Installation of the Standby Altimeter


TASK 34-21-22-400-001-A
Installation of the Standby Altimeter


ZONE: 211
FIN: 3FN ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
211
COCKPIT
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 25-13-41-000-002-A
Removal of the Sidewall Panels
TASK 25-13-41-400-002-A
Installation of the Sidewall Panels
TASK 33-13-00-710-001-A
Operational Test of the Instrument and Panel Integral-Lighting
3. Job Set-up
Subtask 34-21-22-865-051-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUNAV/STBY/ALTM16FNF14
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
Subtask 34-21-22-010-051-A ** ON A/C NOT FOR ALL
B. Remove the sidewall panel 211LW (Ref. AMM TASK 25-13-41-000-002).
4. Procedure
Subtask 34-21-22-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Standby Altimeter (3FN)
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the blanking plugs from the line ends (3) and (5).
   (4) Make a loop of the flexible hose and connect the quick-disconnect coupling (5) to the receptacle (3) of the standby altimeter (2).
   (5) Make sure that you can see the blue ring on the quick-disconnect coupling.
   (6) Pull the quick-disconnect coupling to make sure that it is correctly attached.
   (7) Make sure that the quick-disconnect coupling is correctly engaged (the pin located on the quick-disconnect male part is fully engaged into the groove located in the quick-disconnect female part).
   (8) Remove the blanking caps from the electrical connectors (4) and (6).
   (9) Connect the electrical connector (6) to the receptacle (4) of the standby altimeter (2).
   (10) Install the standby altimeter (2) in its housing.
   (11) Look behind the standby altimeter and make sure that the position of the flexible hoses (static pressure line) is satisfactory (no crushing, kinks, creases or folds).
   (12) Tighten the screws (1).
Subtask 34-21-22-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUNAV/STBY/ALTM16FNF14
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
Subtask 34-21-22-710-050-A ** ON A/C NOT FOR ALL
C. Do the operational test of the instrument and panel integral lighting (Ref. AMM TASK 33-13-00-710-001).
5. Close-up
Subtask 34-21-22-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the thermoformed cover on the center instrument panel.
   (2) Install the sidewall 211LW (Ref. AMM TASK 25-13-41-400-002).
   (3) Make sure that the work area is clean and clear of tools and other items.