Uploading of Software to the ADIRUs
TASK 34-12-34-610-801-A
Uploading of Software to the ADIRUs
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 34-12-34-860-062-A ** ON A/C NOT FOR ALL
Subtask 34-12-34-610-050-A ** ON A/C NOT FOR ALL
Subtask 34-12-34-860-064-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:23:06 UTC
Uploading of Software to the ADIRUs
ZONE: 120
FIN: 1FP1 ** ON A/C NOT FOR ALL
FIN: 1FP2 ** ON A/C NOT FOR ALL
FIN: 1FP3 ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 1FP1 ** ON A/C NOT FOR ALL
FIN: 1FP2 ** ON A/C NOT FOR ALL
FIN: 1FP3 ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ALT45200001 | 1 | PORTABLE DATA LOADER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 824 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-010-A | Procedure to Get Access to the SYSTEM REPORT/TEST NAV Page |
| TASK 34-10-00-860-002-A | ADIRS Start Procedure |
| TASK 34-10-00-860-005-A | ADIRS Stop Procedure |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 34-12-34-860-062-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the procedure to get access to the SYSTEM REPORT/TEST NAV page (Ref. AMM TASK 31-32-00-860-010).
Subtask 34-12-34-865-057-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the procedure to get access to the SYSTEM REPORT/TEST NAV page (Ref. AMM TASK 31-32-00-860-010).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 34-12-34-860-063-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/MCDU/1 | 11CA1 | B01 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/MCDU/1 | 11CA1 | H07 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | DLS&/DLRB/SPLY | 5TD | J15 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | PDL/PWR/SPLY | 14TD | K19 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/MCDU/2 | 11CA2 | N20 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | DATA/LOADER/SPLY | 3TD | J16 |
| 121VU | DLSU &/DLRB/SPLY | 5TD | J15 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | PDL/PWR/SPLY | 14TD | J45 |
| 121VU | DATA/LOADER/SPLY | 3TD | J39 |
| 121VU | DLSU &/DLRB/SPLY | 5TD | J38 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1FP1 (ADIRU1) | |||
| 105VU | ADIRS/ADIRU1/28VDC | 6FP1 | C02 |
| FOR FIN: 1FP2 (ADIRU2) | |||
| 121VU | ADIRS/ADIRU/2/115VAC | 4FP2 | N06 |
| 121VU | ADIRS/ADIRU/2/28VDC | 6FP2 | N04 |
| FOR FIN: 1FP3 (ADIRU3) | |||
| 121VU | ADIRS/ADIRU/3/115VAC | 4FP3 | N05 |
| 121VU | ADIRS/ADIRU/3/28VDC | 6FP3 | N03 |
C. Aircraft Maintenance Configuration
(1) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(2) Make sure that the aircraft is in the ground configuration:
Subtask 34-12-34-740-055-A ** ON A/C NOT FOR ALL (1) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(2) Make sure that the aircraft is in the ground configuration:
| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the lower ECAM DU:
|
D. Check of the P/N Update
Subtask 34-12-34-010-053-A ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
1.On the MCDU:
| On the MCDU:
|
2.On the ADR 1(ADR 2)(ADR 3) page:
| On the MCDU:
|
E. Get access to the avionics compartment.
(1) Put an ACCESS PLATFORM 2M (6 FT) in position at access door 824.
(2) Open access door 824 (Ref. AMM TASK 52-41-00-010-002).
Subtask 34-12-34-480-050-A ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 2M (6 FT) in position at access door 824.
(2) Open access door 824 (Ref. AMM TASK 52-41-00-010-002).
F. Installation of the ALT45200001 PORTABLE DATA LOADER.
(1) Make sure that the tool package contains a cable, a CD-ROM and an installation/user manual.
(2) Connect the cable to the ALT45200001 PORTABLE DATA LOADER and to connector 179VC on shield 86VU for ADIRU 1, 192VC on shield 87VU for ADIRU 2 or 191VC on shield 86VU for ADIRU 3 located at the bottom of electronics rack 80VU.
4. Procedure(1) Make sure that the tool package contains a cable, a CD-ROM and an installation/user manual.
(2) Connect the cable to the ALT45200001 PORTABLE DATA LOADER and to connector 179VC on shield 86VU for ADIRU 1, 192VC on shield 87VU for ADIRU 2 or 191VC on shield 86VU for ADIRU 3 located at the bottom of electronics rack 80VU.
Subtask 34-12-34-610-050-A ** ON A/C NOT FOR ALL
A. Uploading of Software to the ADIRU
(a) FOR [1FP1] (ADIRU-1)
1 Upload the software components that follow in this sequence:
a Operational software OPS
c Table 2 OPC2.
