W DOC AIRBUS | AMM A320F

Installation of the ADIRS CDU


TASK 34-12-12-400-001-A
Installation of the ADIRS CDU


ZONE: 210
FIN: 2FP ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
822
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 34-10-00-710-001-A
Check of the ADIRS CDU Brightness and Display
3. Job Set-up
Subtask 34-12-12-010-051-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position at the access door 822.
   (2) Make sure that the access door 822 is open.
   (3) Make sure that the protective cover is removed from the battery power center 105VU.
Subtask 34-12-12-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUNAV PROBES/ADIRU1/115VAC4FP1F06
105VUADIRS/ADIRU1/28VDC6FP1C02
121VUADIRS/ADIRU/2/115VAC4FP2N06
121VUADIRS/ADIRU/3/115VAC4FP3N05
121VUADIRS/ADIRU/2/28VDC6FP2N04
121VUADIRS/ADIRU/3/28VDC6FP3N03
122VULIGHTING/TST/BOARD/SPLY30LPX06
122VULIGHTING/ANN LT SPLY/XFMR/BUS 227LPX05
122VULIGHTING/ANN LT SPLY/XFMR/BUS 126LPX04
122VULIGHTING/INSTL LT/OVHD/PNL3LFY03
4. Procedure
Subtask 34-12-12-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the ADIRS CDU (2FP)
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the blanking caps from the electrical connectors (2) and (3).
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Connect the electrical connectors (2) to the related receptacles (3).
   (6) Install the CDU (4) in its housing (1).
   (7) Tighten the four quarter turn fasteners (5).
Subtask 34-12-12-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUNAV PROBES/ADIRU1/115VAC4FP1F06
105VUADIRS/ADIRU1/28VDC6FP1C02
121VUADIRS/ADIRU/2/115VAC4FP2N06
121VUADIRS/ADIRU/3/115VAC4FP3N05
121VUADIRS/ADIRU/2/28VDC6FP2N04
121VUADIRS/ADIRU/3/28VDC6FP3N03
122VULIGHTING/TST/BOARD/SPLY30LPX06
122VULIGHTING/ANN LT SPLY/XFMR/BUS 227LPX05
122VULIGHTING/ANN LT SPLY/XFMR/BUS 126LPX04
122VULIGHTING/INSTL LT/OVHD/PNL3LFY03
Subtask 34-12-12-710-050-A ** ON A/C NOT FOR ALL
C. Do the test of the ADIRS CDU brightness and display.
(Ref. AMM TASK 34-10-00-710-001)
5. Close-up
Subtask 34-12-12-860-050-A ** ON A/C NOT FOR ALL
A. Make sure that the work area is clean and clear of tools and other items.
Subtask 34-12-12-410-050-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Install the protective cover on the battery power center 105VU.
   (2) Tighten the two screws.
   (3) Close the access door 822
   (4) Remove the access platform(s).
[Rev.10 from 2021] 2026.04.02 06:23:05 UTC