Installation of the Static Probe


TASK 34-11-16-400-002-A
Installation of the Static Probe


WARNING: MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE OPENED, SAFETIED AND TAGGED.
WARNING: BEFORE YOU OPEN PHC CIRCUIT BREAKERS 2DA1(2,3), OPEN PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3). IF YOU DO NOT OBEY THIS SEQUENCE: - THE PROBES WILL BECOME TOO HOT. - THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
CAUTION: MAKE SURE THAT:
  • THERE IS NO SIGN OF CORROSION OR DAMAGE ON THE EQUIPMENT
  • THERE IS NO FOREIGN OBJECT IN THE EQUIPMENT
TO PREVENT ANY DAMAGE IN THE SYSTEM.
ZONE: 120
FIN: 7DA1
FIN: 7DA2
FIN: 7DA3
FIN: 8DA1
FIN: 8DA2
FIN: 8DA3
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 1M(3 FT)
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
Torque wrench: range to between 0.15 and 0.13 m.daN (13.27 and 11.50 lbf.in ) T
No specific
Torque wrench: range to between 1.87 and 1.76 m.daN (13.79 and 12.98 lbf.ft ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
120
AVIONICS COMPARTMENT
FOR [7DA1] (PROBE-L STATIC, 1)
FOR [7DA2] (PROBE-L STATIC, 2)
FOR [8DA1] (PROBE-R STATIC, 1)
FOR [8DA2] (PROBE-R STATIC, 2)
824
FOR [7DA3] (PROBE-L STATIC, 3)
FOR [8DA3] (PROBE-R STATIC, 3)
811
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
6
PACKING
AIPC 34-11-01-02-030
4
PACKING
AIPC 34-11-01-02-060
4
PACKING
AIPC 34-11-81-02-060
6
PACKING
AIPC 34-11-81-02-080
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 30-31-00-710-001-A
Operational Test of the Probe Ice Protection
TASK 34-11-16-710-001-A
Test of the Static Probe without the CFDS.
TASK 34-13-00-790-002-A
Leak Test of the Principal Static and Total Air Data System
TASK 34-21-00-790-001-A
Low-Range Leak Test of the Standby Pneumatic Circuits
TASK 34-22-25-790-001-A
Low range Leak Test of the Standby Pneumatic circuits
FOR [7DA1] (PROBE-L STATIC, 1)
FOR [7DA2] (PROBE-L STATIC, 2)
FOR [8DA1] (PROBE-R STATIC, 1)
FOR [8DA2] (PROBE-R STATIC, 2)
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
3. Job Set-up
Subtask 34-11-16-860-052-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position at the zone 128 for the static probes 7DA1, 8DA1, 7DA2 and 8DA2.
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the zone 120 for the static probes 7DA3 and 8DA3.
   (3) Open the access door:
     (a) FOR [7DA1] (PROBE-L STATIC, 1), [8DA1] (PROBE-R STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA2] (PROBE-R STATIC, 2)
824
     (b) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
811
   (4) Make sure that the protective covers of the sensors and probes (AOA, static Pitot and TAT) are removed.
Subtask 34-11-16-865-055-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUCOM NAV/RADAR/15SQ1K13
** ON A/C NOT FOR ALL
121VUCOM NAV/RADAR/25SQ2K14
** ON A/C ALL
FOR FIN: 8DA1 (PROBER STATIC, 1) FOR FIN: 7DA1 (PROBEL STATIC, 1)
49VUANTI ICE/PROBES/AOA/14DA1D04
49VUANTI ICE/PROBES/PITOT/13DA1D02
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
122VUANTI ICE/PROBES/1/TAT1DA1Z12
FOR FIN: 8DA2 (PROBER STATIC, 2) FOR FIN: 7DA2 (PROBEL STATIC, 2)
122VUANTI ICE/PROBES/2/TAT1DA2Y15
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
FOR FIN: 8DA3 (PROBER STATIC, 3) FOR FIN: 7DA3 (PROBEL STATIC, 3)
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
FOR FIN: 8DA1 (PROBER STATIC, 1) FOR FIN: 7DA1 (PROBEL STATIC, 1)
49VUANTI ICE/PROBES/PHC/12DA1D03
FOR FIN: 8DA2 (PROBER STATIC, 2) FOR FIN: 7DA2 (PROBEL STATIC, 2)
122VUANTI ICE/PROBES/PHC/22DA2Y12
FOR FIN: 8DA3 (PROBER STATIC, 3) FOR FIN: 7DA3 (PROBEL STATIC, 3)
122VUANTI ICE/PROBES/PHC/32DA3Y16
4. Procedure
Subtask 34-11-16-420-051-A ** ON A/C NOT FOR ALL
WARNING: IF YOU REPLACE STATIC PROBE 3 (7DA3 OR 8DA3), OR IF YOU REPLACE MORE THAN ONE STATIC PROBE, YOU MUST DO A LEAK TEST ON THE RELATED CIRCUITS.
