Operational Test of the GLS
TASK 34-36-00-710-010-A
Operational Test of the GLS
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 34-36-00-861-062-A ** ON A/C NOT FOR ALL Subtask 34-36-00-860-142-A ** ON A/C NOT FOR ALL
Subtask 34-36-00-710-068-A ** ON A/C NOT FOR ALL
Subtask 34-36-00-860-143-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:23:17 UTC
Operational Test of the GLS
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 34-36-00-861-062-A ** ON A/C NOT FOR ALL Subtask 34-36-00-860-142-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
(1) Do the EIS start procedure (for PFD only) (Ref. AMM TASK 31-60-00-860-001).
(2) On the center pedestal, on the RMP1 and RMP2, set the ON/OFF switch to ON.
Subtask 34-36-00-865-116-A ** ON A/C NOT FOR ALL (1) Do the EIS start procedure (for PFD only) (Ref. AMM TASK 31-60-00-860-001).
(2) On the center pedestal, on the RMP1 and RMP2, set the ON/OFF switch to ON.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | NAV/MMR/1 | 42RT1 | G12 |
| 121VU | COM NAV/MMR/2 | 42RT2 | L07 |
Subtask 34-36-00-710-068-A ** ON A/C NOT FOR ALL
A. Operational Test of the GLS
5. Close-up| ACTION | RESULT |
|---|---|
| 1.On the RMP1 (RMP2): | On the RMP1 (RMP2): |
|
|
| |
|
|
|
|
|
|
2.On the CAPT and F/O EFIS control sections of the FCU:
| On the CAPT and the F/O PFD's:
|
|
|
3.On the RMP1 (RMP2):
| On the RMP1 (RMP2):
|
Subtask 34-36-00-860-143-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) On the center pedestal on the RMP1 and RMP2, set the ON/OFF switch to OFF.
(2) Do the EIS stop procedure
(for PFD only) (Ref. AMM TASK 31-60-00-860-002).
Subtask 34-36-00-862-062-A ** ON A/C NOT FOR ALL (1) On the center pedestal on the RMP1 and RMP2, set the ON/OFF switch to OFF.
(2) Do the EIS stop procedure
(for PFD only) (Ref. AMM TASK 31-60-00-860-002).