Emergency Protection Function (EPF) Test
TASK 36-11-00-740-808-A
Emergency Protection Function (EPF) Test
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 36-11-00-861-158-A Subtask 36-11-00-865-152-A
Subtask 36-11-00-740-056-A
Subtask 36-11-00-860-132-A
[Rev.10 from 2021]
2026.04.01 01:07:44 UTC
Emergency Protection Function (EPF) Test
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-011-A | Procedure to Get Access to the SYSTEM REPORT/TEST/PNEU Page |
Subtask 36-11-00-861-158-A Subtask 36-11-00-865-152-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 36-11-00-860-131-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR BLEED/APU BLEED VLV CTL/BMC1 OVRD | 11HV | D14 |
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
| 122VU | AIR BLEED/APU BLEED VLV CTL/BMC2 OVRD | 12HV | Z19 |
C. Aircraft Maintenance Configuration
(1) On the AIR COND panel:
(a) Adjust the brightness of the MCDU screen.
(b) On one MCDU, get the SYSTEM REPORT/TEST/PNEU page (Ref. AMM TASK 31-32-00-860-011).
4. Procedure(1) On the AIR COND panel:
- Make sure that the ENG 1(2) bleed pushbutton switches are pushed (OFF legends off).
- Make sure that the crossbleed selector switch is in the AUTO position.
- Make sure that the APU BLEED pushbutton switch is released (ON legend off).
(a) Adjust the brightness of the MCDU screen.
(b) On one MCDU, get the SYSTEM REPORT/TEST/PNEU page (Ref. AMM TASK 31-32-00-860-011).
Subtask 36-11-00-740-056-A
A. BITE Test of the EBAS Application
5. Close-up- During this procedure, if an error message comes into view, record it. Then do the related trouble shooting procedure.
NOTE: During the test, obey the instructions shown on the terminal.
| ACTION | RESULT |
|---|---|
1.On the MCDU:
| The applicable BMC 1(2) page comes into view. |
2.On the MCDU:
| The BMC 1(2)/TEST page comes into view. |
3.On the MCDU:
| The BMC 1(2)/EPF TEST/CHECK INITIAL CONDITIONS page comes into view.
|
4.On the MCDU:
| The BMC 1(2)/EPF TEST/CHECK INITIAL CONDITIONS page comes into view.
|
5.On the MCDU:
| The BMC 1(2)/LRU'S PNEU FUNCTIONS NOT CHECKED DURING TEST page comes into view.
|
|
|
6.On the MCDU:
| |
Subtask 36-11-00-860-132-A
A. Aircraft Maintenance Configuration
(1) Put the aircraft back to its initial configuration.
(2) On the MCDU:
(a) Fully decrease the brightness of the MCDU screen (display off).
Subtask 36-11-00-862-139-A (1) Put the aircraft back to its initial configuration.
(2) On the MCDU:
(a) Fully decrease the brightness of the MCDU screen (display off).