Installation of the DME Antenna
TASK 34-51-11-400-002-A
Installation of the DME Antenna
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 34-51-11-865-053-A
Obey the indications given in the table that follows if it is not possible to:
This table gives the time limits that are applicable for the sealant installation on the Distance Measuring Equipment (DME) antenna.
These limits are adapted to:
Subtask 34-51-11-420-050-A
Subtask 34-51-11-410-050-A
[Rev.10 from 2021]
2026.04.01 01:02:33 UTC
Installation of the DME Antenna
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SCRAPER - NON METALLIC |
| No specific | AR | TAPE - MASKING |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04QAB2) | Coating_- Flexible Structure |
| (Material No.04TMB2) | Varnish-- Electrical Bonding Structure |
| (Material No.06AAB1) | Polysulfide Sealant-General Purpose Fillet - |
| (Material No.06ABF1) | Polysulfide Sealant-Fuel Tank Quick Curing - |
| (Material No.06AEB2) | Polysulfide Sealant-Low Adhesion Fillet Structure |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14DBB1) | Release Agent-- Liquid Wax - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 121 | AVIONICS COMPARTMENT |
| 127 | REAR AVIONIC COMPARTMENT |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 6 | O-RING SEAL | AIPC 34-51-11-01-010 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 34-51-00-710-001-A | Operational Test of the DME |
| TASK 34-51-00-720-001-A | Functional Test of the DME |
| TASK 51-76-11-300-001-A | Repair of the Sealing |
Subtask 34-51-11-865-053-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 3SD1 (ANTENNADME, 1) | |||
| 49VU | NAV/DME/1 | 1SD1 | G14 |
| FOR FIN: 3SD2 (ANTENNADME, 2) | |||
| 121VU | COM NAV/DME/2 | 1SD2 | K06 |
WARNING:
DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
Subtask 34-51-11-914-053-A - FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
CAUTION:
AFTER THREE DAYS OF FLIGHT WITHOUT SEALANT, DO THE FULL INSTALLATION OF THE ANTENNA:
- REMOVE THE ANTENNA
- CLEAN THE FUSELAGE AND ANTENNA SURFACES AND REMOVE ALL SIGNS OF HUMIDITY.
CAUTION:
AFTER TEN DAYS OF FLIGHT WITH INTERPOSITION SEALANT OR A GEL/ SILICON GASKET, DO THESE STEPS:
A. Aircraft Antenna Sealant-Exemption - CLEAN THE AREA AROUND THE ANTENNA, AND
- APPLY A SEALANT BEAD AROUND THE ANTENNA AND/OR SEALANT ON THE HEADS OF THE SCREWS.
Obey the indications given in the table that follows if it is not possible to:
- Apply the sealant.
- Let the sealant cure during the applicable curing time.
This table gives the time limits that are applicable for the sealant installation on the Distance Measuring Equipment (DME) antenna.
These limits are adapted to:
- The antenna installation configuration
- The antenna location
- The sensitive condition of the antenna to water infiltration
- The available condition of the sealant.
| Configuration of the antenna installation | If the airline has sealant but cannot wait until the sealant is cured | If the airline has no sealant available |
|---|---|---|
Sealant between the antenna and the fuselage (interposition sealant):
|
|
|
NOTE: When there is no sealing bead, there is a risk of aerodynamic noise.
B. Installation of the DME Antenna
(1) Remove the used sealant from the fuselage with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the SCRAPER - NON METALLIC.
(a) If you install the same antenna, clean it with a Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Do an inspection of the component interfaces and the adjacent area.
(a) Make sure that the attachment screw-head recesses of the antenna have no signs of paint, corrosion or sealant. You will use the attachment screws to do the electrical bonding of the antenna.
(3) Apply the TAPE - MASKING to:
(5) Apply the Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) on the antenna (4) mount and on the fuselage (1) (Ref. AMM TASK 51-76-11-300-001).
(a) Make sure that there is no sealant in the screw holes.
