W DOC AIRBUS | AMM A320F

SYSTEM TEST of the Inertial Reference (IR)


TASK 34-14-00-740-004-A
SYSTEM TEST of the Inertial Reference (IR)


NOTE: If you do the test while the aircraft is in a hangar, the GPS/MMR faults will be generated if the GPS satellite signal is not available.
ZONE: 210
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-32-00-860-010-A
Procedure to Get Access to the SYSTEM REPORT/TEST NAV Page
TASK 34-10-00-860-002-A
ADIRS Start Procedure
TASK 34-10-00-860-005-A
ADIRS Stop Procedure
3. Job Set-up
Subtask 34-14-00-860-061-A
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002)
   (2) Do the Air Data/Inertial Reference System (ADIRS) start procedure (Ref. AMM TASK 34-10-00-860-002).
   (3) Get the SYSTEM REPORT/TEST NAV menu page (Ref. AMM TASK 31-32-00-860-010).
Subtask 34-14-00-875-053-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUNAV PROBES/ADIRU3/PWR/SWTG8FPF09
** ON A/C ALL
49VUNAV PROBES/ADIRU 1/AND AOA 1/26VAC5FP1F07
49VUNAV PROBES/ADIRU1/115VAC4FP1F06
** ON A/C NOT FOR ALL
49VUNAV PROBES/ADIRU3/PWR/SWTG8FPF08
** ON A/C ALL
105VUADIRS/ADIRU1/28VDC6FP1C02
** ON A/C NOT FOR ALL
121VUADIRS/ADIRU/2PWR/SHED10FPN10
** ON A/C ALL
121VUADIRS/ADIRU/3PWR/SWTG9FPN09
121VUADIRS/ADIRU/2/26VAC AND AOA5FP2N08
121VUADIRS/ADIRU/3/26VAC AND AOA5FP3N07
121VUADIRS/ADIRU/2/115VAC4FP2N06
121VUADIRS/ADIRU/3/115VAC4FP3N05
121VUADIRS/ADIRU/2/28VDC6FP2N04
121VUADIRS/ADIRU/3/28VDC6FP3N03
** ON A/C NOT FOR ALL
121VUADIRS/2PWR/SHED &/AOA2 MON10FPN10
4. Procedure
Subtask 34-14-00-740-069-A ** ON A/C NOT FOR ALL
A. SYSTEM TEST of the Inertial Reference (IR)
NOTE: - This test is for system 1. For systems 2 and 3, use the indications between the parentheses.
The actions and the results of this procedure occur on the Multipurpose Control and Display Unit (MCDU) that you operate.
- It is not necessary to do an Inertial References (IR) alignment procedure before you start the IR SYSTEM TEST. An automatic alignment of the IRs occurs during the IR SYSTEM TEST.
- If the IRs are aligned before you start the IR SYSTEM TEST, a new alignment is necessary after the IR SYSTEM TEST (only if the ADIRUs must be operative, if not set the ADIRUs to off).
ACTION
RESULT
1.On the MCDU, on the SYSTEM REPORT/TEST : NAV menu page, push the line key adjacent to the IR 1(2, 3) indication.
  • The IR 1(2,3) page comes into view.
2.On the IR 1(2,3) page, push the line key adjacent to the SYSTEM TEST indication.
  • The IR 1(2,3) SYSTEM TEST page comes into view.
3.On the IR 1(2,3) SYSTEM PAGE page, push the line key adjacent to the START TEST indication.
  • The TEST IN PROGRESS 95 s indication comes into view.
  • At the end of the test, the TEST OK indication comes into view.
4.Push the line key adjacent to the TEST CLOSE UP indication.
  • These indications come into view:
    * TEST CLOSE UP. IR RE-ALIGNMENT
    * ENTER PPOS WITH AN UNUSED MCDU.
  • (Refer to the NOTE given in Para A).
5.Push the line key adjacent to the RETURN indication.
  • The test procedure stops.
Subtask 34-14-00-740-069-B ** ON A/C NOT FOR ALL
A. SYSTEM TEST of the Inertial Reference (IR)
NOTE: - This test is for system 1. For systems 2 and 3, use the indications between the parentheses.
The actions and the results of this procedure occur on the Multipurpose Control and Display Unit (MCDU) that you operate.
- It is not necessary to do an Inertial References (IR) alignment procedure before you start the IR SYSTEM TEST. An automatic alignment of the IRs occurs during the IR SYSTEM TEST.
- If the IRs are aligned before you start the IR SYSTEM TEST, a new alignment is necessary after the IR SYSTEM TEST (only if the ADIRUs must be operative, if not set the ADIRUs to off).
ACTION
RESULT
1.On the SYSTEM REPORT/TEST ATA 34 page, push the line key adjacent to the NAV indication.
  • The SYSTEM REPORT/TEST : NAV menu page comes into view.
2.Push the line key adjacent to the IR 1(2,3) indication.
  • The IR 1(2,3) page comes into view.
3.On the IR 1(2,3) page, push the line key adjacent to the SYSTEM TEST indication.
  • The IR 1(2,3) SYSTEM TEST page comes into view.
4.Push the line key adjacent to the START TEST indication.
  • The TEST IN PROGRESS 40 s indication comes into view.
  • At the end of the test, the TEST OK indication comes into view.
5.Push the line key adjacent to the TEST CLOSE UP indication.
  • These indications come into view:
    * TEST CLOSE UP. IR RE-ALIGNMENT
    * ENTER PPOS WITH THE OTHER MCDU.
  • (Refer to the NOTE given in Para A).
6.Push the line key adjacent to the RETURN indication.
  • The test procedure stops.
5. Close-up
Subtask 34-14-00-860-062-A
A. Put the Aircraft back to its Initial Configuration
   (1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
   (2) On the MCDU, push the line key adjacent to the RETURN indication until the MAINTENANCE MENU 1/2 page comes into view.
   (3) On the MCDU, set the BRT knob to OFF.
   (4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:23:11 UTC