W DOC AIRBUS | AMM A320F

Deactivation of the OANC


TASK 34-38-00-040-801-A
Deactivation of the OANC


ZONE: 210
1. Reason for the Job
To do a deactivation of the OANC.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
3. Job Set-up
Subtask 34-38-00-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
Subtask 34-38-00-865-056-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUOANS CMPTR2FXL10
4. Procedure
Subtask 34-38-00-040-050-A ** ON A/C NOT FOR ALL
A. Deactivation of the OANC
   (1) On the panel 121VU
Open, safety and tag this(these) circuit breaker(s):
  • 2FX
NOTE: After deactivation of the OANC, the amber NAV ARPT NAV FAULT message is shown on the EWD.
NOTE: After deactivation of the OANC, the amber NOT AVAIL message is shown on the ND if the FCU range is on ZOOM notch.
5. Close-up
Subtask 34-38-00-860-051-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Make an entry in the logbook.
   (3) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
   (4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:23:19 UTC