W DOC AIRBUS | AMM A320F

Installation of the VOR/ADF/DME RMI


TASK 34-57-22-400-002-A
Installation of the VOR/ADF/DME RMI


ZONE: 211
FIN: 21FN ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
211
COCKPIT
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 33-13-00-710-001-A
Operational Test of the Instrument and Panel Integral-Lighting
TASK 34-14-00-740-001-A
Interface Test of the IR
3. Job Set-up
Subtask 34-57-22-865-054-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUNAV/VOR/DME/RMI12FNF13
49VUNAV PROBES/ADIRU3/PWR/SWTG8FPF09
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
4. Procedure
Subtask 34-57-22-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the VOR/ADF/DME RMI
   (1) Clean the component interface and/or the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the blanking caps from the electrical connectors (3) and (4).
   (4) Make sure that the electrical connectors are clean and in the correct condition.
   (5) Connect the electrical connector (4) to the VOR/ADF/DME RMI (2).
   (6) Install the VOR/ADF/DME RMI (2) in its housing.
   (7) Tighten the screws (1).
Subtask 34-57-22-865-066-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUNAV/VOR/DME/RMI12FNF13
49VUNAV PROBES/ADIRU3/PWR/SWTG8FPF09
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
Subtask 34-57-22-710-052-A ** ON A/C NOT FOR ALL
C. Test of the VOR/ADF/DME RMI (21FN)
   (1) Do the BITE test of the IR system (but read only the heading value on the RMI).
(Ref. AMM TASK 34-14-00-740-001)
   (2) Do the operational test of the instrument and panel integral lighting (Ref. AMM TASK 33-13-00-710-001)
5. Close-up
Subtask 34-57-22-410-051-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) Install the thermoformed cover on the center instrument panel.
   (2) Make sure that the work area is clean and clear of tools and other items.
[Rev.10 from 2021] 2026.04.02 06:23:35 UTC