Test of the Pitot Probe without the CFDS
TASK 34-11-15-710-001-A
Test of the Pitot Probe without the CFDS
Do this test after the removal/installation of the Pitot Probe (9DA1,9DA2,9DA3) when the CFDS is unserviceable.
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 34-11-15-860-051-A
Subtask 34-11-15-710-051-A
Subtask 34-11-15-860-052-A
[Rev.10 from 2021]
2026.04.01 00:58:21 UTC
Test of the Pitot Probe without the CFDS
WARNING:
DO NOT TOUCH THE PROBES IMMEDIATELY AFTER THE TEST.
THEY ARE HOT AND CAN BURN YOU.
CAUTION:
REMOVE THE PROTECTIVE COVERS FROM THE PROBES BEFORE YOU DO THE TEST.
CAUTION:
DO NOT CONTINUE THE TEST FOR MORE THAN ONE MINUTE TO PREVENT DAMAGE TO THE PROBES.
1. Reason for the JobDo this test after the removal/installation of the Pitot Probe (9DA1,9DA2,9DA3) when the CFDS is unserviceable.
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 34-10-00-860-002-A | ADIRS Start Procedure |
| TASK 34-10-00-860-005-A | ADIRS Stop Procedure |
Subtask 34-11-15-860-051-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure ECAM only (Ref. AMM TASK 31-60-00-860-001).
(3) Do the ADIRS start procedure for the related system:
For 9DA1
ADIRU1
For 9DA2
ADIRU2
For 9DA3
ADIRU3
(Ref. AMM TASK 34-10-00-860-002).
Subtask 34-11-15-865-056-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure ECAM only (Ref. AMM TASK 31-60-00-860-001).
(3) Do the ADIRS start procedure for the related system:
For 9DA1
ADIRU1
For 9DA2
ADIRU2
For 9DA3
ADIRU3
(Ref. AMM TASK 34-10-00-860-002).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 9DA1 (PROBEPITOT, 1) | |||
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| FOR FIN: 9DA2 (PROBEPITOT, 2) | |||
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| FOR FIN: 9DA3 (PROBEPITOT, 3) | |||
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
Subtask 34-11-15-710-051-A
A. Heating Test
5. Close-up| ACTION | RESULT |
|---|---|
| 1.On the overhead panel on the PROBE/WINDOW HEAT section of the panel 25VU: | |
| the ON legend comes on. |
| 2.On the circuit breaker panel : | |
|
|
|
|
|
|
| 3.Close the circuit breaker(s) that you opened before. |
|
| 4.On the overhead panel, on the PROBE/WINDOW HEAT section of the panel 25VU: | |
| The ON legend goes off. |
Subtask 34-11-15-860-052-A
A. Put the aircraft back to its initial configuration.
(1) On the center pedestal, on the ECAM control panel, set the UPPER DISPLAY and LOWER DISPLAY potentiometers to OFF.
(2) Do the ADIRS Stop Procedure (Ref. AMM TASK 34-10-00-860-005).
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) On the center pedestal, on the ECAM control panel, set the UPPER DISPLAY and LOWER DISPLAY potentiometers to OFF.
(2) Do the ADIRS Stop Procedure (Ref. AMM TASK 34-10-00-860-005).
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).