(b) FOR [1FP2] (ADIRU-2)
1 Upload the software components that follow in this sequence:
a Operational software OPS
c Table 2 OPC2.
(c) FOR [1FP3] (ADIRU-3)
1 Upload the software components that follow in this sequence:
a Operational software OPS
c Table 2 OPC2.
(d) FOR [1FP1] (ADIRU-1)
1 In the cockpit, on the CAPT PFD, make sure that you can see the speed and altitude scales and the horizon line.
(e) FOR [1FP2] (ADIRU-2)
1 In the cockpit, on the F/O PFD, make sure that you can see the speed and altitude scales and the horizon line.
(f) FOR [1FP3] (ADIRU-3)
1 In the cockpit, on the center pedestal, on SWITCHING panel 8VU, set the ATT HDG and AIR DATA selector switches to CAPT 3.
Subtask 34-12-34-280-052-A ** ON A/C NOT FOR ALL NOTE: If the Portable Data Loader (PDL) has the digital signature check-function, it can send two messages:
(1) Start the ALT45200001 PORTABLE DATA LOADER (refer to the PDL user guide). - One message if the PDL detects that the software has no signature (refer to the PDL user guide). You can ignore this message, it has no effect on the aircraft software uploading.
- One message if the PDL detects an incorrect or corrupted signature (refer to the PDL user guide). Then, the software uploading will not be possible and you must use a different software.
Because of possible effects, on data security, Airbus recommends that you send a report of the fault to your Aircraft Security Focal-Point.
(a) FOR [1FP1] (ADIRU-1)
1 Upload the software components that follow in this sequence:
a Operational software OPS
NOTE: Ignore all the warnings until the end of the uploading procedure.
b Table 1 OPC1 c Table 2 OPC2.
(b) FOR [1FP2] (ADIRU-2)
1 Upload the software components that follow in this sequence:
a Operational software OPS
NOTE: Ignore all the warnings until the end of the uploading procedure.
b Table 1 OPC1 c Table 2 OPC2.
(c) FOR [1FP3] (ADIRU-3)
1 Upload the software components that follow in this sequence:
a Operational software OPS
NOTE: Ignore all the warnings until the end of the uploading procedure.
b Table 1 OPC1 c Table 2 OPC2.
(d) FOR [1FP1] (ADIRU-1)
1 In the cockpit, on the CAPT PFD, make sure that you can see the speed and altitude scales and the horizon line.
(e) FOR [1FP2] (ADIRU-2)
1 In the cockpit, on the F/O PFD, make sure that you can see the speed and altitude scales and the horizon line.
(f) FOR [1FP3] (ADIRU-3)
1 In the cockpit, on the center pedestal, on SWITCHING panel 8VU, set the ATT HDG and AIR DATA selector switches to CAPT 3.
- On the CAPT PFD, make sure that you can see the speed and altitude scales.
B. Check the ADIRU Software P/N through LRU Identification after Uploading
5. Close-up| ACTION | RESULT |
|---|---|
1.On the MCDU:
| On the MCDU:
|
2.On the ADR 1(ADR 2)(ADR 3) page:
| On the MCDU:
|
Subtask 34-12-34-860-064-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) On the MCDU, push the MCDU MENU key to get the MCDU MENU page.
(3) On the MCDU, set the BRT knob to OFF.
(4) Put the disk(s) in the storage box.
Subtask 34-12-34-080-050-A ** ON A/C NOT FOR ALL (1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) On the MCDU, push the MCDU MENU key to get the MCDU MENU page.
(3) On the MCDU, set the BRT knob to OFF.
(4) Put the disk(s) in the storage box.
B. Removal of the ALT45200001 PORTABLE DATA LOADER.
(1) Stop the ALT45200001 PORTABLE DATA LOADER (Refer to the portable data-loader user-guide).
(2) Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER and from connector 179VC on shield 86VU for ADIRU 1, 192VC on shield 87VU for ADIRU 2 or 191VC on shield 86VU for ADIRU 3 located at the bottom of electronics rack 80VU.
(3) Put the cable, the CD-ROM and the installation/user manual in the tool package.
Subtask 34-12-34-410-052-A ** ON A/C NOT FOR ALL (1) Stop the ALT45200001 PORTABLE DATA LOADER (Refer to the portable data-loader user-guide).
(2) Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER and from connector 179VC on shield 86VU for ADIRU 1, 192VC on shield 87VU for ADIRU 2 or 191VC on shield 86VU for ADIRU 3 located at the bottom of electronics rack 80VU.
(3) Put the cable, the CD-ROM and the installation/user manual in the tool package.
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
Subtask 34-12-34-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
Installation of the High-Speed Portable Data Loader