Functional Test of the Air Data Module (ADM)
TASK 34-11-00-720-001-A
Functional Test of the Air Data Module (ADM)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 34-11-00-010-050-A
Subtask 34-11-00-720-050-A
Subtask 34-11-00-080-050-A
[Rev.10 from 2021]
2026.04.02 06:23:01 UTC
Functional Test of the Air Data Module (ADM)
CAUTION:
TO PREVENT DAMAGE TO INSTRUMENTS, OBEY THESE PRECAUTIONS WHEN YOU DO THE TEST:
- THE PRESSURES SET MUST NOT BE MORE THAN 1050 hPa (31 in Hg) OR LESS THAN 115 hPa (3.39 in Hg)
- CHANGES IN STATIC AND TOTAL PRESSURES MUST NOT BE MORE THAN 6000 FEET/MINUTE
- DO NOT SUDDENLY OPEN LINES TO AMBIENT AIR WHILE THE PRESSURE GENERATOR IS CONNECTED.
CAUTION:
THE TOTAL PRESSURE IN THE PITOT SYSTEM MUST NEVER BE LESS THAN THE STATIC PRESSURE. THE DIFFERENCE BETWEEN THE PITOT AND THE STATIC PRESSURE CIRCUITS MUST NEVER BE MORE THAN 368 hPa (10.86 in Hg).
ZONE: 120
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | ARINC READER |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | TAPE - ADHESIVE |
| 98D10103500001 | 1 | COVER-STATIC PROBE |
| ALT34100001 | 1 | PITOT AND STATIC TEST SET |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 824 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 34-10-00-860-002-A | ADIRS Start Procedure |
| TASK 34-10-00-860-005-A | ADIRS Stop Procedure |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 34-11-00-010-050-A
A. Get Access to the Avionics Compartment
(1) Put the ACCESS PLATFORM 1M(3 FT) in position and open the access door 824.
Subtask 34-11-00-860-056-A (1) Put the ACCESS PLATFORM 1M(3 FT) in position and open the access door 824.
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (PFDs only) (Ref. AMM TASK 31-60-00-860-001).
(3) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(4) On the center pedestral, on the SWITCHING panel 8VU, make sure that the AIR DATA selector switch is at NORM.
Subtask 34-11-00-865-050-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (PFDs only) (Ref. AMM TASK 31-60-00-860-001).
(3) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(4) On the center pedestral, on the SWITCHING panel 8VU, make sure that the AIR DATA selector switch is at NORM.
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 34-11-00-480-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
D. Install the ground pressure generator and the Aeronautical Radio Incorporated (ARINC) reader.
(1) Remove the slip-on covers from the static probes and the pitot probes.
(2) Connect the static port of the ALT34100001 PITOT AND STATIC TEST SET to the static probes and/or the total probes on which you do the test.
(a) The static probes with the ADAPTER STATIC PROBE:
1 For the CAPT circuit (Air Data/Inertial Reference Unit 1 (ADIRU 1)) and the F/O circuit (ADIRU 2):
1 For the standby circuit (ADIRU 3):
1 For the CAPT circuit (ADIRU 1):
a 9DA1 zone 125 STA 5500 for the total pressure ADM (19FP1).
2 For the F/O circuit (ADIRU 2):
a 9DA2 zone 126 STA 5500 for the total pressure ADM (19FP2).
3 For the standby circuit (ADIRU 3):
a 9DA3 zone 125 STA 5500 for the total pressure ADM (19FP3).
(3) Seal the standby probes:
(b) Seal the opposite static probe of the standby ADM with the 98D10103500001 COVER-STATIC PROBE.
(4) Start the ground pressure generator.
(5) On relay plate 187VU, connect the ARINC READER to:
4. Procedure(1) Remove the slip-on covers from the static probes and the pitot probes.
(2) Connect the static port of the ALT34100001 PITOT AND STATIC TEST SET to the static probes and/or the total probes on which you do the test.
(a) The static probes with the ADAPTER STATIC PROBE:
1 For the CAPT circuit (Air Data/Inertial Reference Unit 1 (ADIRU 1)) and the F/O circuit (ADIRU 2):
- 7DA1 zone 127 Station (STA) 8750 for the left static-pressure ADM (19FP5)
- 7DA2 zone 127 STA 8700 for the left static-pressure ADM (19FP7).
- 8DA1 zone 128 STA 9300 for the right static-pressure ADM (19FP4)
- 8DA2 zone 128 STA 9350 for the right static-pressure ADM (19FP6).
