W DOC AIRBUS | AMM A320F

Operational Test of Closing Signal to Temperature Limitation Thermostat Solenoid from Engine Fire Pushbutton


TASK 36-11-00-710-005-A
Operational Test of Closing Signal to Temperature Limitation Thermostat Solenoid from Engine Fire Pushbutton


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
CAUTION: MAKE SURE YOU WILL NOT CAUSE UNWANTED CHANGES TO OTHER SYSTEMS BEFORE YOU PUSH THE ENG1(2) FIRE PUSHBUTTON SWITCH. WHEN YOU PUSH THE ENG1(2) FIRE PUSHBUTTON SWITCH:
  • THESE VALVES CLOSE
. THE LP FUEL VALVE . THE HYDRAULIC FIRE VALVE . THE BLEED AIR VALVES . THE ANTI-ICE VALVES . THE AIR CONDITIONING PACK VALVES
  • THE GENERATOR STOPS.
CAUTION: TO RESET THE ENG 1(2) APU FIRE PUSHBUTTON SWITCH:
  • PUSH THE PUSHBUTTON SWITCH FULLY IN (LATCHED POSITION).
THEN CLOSE THE GUARD. DO NOT TRY TO CLOSE THE GUARD AND PUSH THE PUSHBUTTON SWITCH AT THE SAME TIME.
FIN: 10HA1 ** ON A/C NOT FOR ALL
FIN: 10HA2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413DT
413CL, 413DL, 414CR
FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423CL, 423DL, 424CR
423DT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 29-10-00-710-001-A
Operational Check of Hydraulic Fire Shut Off Valves and Associated Indicating System
3. Job Set-up
Subtask 36-11-00-861-077-A ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 36-11-00-941-090-A ** ON A/C NOT FOR ALL
B. Safety Precautions
   (1) Make sure that the engine 1(2) shut down occurred not less than 5 minutes before you do this procedure.
   (2) On the ENG panel 115VU:
  • put a WARNING NOTICE(S) to tell persons not to start the engine 1(2).
   (3) On the ENG section of the maintenance panel 50VU:
  • make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton switch is off,
  • put a WARNING NOTICE(S) to tell persons not to operate the FADEC 1(2).
   (4) On the AIR COND panel 30VU:
  • make sure that the ENG 1 BLEED and ENG 2 BLEED pushbutton switches are pushed (the OFF legends are off),
  • make sure that the APU BLEED pushbutton switch is released (the ON legend is off),
  • put a WARNING NOTICE(S) to tell persons not to operate the pneumatic system.
Subtask 36-11-00-865-060-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR BLEED/X FEED/VALVE/BAT2HVD13
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
122VUAIR BLEED/ENG 2/CTL3HA2Z23
122VUAIR BLEED/ENG 2/MONG2HA2Z22
122VUAIR BLEED/X FEED VALVE/NORM1HVZ20
Subtask 36-11-00-865-061-A ** ON A/C NOT FOR ALL
D. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
Subtask 36-11-00-010-067-A ** ON A/C NOT FOR ALL
E. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the pylon.
   (2) Remove these access panels:
     (a) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413CL 414CR 413DL
     (b) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423CL 424CR 423DL.
Subtask 36-11-00-010-067-B ** ON A/C NOT FOR ALL
E. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the pylon.
   (2) Remove the access panel:
     (a) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413DT
     (b) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423DT.
Subtask 36-11-00-869-106-A ** ON A/C NOT FOR ALL
F. On the ENG/APU FIRE panel 1WD on the overhead panel 20VU, lift the safety guard of the ENG 1(2) FIRE pushbutton switch.
4. Procedure
Subtask 36-11-00-710-052-A ** ON A/C NOT FOR ALL
A. Do this test:
ACTION
RESULT
1.On the panel 20VU:
  • push and release the ENG 1(2) FIRE pushbutton switch until you hear clicks from the control solenoid of the bleed pressure-regulator valve.
On the bleed pressure-regulator valve:
  • make sure that the solenoid makes clicks.
Subtask 36-11-00-710-057-A ** ON A/C NOT FOR ALL
B. Do an operational test of the Hydraulic Fire Shut-Off Valves (Ref. AMM TASK 29-10-00-710-001)
5. Close-up
CAUTION: TO RESET THE ENG 1(2) APU FIRE PUSHBUTTON SWITCH:
  • PUSH THE PUSHBUTTON SWITCH FULLY IN (LATCHED POSITION).
THEN CLOSE THE GUARD. DO NOT TRY TO CLOSE THE GUARD AND PUSH THE PUSHBUTTON SWITCH AT THE SAME TIME.
Subtask 36-11-00-860-055-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) On the ENG/APU FIRE panel 1WD on the overhead panel 20VU, close the safety guard of the ENG 1(2) FIRE pushbutton switch.
   (2) On the panel 35VU:
  • reset the generator 1(2) with the GEN 1(2) pushbutton switch.
   (3) Make sure that the work area is clean and clear of tools and other items.
Subtask 36-11-00-410-066-A ** ON A/C NOT FOR ALL
B. Install these access panels:
   (1) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413CL 414CR 413DL
   (2) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423CL 424CR 423DL.
Subtask 36-11-00-410-066-B ** ON A/C NOT FOR ALL
B. Install the access panel:
   (1) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413DT
   (2) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423DT.
Subtask 36-11-00-865-062-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
Subtask 36-11-00-860-054-A ** ON A/C NOT FOR ALL
D. Put the aircraft back to its initial configuration.
   (1) Remove the WARNING NOTICE(S).
   (2) Remove the access platform(s).
Subtask 36-11-00-862-073-A ** ON A/C NOT FOR ALL
E. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002)
[Rev.10 from 2021] 2026.04.01 01:06:48 UTC