Deactivation of the Radio Altimeter (RA) Systems (FAA Only)
TASK 34-42-00-040-801-A
Deactivation of the Radio Altimeter (RA) Systems (FAA Only)
MMEL 34-42-01
RADIO ALTIMETER (RA) SYSTEMS (FAA ONLY)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 34-42-00-861-050-A
Subtask 34-42-00-040-050-A
Subtask 34-42-00-942-050-A
[Rev.10 from 2021]
2026.04.02 06:23:23 UTC
Deactivation of the Radio Altimeter (RA) Systems (FAA Only)
ZONE: 210
1. Reason for the JobMMEL 34-42-01
RADIO ALTIMETER (RA) SYSTEMS (FAA ONLY)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 34-42-00-861-050-A
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 34-42-00-865-063-A (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | COM NAV/RAD ALTM/2 | 1SA2 | K12 |
| 121VU | COM NAV/RAD ALTM/1 | 1SA1 | K11 |
Subtask 34-42-00-040-050-A
A. Deactivation of the RA Systems
(1) If RA 1 is inoperative, do the step that follow:
(a) On circuit breaker panel 121VU:
1 Open, safety and tag this(these) circuit breaker(s):
(a) On circuit breaker panel 121VU:
1 Open, safety and tag this(these) circuit breaker(s):
5. Close-up(1) If RA 1 is inoperative, do the step that follow:
(a) On circuit breaker panel 121VU:
1 Open, safety and tag this(these) circuit breaker(s):
- 1SA1.
(a) On circuit breaker panel 121VU:
1 Open, safety and tag this(these) circuit breaker(s):
- 1SA2.
Subtask 34-42-00-942-050-A
A. Put the aircraft back to its initial configuration.
(1) Make an entry in the logbook.
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(3) Make sure that the work area is clean and clear of tools and other items.
(1) Make an entry in the logbook.
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(3) Make sure that the work area is clean and clear of tools and other items.