BITE Test of the Engine Bleed Air System (EBAS) (System Test)
TASK 36-11-00-740-804-A
BITE Test of the Engine Bleed Air System (EBAS) (System Test)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 36-11-00-861-145-A Subtask 36-11-00-865-132-A
Subtask 36-11-00-740-052-A
Subtask 36-11-00-860-145-A
[Rev.10 from 2021]
2026.04.01 01:07:40 UTC
BITE Test of the Engine Bleed Air System (EBAS) (System Test)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 31-32-00-860-011-A | Procedure to Get Access to the SYSTEM REPORT/TEST/PNEU Page |
Subtask 36-11-00-861-145-A Subtask 36-11-00-865-132-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 36-11-00-860-113-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR BLEED/APU BLEED VLV CTL/BMC1 OVRD | 11HV | D14 |
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
| 122VU | AIR BLEED/APU BLEED VLV CTL/BMC2 OVRD | 12HV | Z19 |
C. Aircraft Maintenance Configuration
(1) Make sure that the APU is not in operation.
(2) On AIR COND panel 30VU:
(4) On one MCDU, get the SYSTEM REPORT/TEST PNEU menu page (Ref. AMM TASK 31-32-00-860-011).
4. Procedure(1) Make sure that the APU is not in operation.
(2) On AIR COND panel 30VU:
- Make sure that ENG 1(2) bleed pushbutton switches are pushed (the OFF legends are off).
- Make sure that the crossbleed selector switch is set to AUTO.
- Make sure that APU BLEED pushbutton switch is released (the ON legend is off).
(4) On one MCDU, get the SYSTEM REPORT/TEST PNEU menu page (Ref. AMM TASK 31-32-00-860-011).
Subtask 36-11-00-740-052-A
A. BITE Test of the Engine Bleed Air System(EBAS)
(1) During this procedure, if an error message is shown, record the message. Then do the related troubleshooting procedure.
(2) Do this test:
5. Close-up(1) During this procedure, if an error message is shown, record the message. Then do the related troubleshooting procedure.
(2) Do this test:
NOTE: During the test, obey the instruction shown on the terminal.
| ACTION | RESULT |
|---|---|
1.On the MCDU:
| The applicable BMC 1(2) page comes into view. |
2.On the MCDU:
| The BMC 1(2)/TEST page comes into view. |
3.On the MCDU:
| The BMC 1(2)/ELECTRICAL TEST/CHECK INITIAL CONDITIONS page comes into view.
|
4.On the MCDU:
| The BMC 1(2)/ELECTRICAL TEST/CHECK INITIAL CONDITIONS page comes into view.
|
5.On the MCDU:
| The BMC 1(2)/LRU'S PNEU FUNCTIONS NOT CHECKED DURING TEST/ELECTRICAL TESTING PROGRESS page comes into view.
|
6.On the MCDU:
| |
Subtask 36-11-00-860-145-A
A. Aircraft Maintenance Configuration
(1) Put the aircraft back to its initial configuration.
(2) On the MCDU:
(a) Push the line key adjacent to the RETURN indication until the MAINTENANCE MENU 1/2 page comes into view.
(b) Fully decrease the brightness of the MCDU screen (display off).
Subtask 36-11-00-862-128-A (1) Put the aircraft back to its initial configuration.
(2) On the MCDU:
(a) Push the line key adjacent to the RETURN indication until the MAINTENANCE MENU 1/2 page comes into view.
(b) Fully decrease the brightness of the MCDU screen (display off).