A. Installation of the Static Probe
NOTE: This procedure is the same for the six static probes.
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Install a new AIPC 34-11-01-02-030 PACKING (6).
   (4) Carefully engage the static probe (5) on the bolts (7).
NOTE: The heating element wires must point as follows:
  • For static probes 7DA1, 8DA1, 7DA2, to the nose of the aircraft
  • For static probe 8DA2, to the tail of the A/C
  • For static probes 7DA3 and 8DA3, down.
   (5) Install the four nuts (3).
   (6) Tighten the nuts which are diagonally opposite (X sequence) and TORQUE them to between 0.15 and 0.13 m.daN (13.27 and 11.50 lbf.in )
T.
   (7) Install a new
AIPC 34-11-01-02-060 PACKING (4).
   (8) Install the union (2).
   (9) TORQUE the union (2) to between 1.87 and 1.76 m.daN (13.79 and 12.98 lbf.ft )
T.
   (10) Remove the blanking plug from the nut (1).
   (11) Install the static line (13).
   (12) Connect the nut (1).
   (13) Install the lugs (9) on the terminals (14) with the bolts (11), the washers (10) and the nuts (8).
NOTE: The covers (12) of the static probe (8DA2) must not touch the static line. Thus, make sure that the lugs (9) connected to the terminals (14) are correctly installed as shown in the figure given in this procedure.
   (14) Install the covers (12).
Subtask 34-11-16-420-051-B ** ON A/C NOT FOR ALL
WARNING: IF YOU REPLACE STATIC PROBE 3 (7DA3 OR 8DA3), OR IF YOU REPLACE MORE THAN ONE STATIC PROBE, YOU MUST DO A LEAK TEST ON THE RELATED CIRCUITS.
A. Installation of the Static Probe
NOTE: This procedure is the same for the six static probes.
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Install a new
AIPC 34-11-01-02-030 PACKING (6) or AIPC 34-11-81-02-080 PACKING (6).
   (4) Carefully engage the static probe (5) on the bolts (7).
NOTE: The heating element wires must point as follows:
  • For static probes 7DA1, 8DA1, 7DA2, to the nose of the aircraft
  • For static probe 8DA2, to the tail of the A/C
  • For static probes 7DA3 and 8DA3, down.
   (5) Install the bonding strip (15) (
Ref. AMM TASK 20-28-00-912-802).
   (6) Install the four nuts (3).
   (7) Tighten the nuts which are diagonally opposite (X sequence) and TORQUE them to between 0.15 and 0.13 m.daN (13.27 and 11.50 lbf.in ) T.
   (8) Install a new
AIPC 34-11-01-02-060 PACKING (4) or AIPC 34-11-81-02-060 PACKING (4).
   (9) Install the union (2).
   (10) TORQUE the union (2) to between 1.87 and 1.76 m.daN (13.79 and 12.98 lbf.ft )
T.
   (11) Remove the blanking plug from the nut (1).
   (12) Install the static line (13).
   (13) Connect the nut (1).
   (14) Install the lugs (9) on the terminals (14) with the bolts (11), the washers (10) and the nuts (8).
NOTE: The covers (12) of the static probe (8DA2) must not touch the static line. Thus, make sure that the lugs (9) connected to the terminals (14) are correctly installed as shown in the figure given in this procedure.
