Functional Test of the Bleed Transferred Pressure-Transducer with the Bleed Test Set P/N 98D36109001000
TASK 36-11-15-720-803-A
Functional Test of the Bleed Transferred Pressure-Transducer with the Bleed Test Set P/N 98D36109001000
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 36-11-15-861-059-A Subtask 36-11-15-941-058-A
Subtask 36-11-15-720-055-A
Subtask 36-11-15-860-061-A
[Rev.10 from 2021]
2026.04.01 01:08:24 UTC
Functional Test of the Bleed Transferred Pressure-Transducer with the Bleed Test Set P/N 98D36109001000
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
BEFORE YOU INSTALL/REMOVE THE GSE TOOL, READ THE MANUFACTURER'S INSTRUCTIONS, AND, WHILE YOU OPERATE THIS TOOL, CAREFULLY OBEY THEM. IF YOU DO NOT DO THIS, INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN OCCUR.
WARNING:
BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
CAUTION:
BE CAREFUL WHEN YOU CONNECT/DISCONNECT THE TEST SET TO/FROM THE EQUIPMENT.
THE PRESSURE REGULATING VALVE AND THE PRESSURE GAGE ASSEMBLY OF THE TEST SET ARE HEAVY AND CAN CAUSE DAMAGE TO THE ENGINE.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE |
| No specific | 1 | AIR SOURCE - REGULATED, FILTERED, DRY |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 0.84 and 0.83 m.daN (74.34 and 73.45 lbf.in ) ![]() | |
| 98D36109001000 | 1 | TEST SET-EBAS,BLEED |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [7HA1] (XDCR-BLEED TRANSFER PRESS, ENG 1) | |
| 415BL | |
| FOR [7HA2] (XDCR-BLEED TRANSFER PRESS, ENG 2) | |
| 425BL | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-011-A | Procedure to Get Access to the SYSTEM REPORT/TEST/PNEU Page |
| TASK 78-30-00-040-807-A | Deactivation of the Thrust Reverser System for Nacelle Maintenance (ICU) |
| TASK 78-30-00-440-807-A | Reactivation of the Thrust Reverser System after Nacelle Maintenance (ICU) |
| FOR [7HA1] (XDCR-BLEED TRANSFER PRESS, ENG 1) | |
| TASK 54-51-21-000-804-A | Removal of the Pylon Lateral Access-Doors |
| TASK 54-51-21-400-803-A | Installation of the Pylon Lateral Access-Doors |
| FOR [7HA2] (XDCR-BLEED TRANSFER PRESS, ENG 2) | |
| TASK 54-51-21-000-804-A | Removal of the Pylon Lateral Access-Doors |
| TASK 54-51-21-400-803-A | Installation of the Pylon Lateral Access-Doors |
Subtask 36-11-15-861-059-A Subtask 36-11-15-941-058-A
B. Safety Precautions
(1) Make sure that the Engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On AIR COND panel 30VU:
Subtask 36-11-15-865-061-A (1) Make sure that the Engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On AIR COND panel 30VU:
- Make sure that the ENG 1(2) BLEED pushbutton switch is released (OFF legend is on).
- Make sure that the APU BLEED pushbutton switch is released (ON legend is off).
- Put a WARNING NOTICE(S) in position to tell persons not to operate the pneumatic system.
- Put a WARNING NOTICE(S) in position to tell the persons not to start engine 1(2).
- Put a WARNING NOTICE(S) in position to tell persons not to pressurize the pneumatic system.
- Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton switch is off.