1 For the standby circuit (ADIRU 3):
- 7DA3 zone 121 STA 4250 for the static pressure ADM (19FP8), or
- 8DA3 zone 122 STA 4250 for the static pressure ADM (19FP8).
1 For the CAPT circuit (ADIRU 1):
a 9DA1 zone 125 STA 5500 for the total pressure ADM (19FP1).
2 For the F/O circuit (ADIRU 2):
a 9DA2 zone 126 STA 5500 for the total pressure ADM (19FP2).
3 For the standby circuit (ADIRU 3):
a 9DA3 zone 125 STA 5500 for the total pressure ADM (19FP3).
(3) Seal the standby probes:
CAUTION:
WHEN YOU SEAL THE DRAIN HOLE IN THE PITOT PROBE, DO NOT SEAL THE HOLE DIRECTLY WITH THE COLORED ADHESIVE TAPE. ALWAYS PUT A PIECE OF PLASTIC ON THE HOLE FIRST AND USE THE COLORED ADHESIVE TAPE TO ATTACH THE PLASTIC.
IF YOU SEAL THE DRAIN HOLE DIRECTLY WITH THE ADHESIVE TAPE, THERE IS A RISK THAT SOME OF THE ADHESIVE WILL STAY ON THE HOLE AND COLLECT PARTICLES. THIS CAN SUBSEQUENTLY CAUSE BLOCKAGE OF THE HOLE AND THUS INCORRECT OPERATION OF THE PROBE.
(a) Seal the drain holes of the pitot probes with a piece of plastic and the TAPE - ADHESIVE of very bright color. (b) Seal the opposite static probe of the standby ADM with the 98D10103500001 COVER-STATIC PROBE.
(4) Start the ground pressure generator.
(5) On relay plate 187VU, connect the ARINC READER to:
- Connector 199VC (pins GG/HH) for the CAPT circuit (ADIRU 1)
- Connector 199VC (pins <Y/<Z) for the standby circuit (ADIRU 3).
- Connector 198VC (pins GG/HH) for the F/O circuit (ADIRU 2).
Subtask 34-11-00-720-050-A
A. Functional Test of the ADM
5. Close-up| ACTION | RESULT |
|---|---|
| 1.On the ground pressure generator, set a static pressure as given in the table below. The impacted pressure must stay at 0 (hPa or Kts). NOTE: You can also set an other pressure value. The tolerance for the values read on the ARINC reader is the same as these indicated in the table below. | On the ARINC reader, compare the pressure values of the static and total ADM read on the following labels : ADIRU 1
|
| 2.On the ground pressure generator, slowly decrease the pressure. | The rate of descent must not be more than 6000 ft/mn. |
| 3.Stop the ground pressure generator. | The test procedure stops. |
| Pressure Setting | Altitude (approx.) | Pressure value from the ADM |
|---|---|---|
| 836 hPa | 5000 ft | 836 +/- 0.3 hPa |
| 690 hPa | 10000 ft | 690 +/- 0.3 hPa |
| 460 hPa | 20000 ft | 460 +/- 0.3 hPa |
| 300 hPa | 30000 ft | 300 +/- 0.3 hPa |
| 196 hPa | 39000 ft | 196 +/- 0.3 hPa |
Subtask 34-11-00-080-050-A
A. Remove the Ground Pressure Generator
(1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Make sure that there is no remaining piece of plastic and/or adhesive tape on the pitot probes. Make sure that the pitot drain holes are serviceable.
Subtask 34-11-00-865-052-A (1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Make sure that there is no remaining piece of plastic and/or adhesive tape on the pitot probes. Make sure that the pitot drain holes are serviceable.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 34-11-00-410-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
C. Close Access
(1) Close the access door 824 (Ref. AMM TASK 52-41-00-410-002).
(2) Remove the access platform(s).
Subtask 34-11-00-860-051-A (1) Close the access door 824 (Ref. AMM TASK 52-41-00-410-002).
(2) Remove the access platform(s).
D. Put the aircraft back to its initial configuration.
(1) Install the slip on covers on the static probes and on the pitot probes.
(2) Do the ADIRS Stop Procedure (Ref. AMM TASK 34-10-00-860-005).
(3) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Install the slip on covers on the static probes and on the pitot probes.
(2) Do the ADIRS Stop Procedure (Ref. AMM TASK 34-10-00-860-005).
(3) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Static and Pitot Test Set