W DOC AIRBUS | AMM A320F

Removal of the ILS Receiver


TASK 34-36-31-000-001-A
Removal of the ILS Receiver


ZONE: 121
ZONE: 122
FIN: 2RT1 ** ON A/C NOT FOR ALL
FIN: 2RT2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 1M(3 FT)
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
121
AVIONICS COMPARTMENT
122
AVIONICS COMPARTMENT
811
3. Job Set-up
Subtask 34-36-31-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 2RT1 (RECEIVERILS, 1)
49VUNAV/ILS/11RT1G12
FOR FIN: 2RT2 (RECEIVERILS, 2)
121VUCOM NAV/ILS/21RT2K09
Subtask 34-36-31-010-050-A
B. Get Access
   (1) Put the ACCESS PLATFORM 1M(3 FT) in position at the access door 811 in zone 122.
   (2) Open the access door 811.
4. Procedure
Subtask 34-36-31-020-050-A
A. Removal of the ILS Receiver (2RT1, 2RT2)
   (1) Loosen the nuts (4).
   (2) Lower the nuts (4).
   (3) Pull the ILS receiver (1) on its rack (3) to disconnect the electrical connectors (2).
   (4) Remove the ILS receiver (1) from its rack.
   (5) Put CAP - BLANKING on the disconnected electrical connectors (2).
[Rev.9 from 2019] 2026.04.02 06:23:18 UTC