- Put a WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 36-11-15-040-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR BLEED/APU BLEED VLV CTL/BMC1 OVRD | 11HV | D14 |
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
| 122VU | AIR BLEED/APU BLEED VLV CTL/BMC2 OVRD | 12HV | Z19 |
D. Deactivation of the Thrust Reverser System
Subtask 36-11-15-010-063-A WARNING:
MAKE SURE THAT THE THRUST REVERSER HYDRAULIC CONTROL UNIT (HCU) IS DEACTIVATED BEFORE YOU DO WORK ON OR AROUND THE THRUST REVERSER. IF THE HCU IS NOT DEACTIVATED, THERE IS A RISK OF UNWANTED THRUST REVERSER OPERATION WHICH CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
(1) Make the thrust reverser unserviceable for maintenance (Ref. AMM TASK 78-30-00-040-807). E. Get Access
(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the pylon access.
(2) Remove the access panel:
(a) FOR [7HA1] (XDCR-BLEED TRANSFER PRESS, ENG 1)
415BL (Ref. AMM TASK 54-51-21-000-804)
(b) FOR [7HA2] (XDCR-BLEED TRANSFER PRESS, ENG 2)
425BL (Ref. AMM TASK 54-51-21-000-804).
Subtask 36-11-15-020-055-A (1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the pylon access.
(2) Remove the access panel:
(a) FOR [7HA1] (XDCR-BLEED TRANSFER PRESS, ENG 1)
415BL (Ref. AMM TASK 54-51-21-000-804)
(b) FOR [7HA2] (XDCR-BLEED TRANSFER PRESS, ENG 2)
425BL (Ref. AMM TASK 54-51-21-000-804).
F. Disconnection of the Sense Line
(2) Put the PLUG-BLANKING in each disconnected line end.
Subtask 36-11-15-860-060-A WARNING:
DO NOT TOUCH THE BLEED VALVE COMPONENTS FOR A SHORT TIME AFTER THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT THE PNEUMATIC LINES ON UNIONS.
(1) Disconnect the sense line from the bleed transferred pressure-transducer. (2) Put the PLUG-BLANKING in each disconnected line end.
G. Aircraft Maintenance Configuration
(1) Adjust the brightness of the MCDU screen.
(2) On one MCDU, get the SYSTEM REPORT/TEST PNEU/SENSOR STATUS menu page (Ref. AMM TASK 31-32-00-860-011).
4. Procedure(1) Adjust the brightness of the MCDU screen.
(2) On one MCDU, get the SYSTEM REPORT/TEST PNEU/SENSOR STATUS menu page (Ref. AMM TASK 31-32-00-860-011).
Subtask 36-11-15-720-055-A
A. Functional Test of the Bleed Transferred Pressure-Transducer
(1) Close the shutoff valve, the purge valve and the pressure regulator valve on the 98D36109001000 TEST SET-EBAS,BLEED.
(2) Connect an AIR SOURCE - REGULATED, FILTERED, DRY to the 98D36109001000 TEST SET-EBAS,BLEED.
(3) Connection of the 98D36109001000 TEST SET-EBAS,BLEED:
(a) Connect the 98D36109001000 TEST SET-EBAS,BLEED with the short hose to the adaptor assembly.
(b) Connect the adaptor assembly to the test port of the bleed transferred pressure-transducer.
(c) Tighten the adaptor assembly.
(4) Do a reset of the digital pressure gage.
(5) Make sure that the regulator valve of the 98D36109001000 TEST SET-EBAS,BLEED is closed before pressurize the system.
(6) Do the test that follows:
(7) Close the shutoff valve of the AIR SOURCE - REGULATED, FILTERED, DRY.
(8) Slowly open the purge valve to depressurize the 98D36109001000 TEST SET-EBAS,BLEED to 0 psi (0.0000 bar).
(9) Disconnection of the 98D36109001000 TEST SET-EBAS,BLEED:
(b) Disconnect the short hose from the adaptor assembly.
(c) Disconnect the short hose from the 98D36109001000 TEST SET-EBAS,BLEED.
5. Close-up(1) Close the shutoff valve, the purge valve and the pressure regulator valve on the 98D36109001000 TEST SET-EBAS,BLEED.
(2) Connect an AIR SOURCE - REGULATED, FILTERED, DRY to the 98D36109001000 TEST SET-EBAS,BLEED.
