W DOC AIRBUS | AMM A320F

Installation of the Bleed Transferred Pressure-Transducer


TASK 36-11-15-400-001-A
Installation of the Bleed Transferred Pressure-Transducer


WARNING: MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
ZONE: 415
ZONE: 425
FIN: 7HA1 ** ON A/C NOT FOR ALL
FIN: 7HA2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 155.76 and 127.44 lbf.in (1.76 and 1.44 m.daN ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03PBB1)
Lubricant-Anti Seize High Temp. -
(Material No.03QBC1)
Dry lubricant-General Assembly Molybdenum Disulfide & Silicone -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
415
LOWER PYLON
425
LOWER PYLON
FOR [7HA1] (XDCR-BLEED TRANSFER PRESS, ENG 1)
415AL, 415AR
FOR [7HA2] (XDCR-BLEED TRANSFER PRESS, ENG 2)
425AL, 425AR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
4
PACKING
AIPC 36-11-06-06-160
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 36-11-00-710-002-A
Operational Test to Read the CLASS III FAULTS
TASK 36-11-00-740-001-A
BITE Test of the BMC 1(2)
TASK 49-00-00-860-006-A
APU Shutdown by External Power
TASK 49-00-00-860-006-A-01
APU Shutdown by Batteries
TASK 49-00-00-860-009-A
APU Shutdown by External Power (131-9(A))
TASK 49-00-00-860-009-A-01
APU Shutdown by Batteries (131-9(A))
3. Job Set-up
Subtask 36-11-15-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that engine 1(2) is shutdown for a minimum of five minutes before you do this procedure.
   (3) In the cockpit, on AIR COND panel 30VU:
     (a) Make sure that the ENG 1(2) BLEED pushbutton-switch is released (the OFF legend is on).
     (b) Make sure that the APU BLEED pushbutton-switch is released (the ON legend is off).
     (c) Make sure that the WARNING NOTICE(S) is (are) in the position to tell persons not to operate the pneumatic system.
   (4) In the cockpit, on ENG panel 115VU:
     (a) Make sure that the WARNING NOTICE(S) is (are) in the position to tell persons not to start engine 1(2).
   (5) On the HP ground connector:
     (a) Make sure that the WARNING NOTICE(S) is (are) in the position to tell persons not to pressurize the pneumatic system.
   (6) In the cockpit, on the ENG section of panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton-switch is off.
     (b) Make sure that the WARNING NOTICE(S) is (are) in the position to tell persons not to energize the FADEC system.
   (7) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is in the position at the pylon access.
Subtask 36-11-15-010-051-A ** ON A/C NOT FOR ALL
B. Make sure that these access doors are open:
   (1) FOR [7HA1] (XDCR-BLEED TRANSFER PRESS, ENG 1)
415AL 415AR
   (2) FOR [7HA2] (XDCR-BLEED TRANSFER PRESS, ENG 2)
425AL 425AR
Subtask 36-11-15-865-051-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 7HA1 (XDCRBLEED TRANSFER PRESS, ENG 1)
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
FOR FIN: 7HA2 (XDCRBLEED TRANSFER PRESS, ENG 2)
122VUAIR BLEED/ENG 2/CTL3HA2Z23
122VUAIR BLEED/ENG 2/MONG2HA2Z22
4. Procedure
Subtask 36-11-15-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Bleed Transferred Pressure-Transducer
   (1) If you use the APU to energize the electrical circuits, stop the APU:
   (2) In the cockpit, on the SD bleed page:
     (a) Make sure that the pressure and the temperature of the bleed-air ducting system are in ambient conditions.
WARNING: MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
   (3) Install a new AIPC 36-11-06-06-160 PACKING (4) on the coupling (6).
   (4) Clean the threads of the coupling (6).
CAUTION: APPLY ONLY A THIN LAYER OF GREASE TO THE THREADS OF THE HOSE-ASSEMBLY COUPLING NUTS, AND REMOVE THE UNWANTED GREASE TO PREVENT CONTAMINATION OF THE HOSE ASSEMBLY. IF YOU USE TOO MUCH GREASE, IT CAN CAUSE CLOGGING OF THE HOSE ASSEMBLY OR DAMAGE TO THE RELATED COMPONENTS.
   (5) Apply a thin layer of Dry lubricant-General Assembly Molybdenum Disulfide & Silicone - (Material No.
03QBC1) or Lubricant-Anti Seize High Temp. - (Material No.03PBB1) to the threads of the coupling (6).
   (6) Connect the coupling (6) to the pressure transducer (7).
   (7) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (8) Remove the PLUG-BLANKING from each disconnected line end.
CAUTION: USE TWO WRENCHES DURING DISCONNECTION OF THE SENSE LINE, ONE TO MAINTAIN THE FIXED NUT AND THE SECOND ONE TO LOOSEN/TIGHTEN THE SENSE LINE COUPLING.
   (9) Put the pressure transducer (7) in position on the support (8).
   (10) Install the screws (3) and the washers (2) on the pressure transducer (7) and tighten them.
   (11) Connect the electrical connector (1) to the pressure transducer (7).
   (12) Connect the sense line (5) to the coupling (6).
   (13) TORQUE the nut to between 155.76 and 127.44 lbf.in (1.76 and 1.44 m.daN ) T
Subtask 36-11-15-710-050-A ** ON A/C NOT FOR ALL
B. Do the BITE test of the BMC 1(2) (Ref. AMM TASK 36-11-00-740-001)
   (1) Make sure that the CLASS III fault message is not shown (Ref. AMM TASK 36-11-00-710-002):
36.11.15
TRANS. PRESS XDCR 7HA1(2)
5. Close-up
Subtask 36-11-15-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close these access doors :
     (a) FOR [7HA1] (XDCR-BLEED TRANSFER PRESS, ENG 1)
415AL 415AR
     (b) FOR [7HA2] (XDCR-BLEED TRANSFER PRESS, ENG 2)
425AL 425AR
   (3) Remove the access platform(s).
   (4) Remove the WARNING NOTICE(S).
Subtask 36-11-15-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 7HA1 (XDCRBLEED TRANSFER PRESS, ENG 1)
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
FOR FIN: 7HA2 (XDCRBLEED TRANSFER PRESS, ENG 2)
122VUAIR BLEED/ENG 2/CTL3HA2Z23
122VUAIR BLEED/ENG 2/MONG2HA2Z22
Subtask 36-11-15-862-050-A ** ON A/C NOT FOR ALL
C. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.01 01:08:13 UTC