Installation of the LP Oxygen-Supply Solenoid-Valve
TASK 35-13-51-400-001-A
Installation of the LP Oxygen-Supply Solenoid-Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 35-13-51-860-052-A ** ON A/C NOT FOR ALL
Subtask 35-13-51-420-051-A ** ON A/C NOT FOR ALL
Subtask 35-13-51-860-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:04:45 UTC
Installation of the LP Oxygen-Supply Solenoid-Valve
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
NOTE: After the installation of the LP oxygen-supply solenoid-valve, refer to SB 35-1096 and EASA AD 2020-0104 for the requirement of the flow test.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03GEE1) | Synthetic Oil base Grease-Fuel and Oxidized Environment Fluorinated - |
| (Material No.14CCB6) | Testing Medium-Leak Detection - Oxygen System |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 125 | LATERAL AVIONIC COMPARTMENT |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 4 | BUSH | AIPC 35-12-01-01-010 |
| 7 | RING | AIPC 35-12-01-01-010 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 35-13-51-860-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the access door 812.
(2) Make sure that the access door 812 is open.
(3) Make sure that the electrical circuit is energized (Ref. AMM TASK 24-41-00-861-002).
(4) Make sure that the WARNING NOTICE(S) which tells persons not to open the valve of the oxygen cylinder is in position.
(5) Make sure that the WARNING NOTICE(S) which tells persons not to push the OXYGEN/CREW SUPPLY pushbutton switch is in position.
Subtask 35-13-51-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the access door 812.
(2) Make sure that the access door 812 is open.
(3) Make sure that the electrical circuit is energized (Ref. AMM TASK 24-41-00-861-002).
(4) Make sure that the WARNING NOTICE(S) which tells persons not to open the valve of the oxygen cylinder is in position.
(5) Make sure that the WARNING NOTICE(S) which tells persons not to push the OXYGEN/CREW SUPPLY pushbutton switch is in position.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | OXYGEN/CREW/OXY/SPLY | 1HT | HA01 |
Subtask 35-13-51-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the LP Oxygen-Supply Solenoid-Valve
(1) Apply a thin layer of Synthetic Oil base Grease-Fuel and Oxidized Environment Fluorinated - (Material No.03GEE1) to the first three male threads of the nut or the flared tube.
(2) Put the LP oxygen-supply solenoid-valve (6) on its support (1) and attach it with the screws (2) and the washers (3).
(3) Remove the PLUG - BLANKING from the pipe (8).
(4) Install the new AIPC 35-12-01-01-010 RING (7) on the pipe (8).
(5) Install the pipe (8) on the solenoid valve (6).
(6) TORQUE the coupling nut of the pipe (8) to between 20.3 and 14.7 m.N (14.97 and 10.84 lbf.ft )
.
(7) Remove the PLUG - BLANKING from the pipe (5).
(8) Install the new AIPC 35-12-01-01-010 BUSH (4) on the pipe (5).
(9) Install the pipe (5) on the solenoid valve (6).
(10) TORQUE the coupling nut of the pipe (5) to between 20.3 and 14.7 m.N (14.97 and 10.84 lbf.ft )
.
Subtask 35-13-51-865-053-A ** ON A/C NOT FOR ALL (1) Apply a thin layer of Synthetic Oil base Grease-Fuel and Oxidized Environment Fluorinated - (Material No.03GEE1) to the first three male threads of the nut or the flared tube.
(2) Put the LP oxygen-supply solenoid-valve (6) on its support (1) and attach it with the screws (2) and the washers (3).
(3) Remove the PLUG - BLANKING from the pipe (8).
(4) Install the new AIPC 35-12-01-01-010 RING (7) on the pipe (8).
(5) Install the pipe (8) on the solenoid valve (6).
(6) TORQUE the coupling nut of the pipe (8) to between 20.3 and 14.7 m.N (14.97 and 10.84 lbf.ft )
.(7) Remove the PLUG - BLANKING from the pipe (5).
(8) Install the new AIPC 35-12-01-01-010 BUSH (4) on the pipe (5).
(9) Install the pipe (5) on the solenoid valve (6).
