SYSTEM TEST of the Inertial Reference (IR)
TASK 34-14-00-740-004-A
SYSTEM TEST of the Inertial Reference (IR)
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 34-14-00-860-061-A
Subtask 34-14-00-740-069-A ** ON A/C NOT FOR ALL
Subtask 34-14-00-860-062-A
[Rev.10 from 2021]
2026.04.02 07:14:03 UTC
SYSTEM TEST of the Inertial Reference (IR)
NOTE: If you do the test while the aircraft is in a hangar, the GPS/MMR faults will be generated if the GPS satellite signal is not available.
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-010-A | Procedure to Get Access to the SYSTEM REPORT/TEST NAV Page |
| TASK 34-10-00-860-002-A | ADIRS Start Procedure |
| TASK 34-10-00-860-005-A | ADIRS Stop Procedure |
Subtask 34-14-00-860-061-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002)
(2) Do the Air Data/Inertial Reference System (ADIRS) start procedure (Ref. AMM TASK 34-10-00-860-002).
(3) Get the SYSTEM REPORT/TEST NAV menu page (Ref. AMM TASK 31-32-00-860-010).
Subtask 34-14-00-875-053-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002)
(2) Do the Air Data/Inertial Reference System (ADIRS) start procedure (Ref. AMM TASK 34-10-00-860-002).
(3) Get the SYSTEM REPORT/TEST NAV menu page (Ref. AMM TASK 31-32-00-860-010).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | NAV PROBES/ADIRU3/PWR/SWTG | 8FP | F09 |
| ** ON A/C ALL | |||
| 49VU | NAV PROBES/ADIRU 1/AND AOA 1/26VAC | 5FP1 | F07 |
| 49VU | NAV PROBES/ADIRU1/115VAC | 4FP1 | F06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | NAV PROBES/ADIRU3/PWR/SWTG | 8FP | F08 |
| ** ON A/C ALL | |||
| 105VU | ADIRS/ADIRU1/28VDC | 6FP1 | C02 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ADIRS/ADIRU/2PWR/SHED | 10FP | N10 |
| ** ON A/C ALL | |||
| 121VU | ADIRS/ADIRU/3PWR/SWTG | 9FP | N09 |
| 121VU | ADIRS/ADIRU/2/26VAC AND AOA | 5FP2 | N08 |
| 121VU | ADIRS/ADIRU/3/26VAC AND AOA | 5FP3 | N07 |
| 121VU | ADIRS/ADIRU/2/115VAC | 4FP2 | N06 |
| 121VU | ADIRS/ADIRU/3/115VAC | 4FP3 | N05 |
| 121VU | ADIRS/ADIRU/2/28VDC | 6FP2 | N04 |
| 121VU | ADIRS/ADIRU/3/28VDC | 6FP3 | N03 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ADIRS/2PWR/SHED &/AOA2 MON | 10FP | N10 |
Subtask 34-14-00-740-069-A ** ON A/C NOT FOR ALL
A. SYSTEM TEST of the Inertial Reference (IR)
Subtask 34-14-00-740-069-B ** ON A/C NOT FOR ALL NOTE: - This test is for system 1. For systems 2 and 3, use the indications between the parentheses.
The actions and the results of this procedure occur on the Multipurpose Control and Display Unit (MCDU) that you operate.
- It is not necessary to do an Inertial References (IR) alignment procedure before you start the IR SYSTEM TEST. An automatic alignment of the IRs occurs during the IR SYSTEM TEST.
- If the IRs are aligned before you start the IR SYSTEM TEST, a new alignment is necessary after the IR SYSTEM TEST (only if the ADIRUs must be operative, if not set the ADIRUs to off).
The actions and the results of this procedure occur on the Multipurpose Control and Display Unit (MCDU) that you operate.
- It is not necessary to do an Inertial References (IR) alignment procedure before you start the IR SYSTEM TEST. An automatic alignment of the IRs occurs during the IR SYSTEM TEST.
- If the IRs are aligned before you start the IR SYSTEM TEST, a new alignment is necessary after the IR SYSTEM TEST (only if the ADIRUs must be operative, if not set the ADIRUs to off).
| ACTION | RESULT |
|---|---|
| 1.On the MCDU, on the SYSTEM REPORT/TEST : NAV menu page, push the line key adjacent to the IR 1(2, 3) indication. |
|
| 2.On the IR 1(2,3) page, push the line key adjacent to the SYSTEM TEST indication. |
|
| 3.On the IR 1(2,3) SYSTEM PAGE page, push the line key adjacent to the START TEST indication. |
|
| 4.Push the line key adjacent to the TEST CLOSE UP indication. |
|
| 5.Push the line key adjacent to the RETURN indication. |
|
A. SYSTEM TEST of the Inertial Reference (IR)
5. Close-upNOTE: - This test is for system 1. For systems 2 and 3, use the indications between the parentheses.
The actions and the results of this procedure occur on the Multipurpose Control and Display Unit (MCDU) that you operate.
- It is not necessary to do an Inertial References (IR) alignment procedure before you start the IR SYSTEM TEST. An automatic alignment of the IRs occurs during the IR SYSTEM TEST.
- If the IRs are aligned before you start the IR SYSTEM TEST, a new alignment is necessary after the IR SYSTEM TEST (only if the ADIRUs must be operative, if not set the ADIRUs to off).
The actions and the results of this procedure occur on the Multipurpose Control and Display Unit (MCDU) that you operate.
- It is not necessary to do an Inertial References (IR) alignment procedure before you start the IR SYSTEM TEST. An automatic alignment of the IRs occurs during the IR SYSTEM TEST.
- If the IRs are aligned before you start the IR SYSTEM TEST, a new alignment is necessary after the IR SYSTEM TEST (only if the ADIRUs must be operative, if not set the ADIRUs to off).
| ACTION | RESULT |
|---|---|
| 1.On the SYSTEM REPORT/TEST ATA 34 page, push the line key adjacent to the NAV indication. |
|
| 2.Push the line key adjacent to the IR 1(2,3) indication. |
|
| 3.On the IR 1(2,3) page, push the line key adjacent to the SYSTEM TEST indication. |
|
| 4.Push the line key adjacent to the START TEST indication. |
|
| 5.Push the line key adjacent to the TEST CLOSE UP indication. |
|
| 6.Push the line key adjacent to the RETURN indication. |
|
Subtask 34-14-00-860-062-A
A. Put the Aircraft back to its Initial Configuration
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) On the MCDU, push the line key adjacent to the RETURN indication until the MAINTENANCE MENU 1/2 page comes into view.
(3) On the MCDU, set the BRT knob to OFF.
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) On the MCDU, push the line key adjacent to the RETURN indication until the MAINTENANCE MENU 1/2 page comes into view.
(3) On the MCDU, set the BRT knob to OFF.
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).