Installation of the Standby Horizon Indicator
TASK 34-22-24-400-001-A
Installation of the Standby Horizon Indicator
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 34-22-24-865-054-A ** ON A/C NOT FOR ALL
Subtask 34-22-24-420-050-A ** ON A/C NOT FOR ALL
Subtask 34-22-24-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:23:15 UTC
Installation of the Standby Horizon Indicator
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 211 | COCKPIT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 33-13-00-710-001-A | Operational Test of the Instrument and Panel Integral-Lighting |
Subtask 34-22-24-865-054-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | NAV/STBY/HORIZON | 5FN | F12 |
| 122VU | LIGHTING/INSTL LT/MAIN INST/PNL AND/PED | 4LF | Y04 |
Subtask 34-22-24-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Standby Horizon Indicator (7FN)
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the electrical connectors (4) and (5).
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector (5) to the standby horizon indicator (3).
(6) Install the standby horizon indicator (3) in its housing.
(7) Tighten the two screws (2).
Subtask 34-22-24-865-053-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the electrical connectors (4) and (5).
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector (5) to the standby horizon indicator (3).
(6) Install the standby horizon indicator (3) in its housing.
(7) Tighten the two screws (2).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 34-22-24-710-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | NAV/STBY/HORIZON | 5FN | F12 |
| 122VU | LIGHTING/INSTL LT/MAIN INST/PNL AND/PED | 4LF | Y04 |
C. Operational Test
(1) Do the operational test of the instrument and panel integral lighting
(Ref. AMM TASK 33-13-00-710-001).
(2) Make sure that the flag is out of view.
(3) One minute and 30 seconds after the energization, pull the resetting knob until the horizon line is stable. Release the knob rapidly.
(4) Make sure that the roll index reads zero.
(5) Make sure that the horizon line is stable and in line with the aircraft symbol.
5. Close-up(1) Do the operational test of the instrument and panel integral lighting
(Ref. AMM TASK 33-13-00-710-001).
(2) Make sure that the flag is out of view.
(3) One minute and 30 seconds after the energization, pull the resetting knob until the horizon line is stable. Release the knob rapidly.
(4) Make sure that the roll index reads zero.
(5) Make sure that the horizon line is stable and in line with the aircraft symbol.
Subtask 34-22-24-410-050-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Install the thermoformed cover on the center instrument panel.
(2) Make sure that the work area is clean and clear of tools and other items.
(1) Install the thermoformed cover on the center instrument panel.
(2) Make sure that the work area is clean and clear of tools and other items.
Standby Horizon Indicator