(6) Remove the blanking caps from the coaxial connectors (2) and (3).
(7) Install the new AIPC 34-51-11-01-010 O-RING SEAL (6).
(8) Connect the coaxial connector (2) to the antenna connector (3).
(9) Put the antenna (4) in position on the fuselage (1).
(10) Attach the antenna (4) with the screws (5).
(11) Remove the sealant which is not necessary with the SCRAPER - NON METALLIC.
(12) Make sure that the bonding contact resistance between the antenna (4) and the fuselage structure (1) is not more than 5 milliohms (Ref. AMM TASK 20-28-00-912-802).
(13) Apply a sealing bead with the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) , or as an alternative the Polysulfide Sealant-Fuel Tank Quick Curing - (Material No.06ABF1) , around the antenna (4) (Ref. AMM TASK 51-76-11-300-001).
(14) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) , or as an alternative the Polysulfide Sealant-Fuel Tank Quick Curing - (Material No.06ABF1) , on the heads of the screws (5).
(15) Make the contour of the screws (5) and the antenna (4) smooth.
(16) Apply the Coating_- Flexible Structure (Material No.04QAB2) to the sealant around the base of the antenna (4).
Subtask 34-51-11-865-054-A (1) Remove the used sealant from the fuselage with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and the SCRAPER - NON METALLIC.
(a) If you install the same antenna, clean it with a Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Do an inspection of the component interfaces and the adjacent area.
(a) Make sure that the attachment screw-head recesses of the antenna have no signs of paint, corrosion or sealant. You will use the attachment screws to do the electrical bonding of the antenna.
(3) Apply the TAPE - MASKING to:
- The structure (1)
- The edge of the antenna (4)
- The screw holes
- The hole for the antenna connector.
(5) Apply the Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) on the antenna (4) mount and on the fuselage (1) (Ref. AMM TASK 51-76-11-300-001).
(a) Make sure that there is no sealant in the screw holes.
(6) Remove the blanking caps from the coaxial connectors (2) and (3).
(7) Install the new AIPC 34-51-11-01-010 O-RING SEAL (6).
(8) Connect the coaxial connector (2) to the antenna connector (3).
(9) Put the antenna (4) in position on the fuselage (1).
(10) Attach the antenna (4) with the screws (5).
(11) Remove the sealant which is not necessary with the SCRAPER - NON METALLIC.
(12) Make sure that the bonding contact resistance between the antenna (4) and the fuselage structure (1) is not more than 5 milliohms (Ref. AMM TASK 20-28-00-912-802).
(13) Apply a sealing bead with the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) , or as an alternative the Polysulfide Sealant-Fuel Tank Quick Curing - (Material No.06ABF1) , around the antenna (4) (Ref. AMM TASK 51-76-11-300-001).
(14) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) , or as an alternative the Polysulfide Sealant-Fuel Tank Quick Curing - (Material No.06ABF1) , on the heads of the screws (5).
(15) Make the contour of the screws (5) and the antenna (4) smooth.
(16) Apply the Coating_- Flexible Structure (Material No.04QAB2) to the sealant around the base of the antenna (4).
NOTE: It is not mandatory to paint the sealant around the base of the antenna and on the heads of the screws.
(17) Apply the Varnish-- Electrical Bonding Structure (Material No.04TMB2) to the sealant on the heads of the screws (5). C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 34-51-11-720-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 3SD1 (ANTENNADME, 1) | |||
| 49VU | NAV/DME/1 | 1SD1 | G14 |
| FOR FIN: 3SD2 (ANTENNADME, 2) | |||
| 121VU | COM NAV/DME/2 | 1SD2 | K06 |
D. Do the functional test of the DME with tool (Ref. AMM TASK 34-51-00-720-001) or the operational test of the DME without tool (Ref. AMM TASK 34-51-00-710-001).
5. Close-upSubtask 34-51-11-410-050-A
A. Make sure that the work area is clean and clear of tools and other items.
DME Antenna