   (15) Install the covers (12).
Subtask 34-11-16-865-062-A
B. Table of the circuit breakers used in this procedure:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
Subtask 34-11-16-942-050-A
C. Safety Precautions
   (1) In the cockpit, on overhead control and indicating panel 25VU:
     (a) Make sure that the PROBE/WINDOW HEAT pushbutton switch is released (the ON legend is off).
     (b) Make sure that this(these) circuit breaker(s) is(are) closed:
  • 2KS1
  • 2KS2.
Subtask 34-11-16-865-056-A
D. Remove the safety clips and tags and close these circuit breakers in this sequence:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUCOM NAV/RADAR/15SQ1K13
** ON A/C NOT FOR ALL
121VUCOM NAV/RADAR/25SQ2K14
** ON A/C ALL
FOR FIN: 8DA1 (PROBER STATIC, 1) FOR FIN: 7DA1 (PROBEL STATIC, 1)
49VUANTI ICE/PROBES/PHC/12DA1D03
FOR FIN: 8DA2 (PROBER STATIC, 2) FOR FIN: 7DA2 (PROBEL STATIC, 2)
122VUANTI ICE/PROBES/PHC/22DA2Y12
FOR FIN: 8DA3 (PROBER STATIC, 3) FOR FIN: 7DA3 (PROBEL STATIC, 3)
122VUANTI ICE/PROBES/PHC/32DA3Y16
FOR FIN: 8DA1 (PROBER STATIC, 1) FOR FIN: 7DA1 (PROBEL STATIC, 1)
122VUANTI ICE/PROBES/1/TAT1DA1Z12
49VUANTI ICE/PROBES/PITOT/13DA1D02
49VUANTI ICE/PROBES/AOA/14DA1D04
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
FOR FIN: 8DA2 (PROBER STATIC, 2) FOR FIN: 7DA2 (PROBEL STATIC, 2)
122VUANTI ICE/PROBES/2/TAT1DA2Y15
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
FOR FIN: 8DA3 (PROBER STATIC, 3) FOR FIN: 7DA3 (PROBEL STATIC, 3)
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
Subtask 34-11-16-790-051-A ** ON A/C NOT FOR ALL
E. Leak Test
NOTE: The leak test is mandatory if you installed one static probe 3 (7DA3 or 8DA3) or more than two static probes.
   (1) Do a leak test of the main static system (
Ref. AMM TASK 34-13-00-790-002) if you installed:
  • more than two static probes, and
  • a minimum of one of them is a main static probe (7DA1, 7DA2, 8DA1 or 8DA2).
   (2) Do a leak test of the standby static system (Ref. AMM TASK 34-21-00-790-001) if you installed one or more standby static probes (7DA3 or 8DA3).

Subtask 34-11-16-790-051-B ** ON A/C NOT FOR ALL
E. Leak Test
NOTE: The leak test is mandatory if you installed one static probe 3 (7DA3 or 8DA3) or more than two static probes.
   (1) Do a leak test of the main static system (Ref. AMM TASK 34-13-00-790-002) if you installed:
  • more than two static probes, and
  • a minimum of one of them is a main static probe (7DA1, 7DA2, 8DA1 or 8DA2).
   (2) Do a leak test of the standby air data system (Ref. AMM TASK 34-22-25-790-001) if you installed one or more standby static probes (7DA3 or 8DA3).

Subtask 34-11-16-710-052-A
F. Do an operational test of the Static Probe with the CFDS:
Do the operational test of the Probe Ice Protection
(Ref. AMM TASK 30-31-00-710-001).
NOTE: As an alternative procedure, you can do this operational test without the CFDS
(Ref. AMM TASK 34-11-16-710-001).
5. Close-up
Subtask 34-11-16-410-051-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door :
     (a) FOR [7DA1] (PROBE-L STATIC, 1), [8DA1] (PROBE-R STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA2] (PROBE-R STATIC, 2)
824 (Ref. AMM TASK 52-41-00-410-002).
     (b) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
811
   (3) Install the protective covers on the sensors and probes (AOA, static, Pitot and TAT).
   (4) Remove the access platform(s).