(3) Connection of the 98D36109001000 TEST SET-EBAS,BLEED:
(a) Connect the 98D36109001000 TEST SET-EBAS,BLEED with the short hose to the adaptor assembly.
(b) Connect the adaptor assembly to the test port of the bleed transferred pressure-transducer.
(c) Tighten the adaptor assembly.
(4) Do a reset of the digital pressure gage.
(5) Make sure that the regulator valve of the 98D36109001000 TEST SET-EBAS,BLEED is closed before pressurize the system.
(6) Do the test that follows:
| ACTION | RESULT |
|---|---|
1.On the MCDU control panel:
| On the MCDU:
|
2.Pressurize the 98D36109001000 TEST SET-EBAS,BLEED:
| |
3.On the 98D36109001000 TEST SET-EBAS,BLEED:
| On the 98D36109001000 TEST SET-EBAS,BLEED:
|
4.On the 98D36109001000 TEST SET-EBAS,BLEED:
| On the 98D36109001000 TEST SET-EBAS,BLEED:
|
(8) Slowly open the purge valve to depressurize the 98D36109001000 TEST SET-EBAS,BLEED to 0 psi (0.0000 bar).
(9) Disconnection of the 98D36109001000 TEST SET-EBAS,BLEED:
WARNING:
BEFORE YOU START TO REMOVE THE TOOLING, MAKE SURE THAT THERE IS NO PRESSURIZED GAS LEFT INSIDE THE DUCTS. IT CAN CAUSE AN INJURY TO PERSONNEL AND/OR DAMAGE TO EQUIPMENT.
(a) Disconnect the 98D36109001000 TEST SET-EBAS,BLEED from the test port of the bleed transferred pressure-transducer. (b) Disconnect the short hose from the adaptor assembly.
(c) Disconnect the short hose from the 98D36109001000 TEST SET-EBAS,BLEED.
Subtask 36-11-15-860-061-A
A. Aircraft Maintenance Configuration
(1) Close the MCDU session.
(2) Fully decrease the brightness of the MCDU screen (display off).
Subtask 36-11-15-420-057-A (1) Close the MCDU session.
(2) Fully decrease the brightness of the MCDU screen (display off).
B. Connection of the Sense Line
(2) Connect the sense line to the bleed transferred pressure-transducer.
(3) TORQUE the nut of the sense line to between 0.84 and 0.83 m.daN (74.34 and 73.45 lbf.in )
.
Subtask 36-11-15-410-061-A CAUTION:
USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT THE PNEUMATIC LINES ON UNIONS.
(1) Remove the PLUG-BLANKING from each disconnected line end.(2) Connect the sense line to the bleed transferred pressure-transducer.
(3) TORQUE the nut of the sense line to between 0.84 and 0.83 m.daN (74.34 and 73.45 lbf.in )
. C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel:
(a) FOR [7HA1] (XDCR-BLEED TRANSFER PRESS, ENG 1)
415BL (Ref. AMM TASK 54-51-21-400-803)
(b) FOR [7HA2] (XDCR-BLEED TRANSFER PRESS, ENG 2)
425BL (Ref. AMM TASK 54-51-21-400-803).
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
Subtask 36-11-15-440-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel:
(a) FOR [7HA1] (XDCR-BLEED TRANSFER PRESS, ENG 1)
415BL (Ref. AMM TASK 54-51-21-400-803)
(b) FOR [7HA2] (XDCR-BLEED TRANSFER PRESS, ENG 2)
425BL (Ref. AMM TASK 54-51-21-400-803).
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
D. Reactivation of the Thrust Reverser System
(1) Make the thrust reverser serviceable (Ref. AMM TASK 78-30-00-440-807).
Subtask 36-11-15-862-058-A (1) Make the thrust reverser serviceable (Ref. AMM TASK 78-30-00-440-807).
MCDU Valve Status Page