W DOC AIRBUS | AMM A320F

Operational Check and Detailed Inspection for Contamination of Radio Altimeter Fan


TASK 34-42-00-750-001-A
Operational Check and Detailed Inspection for Contamination of Radio Altimeter Fan


WARNING: MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
ZONE: 152
1. Reason for the Job
Refer to the MPD TASK: 344200-01
OPERATIONAL CHECK AND DETAILED INSPECTION FOR CONTAMINATION OF RADIO ALTIMETER FAN

2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
No specific
AR
BLOWING EQUIPMENT - DRY AIR
No specific
AR
BRUSH - BRISTLED, SOFT
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
152
AFT CARGO COMPARTMENT
152GW, 826
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 22-97-00-710-001-A
Operational Test of the LAND CAT III Capability
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 34-42-00-740-002-A
BITE Test of the Radio Altimeter
TASK 34-42-33-000-001-A
Removal of the Radio Altimeter Transceiver
TASK 34-42-33-400-001-A
Installation of the Radio Altimeter Transceiver
TASK 34-42-45-000-001-A
Removal of the Radio Altimeter-Transceiver Fan
TASK 34-42-45-400-001-A
Installation of the Radio Altimeter-Transceiver Fan
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 34-42-00-860-056-A
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 34-42-00-010-050-A
B. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at the aft cargo door 826.
   (2) Open the aft cargo door 826 (Ref. AMM TASK 52-30-00-860-001).
   (3) Remove the sidewall panel 152GW.
Subtask 34-42-00-865-055-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUCOM NAV/RAD ALTM/21SA2K12
121VUCOM NAV/RAD ALTM/11SA1K11
4. Procedure
Subtask 34-42-00-020-050-A
A. Remove the two Radio Altimeter Transceivers (Ref. AMM TASK 34-42-33-000-001).
Subtask 34-42-00-210-051-A
B. Detailed Inspection of the two RA transceiver Fans
   (1) Do a detailed visual inspection of the two RA transceiver fans and of the fan housing.
   (2) Remove the RA transceiver fans (Ref. AMM TASK 34-42-45-000-001).
   (3) Lock the RA transceiver fans and their housings to prevent movement.
NOTE: When you clean the fan with the air blower, the fan can turn too quickly and thus a fault can occur.
   (4) Clean the RA transceiver fans and their housings with a BRUSH - BRISTLED, SOFT and/or an BLOWING EQUIPMENT - DRY AIR.
   (5) Install the RA transceiver fans (Ref. AMM TASK 34-42-45-400-001).
Subtask 34-42-00-420-050-A
C. Install the two Radio Altimeter Transceivers (Ref. AMM TASK 34-42-33-400-001).
   (1) Close the circuit breakers 1SA1 and 1SA2 on the panel 121VU.
Subtask 34-42-00-720-053-A
D. Functional Test
ACTION
RESULT
1.On the rear circuit breaker panel 121VU:
In the aft cargo compartment (zone 152, door 826), below the transceiver mount:
  • Open the circuit breaker 1SA1 (1SA2).
  • Make sure that the RA transceiver fan 3SA1 (3SA2) does not blow.
  • Close the circuit breaker 1SA1 (1SA2).
  • Make sure that the RA transceiver fan 3SA1 (3SA2) blows air up.
Subtask 34-42-00-740-052-A
E. Do the BITE test of the radio altimeter (Ref. AMM TASK 34-42-00-740-002).
NOTE: If the airline operates the aircraft in CAT III conditions, you must also do the LAND CAT III capability test (Ref. AMM TASK 22-97-00-710-001).
5. Close-up
Subtask 34-42-00-410-050-A
A. Close Access
   (1) Install the sidewall panel 152GW.
   (2) Close the aft cargo door 826 (Ref. AMM TASK 52-30-00-860-002).
   (3) Remove the access platform(s).
Subtask 34-42-00-865-059-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUCOM NAV/RAD ALTM/21SA2K12
121VUCOM NAV/RAD ALTM/11SA1K11
Subtask 34-42-00-860-057-A
C. Put the aircraft back to its initial configuration.
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
   (2) Make sure that the work area is clean and clear of tools and other items.
[Rev.10 from 2021] 2026.04.02 07:15:10 UTC