BITE Test of the Onboard Aircraft Navigation System (OANS) (System Test)
TASK 34-38-00-740-801-A
BITE Test of the Onboard Aircraft Navigation System (OANS) (System Test)
To do a check of:
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 34-38-00-869-050-A ** ON A/C NOT FOR ALL
Subtask 34-38-00-740-050-A ** ON A/C NOT FOR ALL
Subtask 34-38-00-860-062-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:00:47 UTC
BITE Test of the Onboard Aircraft Navigation System (OANS) (System Test)
ZONE: 210
1. Reason for the JobTo do a check of:
- The integrity of the OANS
- The execution of the safety tests
- The validity of the external buses
- The operational program configuration display
- The video output.
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-010-A | Procedure to Get Access to the SYSTEM REPORT/TEST NAV Page |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 34-10-00-860-004-A | Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-01 | Automatic Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-02 | Inertial Reference (IR) Alignment-Procedure to do a Check of the Links between each Flight Management and Guidance Computer (FMGC) and the three Air Data/Inertial Reference Units (ADIRUs) |
| TASK 34-10-00-860-005-A | ADIRS Stop Procedure |
| TASK 34-38-00-710-801-A | Operational Test of the Onboard Airport Navigation System (OANS) |
Subtask 34-38-00-869-050-A ** ON A/C NOT FOR ALL
A. Maintenance Advice
If the interactive BITE test of the OANS does not operate correctly, do not do this procedure.
Subtask 34-38-00-860-061-A ** ON A/C NOT FOR ALL If the interactive BITE test of the OANS does not operate correctly, do not do this procedure.
- To make sure that the OANS operates correctly, do the operational test of the OANS (Ref. AMM TASK 34-38-00-710-801).
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) Do the IR alignment procedure (Ref. AMM TASK 34-10-00-860-004)
(4) Do the procedure to get access to the SYSTEM REPORT/TEST NAV page (Ref. AMM TASK 31-32-00-860-010).
Subtask 34-38-00-865-054-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) Do the IR alignment procedure (Ref. AMM TASK 34-10-00-860-004)
(4) Do the procedure to get access to the SYSTEM REPORT/TEST NAV page (Ref. AMM TASK 31-32-00-860-010).
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | OANS CMPTR | 2FX | L10 |
Subtask 34-38-00-740-050-A ** ON A/C NOT FOR ALL
A. BITE Test of the OANS (System Test)
5. Close-upNOTE: During this procedure, if an error message is shown, record this message. Then do the related trouble shooting procedure.
NOTE: During the test, obey the instructions shown on the Navigation Displays (ND).
| ACTION | RESULT |
|---|---|
1.On the CAPT and F/O FCUs:
| |
|
|
| 2.On the MCDU: | On the MCDU: |
|
|
NOTE: The system test includes the video test. |
|
| | On the upper ECAM DU:
|
| 3.On the CAPT FCU control panel: | |
NOTE: If you do not do this, the OPC pages will stay into view for 180 seconds and then the video test pattern will come into view. |
|
| | On the upper ECAM DU:
|
NOTE: If the video test is OK, no action is required. | |
On the CAPT and F/O EFIS control panels:
| |
When the test sequence is displayed:
|
|
Subtask 34-38-00-860-062-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
OANS Video Pattern