Uploading of the RAAS Configuration Database (RCD)
TASK 34-48-00-610-003-A
Uploading of the RAAS Configuration Database (RCD)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 34-48-00-970-051-A ** ON A/C NOT FOR ALL
Subtask 34-48-00-410-054-A ** ON A/C NOT FOR ALL
[Rev.9 from 2019]
2026.04.02 06:23:29 UTC
Uploading of the RAAS Configuration Database (RCD)
ZONE: 128
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 128 | REAR AVIONIC COMPARTMENT |
| 824 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 34-48-00-710-001-B | Operational Test of the Enhanced GPWS Ground Self-Test Function |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
NOTE: Refer to the equipment-manufacturer Service Bulletin related to the version of the RCD database that you upload.
Subtask 34-48-00-861-056-A ** ON A/C NOT FOR ALL Subtask 34-48-00-010-054-A ** ON A/C NOT FOR ALL B. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at access door 824 in zone 128.
(2) Open access door 824.
Subtask 34-48-00-865-068-A ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) in position at access door 824 in zone 128.
(2) Open access door 824.
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 34-48-00-970-066-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | EIS/GPWS/115VAC | 3WZ | P07 |
D. Preparation for the Loading of the PCMCIA Card Software
(2) Open the door on the face of the Enhanced GPWC.
(3) Put the PCMCIA card into the PCMCIA card slot.
Subtask 34-48-00-865-097-A ** ON A/C NOT FOR ALL NOTE: To do the uploading of the RAAS Configuration Database (RAAS: Runway Awareness and Advisory System), the Enhanced Ground Proximity Warning Computer (GPWC) terrain database must be version 435 minimum.
(1) Get the PCMCIA card with RCD software from the storage box. (2) Open the door on the face of the Enhanced GPWC.
(3) Put the PCMCIA card into the PCMCIA card slot.
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | EIS/GPWS/115VAC | 3WZ | P07 |
Subtask 34-48-00-970-051-A ** ON A/C NOT FOR ALL
A. Uploading of the RAAS Configuration Database (RCD)
(1) Make sure that the COMPUTER OK LED on the face of the Enhanced GPWC is on.
(2) During the uploading, the IN PROG LED stays on and the COMPUTER OK LED is off.
(3) When the uploading is completed, the XFER COMP LED comes on.
(4) Remove the PCMCIA card from the Enhanced GPWC.
(5) After approximately 15 seconds, the COMPUTER OK LED comes on to tell the operator that the uploading of the PCMCIA card contents is completed.
(6) Close the door on the face of the Enhanced GPWC.
(7) Put the PCMCIA card with RCD software in the storage box.
Subtask 34-48-00-710-068-A ** ON A/C NOT FOR ALL (1) Make sure that the COMPUTER OK LED on the face of the Enhanced GPWC is on.
(2) During the uploading, the IN PROG LED stays on and the COMPUTER OK LED is off.
(3) When the uploading is completed, the XFER COMP LED comes on.
(4) Remove the PCMCIA card from the Enhanced GPWC.
(5) After approximately 15 seconds, the COMPUTER OK LED comes on to tell the operator that the uploading of the PCMCIA card contents is completed.
(6) Close the door on the face of the Enhanced GPWC.
(7) Put the PCMCIA card with RCD software in the storage box.
B. Do the Operational Test of the Enhanced GPWC (Ref. AMM TASK 34-48-00-710-001).
5. Close-up- Make sure that the last five digits of the RCD software P/N on the PCMCIA card are the same as the RCD software P/N read on the Capt or F/O ND.
Subtask 34-48-00-410-054-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
Subtask 34-48-00-862-055-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
Enhanced GPWC Face