BITE Test of the DME
TASK 34-51-00-740-002-A
BITE Test of the DME
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 34-51-00-860-054-A
Subtask 34-51-00-740-051-I ** ON A/C NOT FOR ALL
Subtask 34-51-00-860-055-A
[Rev.10 from 2021]
2026.04.02 07:15:37 UTC
BITE Test of the DME
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-010-A | Procedure to Get Access to the SYSTEM REPORT/TEST NAV Page |
| TASK 34-10-00-860-002-A | ADIRS Start Procedure |
| TASK 34-10-00-860-004-A | Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-01 | Automatic Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-02 | Inertial Reference (IR) Alignment-Procedure to do a Check of the Links between each Flight Management and Guidance Computer (FMGC) and the three Air Data/Inertial Reference Units (ADIRUs) |
| TASK 34-10-00-860-005-A | ADIRS Stop Procedure |
Subtask 34-51-00-860-054-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the EFIS control sections of the FCU:
(Ref. AMM TASK 31-32-00-860-010).
(5) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(6) Do the IR alignment procedure
(Ref. AMM TASK 34-10-00-860-004).
Subtask 34-51-00-865-056-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the EFIS control sections of the FCU:
- set the mode selector switches to ROSE or ARC
- set the ADF/VOR selector switches to VOR
- push the ILS pushbutton switches.
- set the ON/OFF switches to ON
- set a non local frequency of a VOR/DME1 and VOR/DME2.
VOR/DME - Frequency Selection ** ON A/C NOT FOR ALL
VOR/DME - Frequency Selection ** ON A/C NOT FOR ALL
VOR/DME - Frequency Selection ** ON A/C NOT FOR ALL
(Ref. AMM TASK 31-32-00-860-010).
(5) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(6) Do the IR alignment procedure
(Ref. AMM TASK 34-10-00-860-004).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | NAV/VOR/DME/RMI | 12FN | F13 |
| ** ON A/C ALL | |||
| 49VU | NAV/DME/1 | 1SD1 | G14 |
| 121VU | COM NAV/DME/2 | 1SD2 | K06 |
Subtask 34-51-00-740-051-I ** ON A/C NOT FOR ALL
A. BITE Test of the DME
Subtask 34-51-00-740-051-P ** ON A/C NOT FOR ALL NOTE: The DME and the VOR/DME data come into view on the ND. The ILS/DME data come into view on the PFD.
NOTE: During the BITE TEST (DME1 or 2) by the MCDU, the indications related to the two receivers (CAPT and F/O) are shown at the same time. This has no effect on the test or component operation.
| ACTION | RESULT |
|---|---|
| 1.On the MCDU: | On the MCDU: |
|
|
|
|
|
|
| | From 0 to 4s:
|
| | From 4 to 7s:
|
| | From 7 to 10s:
|
| On the MCDU:
|
| The test procedure stops. |
A. BITE Test of the DME
5. Close-upNOTE: The DME and the VOR/DME data come into view on the ND. The ILS/DME data come into view on the PFD.
NOTE: During the BITE TEST (DME1 or 2) by the MCDU, the indications related to the two receivers (CAPT and F/O) are shown at the same time. This has no effect on the test or component operation.
| ACTION | RESULT |
|---|---|
| 1.On the MCDU: | On the MCDU: |
|
|
|
NOTE: Ignore all the checks to be done on the DDRMI. |
|
|
| | From 0 to 4s:
|
| On the MCDU:
|
| The test procedure stops. |
Subtask 34-51-00-860-055-A
A. Put the aircraft back to its initial configuration.
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) On the center pedestal, on the MCDU, push the line key adjacent to the RETURN indication until the MCDU MENU page comes into view.
(3) On the RMP, set the ON/OFF switch to OFF.
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(5) Make sure that the work area is clean and clear of tools and other items.
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) On the center pedestal, on the MCDU, push the line key adjacent to the RETURN indication until the MCDU MENU page comes into view.
(3) On the RMP, set the ON/OFF switch to OFF.
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(5) Make sure that the work area is clean and clear of tools and other items.