(10) TORQUE the coupling nut of the pipe (5) to between 20.3 and 14.7 m.N (14.97 and 10.84 lbf.ft )
.CAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
(11) Connect the electrical connector (9) to the solenoid valve (6).B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 35-13-51-790-051-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | OXYGEN/CREW/OXY/SPLY | 1HT | HA01 |
C. Test of the Solenoid Valve
(1) On the ECAM select DOOR/OXY page.
The OXY LO PR legend comes amber.
(2) On the panel 21VU, push the OXYGEN/CREW SUPPLY pushbutton switch, the OFF legend goes off.
On ECAM no change.
(3) Apply the solution Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the mechanical connections.
(4) Very slowly open the valve of the cylinder (5750HM) 3.5 to 4 turns.
(5) Let the pressure become stable. This occurs after approximately 90 seconds.
(6) Fully open the cylinder valve.
(8) Rub off the solution Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) .
(9) On the C/B panel 49VU open the circuit breaker 1HT:
(12) On the oxygen-mask stowage box, operate the PRESS TO TEST AND RESET control slide a sufficient number of times to make the system empty.
(13) On the DOOR page of the lower display unit of the ECAM system, the OXY LO PR legend comes on amber.
Subtask 35-13-51-790-051-D ** ON A/C NOT FOR ALL (1) On the ECAM select DOOR/OXY page.
The OXY LO PR legend comes amber.
(2) On the panel 21VU, push the OXYGEN/CREW SUPPLY pushbutton switch, the OFF legend goes off.
On ECAM no change.
(3) Apply the solution Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the mechanical connections.
(4) Very slowly open the valve of the cylinder (5750HM) 3.5 to 4 turns.
(5) Let the pressure become stable. This occurs after approximately 90 seconds.
(6) Fully open the cylinder valve.
- On ECAM the OXY LO PR legend goes off.
(8) Rub off the solution Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) .
(9) On the C/B panel 49VU open the circuit breaker 1HT:
- On ECAM the OXY LO PR legend remains off.
- On ECAM no change.
(12) On the oxygen-mask stowage box, operate the PRESS TO TEST AND RESET control slide a sufficient number of times to make the system empty.
(13) On the DOOR page of the lower display unit of the ECAM system, the OXY LO PR legend comes on amber.
NOTE: The OXY LO PR legend goes off when the LP oxygen-supply solenoid-valve (3HT) is open.
C. Test of the Solenoid Valve
(1) On the ECAM select DOOR/OXY page.
The OXY LO PR legend comes amber.
(2) On the panel 21VU, push the OXYGEN/CREW SUPPLY pushbutton switch, the OFF legend goes off.
On ECAM no change.
(3) Apply the solution Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the mechanical connections.
(4) Turn the valve of the cylinder (5750 HM) very slowly until it is fully open.
(6) Rub off the solution Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) .
(7) On the C/B panel 49VU open the circuit breaker 1HT:
(10) On the oxygen-mask stowage box, operate the PRESS TO TEST AND RESET control slide a sufficient number of times to make the system empty.
(11) On the DOOR page of the lower display unit of the ECAM system, the OXY LO PR legend comes on amber.
5. Close-up(1) On the ECAM select DOOR/OXY page.
The OXY LO PR legend comes amber.
(2) On the panel 21VU, push the OXYGEN/CREW SUPPLY pushbutton switch, the OFF legend goes off.
On ECAM no change.
(3) Apply the solution Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the mechanical connections.
(4) Turn the valve of the cylinder (5750 HM) very slowly until it is fully open.
- On ECAM the OXY LO PR legend goes off.
(6) Rub off the solution Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) .
(7) On the C/B panel 49VU open the circuit breaker 1HT:
- On ECAM the OXY LO PR legend remains off.
- On ECAM no change.
(10) On the oxygen-mask stowage box, operate the PRESS TO TEST AND RESET control slide a sufficient number of times to make the system empty.
(11) On the DOOR page of the lower display unit of the ECAM system, the OXY LO PR legend comes on amber.
NOTE: The OXY LO PR legend goes off when the LP oxygen-supply solenoid-valve (3HT) is open.
Subtask 35-13-51-860-051-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 35-13-51-410-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
B. Close Access
(1) Close the access door 812.
(2) Remove the access platform(s).
(1) Close the access door 812.
(2) Remove the access platform(s).
LP Oxygen-Supply Solenoid-Valve