
Subtask 36-11-16-860-058-A ** ON A/C NOT FOR ALL CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT THE PNEUMATIC LINES ON UNIONS.
(1) Disconnect the sense line from the bleed regulated pressure-transducer 8HA1(2). (2) Put the PLUG-BLANKING in each disconnected line end.
E. Aircraft Maintenance Configuration
(1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
4. Procedure(1) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
Subtask 36-11-16-720-051-A ** ON A/C NOT FOR ALL
A. Functional Test of the Bleed Regulated Pressure-Transducer
(1) Close the shutoff valve, the purge valve and the pressure regulator valve on the 98L36103002000 TEST SET - ENGINE BLEED.
(3) Connection of the test set:
(4) Do a reset of the digital pressure gage.
(5) Make sure that the regulator valve of the test set is closed before pressurize the system.
(6) Do the test that follows:
5. Close-up(1) Close the shutoff valve, the purge valve and the pressure regulator valve on the 98L36103002000 TEST SET - ENGINE BLEED.
WARNING:
MAKE SURE THAT THE PRESSURE SUPPLIED TO BLEED TEST SET 98L36103002000 NEVER EXCEEDS 217 PSI (15 BAR). IF THE PRESSURE SUPPLIED TO THE BLEED TEST SET EXCEEDS THIS VALUE, THERE IS A RISK OF INJURY TO PERSONNEL AND DAMAGE TO EQUIPMENT.
IF THE AIR CYLINDER DOES NOT HAVE A MANOMETER INSTALLED, YOU MUST INSTALL THE PRIMARY REGULATOR VALVE BETWEEN THE AIR BOTTLE AND BLEED TEST SET 98L36103002000. THE PRIMARY REGULATOR VALVE WILL LIMIT THE PRESSURE IN THE BLEED TEST SET TO 217 PSI (15 BAR).
(2) Connect an air cylinder to the 98L36103002000 TEST SET - ENGINE BLEED. (3) Connection of the test set:
CAUTION:
BE CAREFUL WHEN YOU CONNECT/DISCONNECT THE TEST SET TO/FROM THE EQUIPMENT.
THE PRESSURE REGULATING VALVE AND THE PRESSURE GAGE ASSEMBLY OF THE TEST SET ARE HEAVY AND CAN CAUSE DAMAGE TO THE ENGINE.
(a) Connect the 98L36103002000 TEST SET - ENGINE BLEED with the short bend flexible assembly to the union of the bleed regulated pressure-transducer. (4) Do a reset of the digital pressure gage.
(5) Make sure that the regulator valve of the test set is closed before pressurize the system.
(6) Do the test that follows:
| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the SD:
|
2.Pressurize the test set:
| |
3.On the test set:
| On the test set:
|
| | On the SD:
|
4.On the test set:
| On the test set:
|
Subtask 36-11-16-942-052-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Close the shutoff valve of the air cylinder.
(2) Slowly open the purge valve to depressurize the test set.
(3) Disconnection of the test set.
(4) Connection of the sense line
(b) Connect the sense line to the bleed regulated pressure-transducer 8HA1(2).
(c) TORQUE the nut of the sense line to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
.
Subtask 36-11-16-860-059-A ** ON A/C NOT FOR ALL (1) Close the shutoff valve of the air cylinder.
(2) Slowly open the purge valve to depressurize the test set.
(3) Disconnection of the test set.
WARNING:
BEFORE YOU START TO REMOVE THE TOOLING, MAKE SURE THAT THERE IS NO PRESSURIZED GAS LEFT INSIDE THE DUCTS. IT CAN CAUSE AN INJURY TO PERSONNEL AND/OR DAMAGE TO EQUIPMENT.
CAUTION:
BE CAREFUL WHEN YOU CONNECT/DISCONNECT THE TEST SET TO/FROM THE EQUIPMENT.
THE PRESSURE REGULATING VALVE AND THE PRESSURE GAGE ASSEMBLY OF THE TEST SET ARE HEAVY AND CAN CAUSE DAMAGE TO THE ENGINE.
(a) Disconnect the short bend flexible assembly from the union of the bleed regulated pressure-transducer (4) Connection of the sense line
CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT THE PNEUMATIC LINES ON UNIONS.
(a) Remove the PLUG-BLANKING from each disconnected line end.(b) Connect the sense line to the bleed regulated pressure-transducer 8HA1(2).
(c) TORQUE the nut of the sense line to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
. B. Aircraft Maintenance Configuration
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
Subtask 36-11-16-410-053-A ** ON A/C NOT FOR ALL (1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access doors:
(a) FOR [8HA1] (XDCR-BLEED REGULATED PRESS, ENG 1)
415AL 415AR
(b) FOR [8HA2] (XDCR-BLEED REGULATED PRESS, ENG 2)
425AL 425AR.
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
Subtask 36-11-16-862-054-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access doors:
(a) FOR [8HA1] (XDCR-BLEED REGULATED PRESS, ENG 1)
415AL 415AR
(b) FOR [8HA2] (XDCR-BLEED REGULATED PRESS, ENG 2)
425AL 425AR.
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
Functional Test of the Bleed Regulated Pressure-Transducer with the Bleed Test Set P/N 98L36103002000