Test of the Monitoring of the ADIRS Power Supply (115VAC-28VDC)
TASK 34-11-00-710-002-A
Test of the Monitoring of the ADIRS Power Supply (115VAC-28VDC)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 34-11-00-010-052-A
Subtask 34-11-00-710-051-A ** ON A/C NOT FOR ALL
Subtask 34-11-00-860-055-A
[Rev.10 from 2021]
2026.04.02 06:23:02 UTC
Test of the Monitoring of the ADIRS Power Supply (115VAC-28VDC)
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 34-11-00-010-052-A
A. Get Access
(1) Put the ACCESS PLATFORM 1M(3 FT) in position in zone 126 at the access door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
Subtask 34-11-00-860-054-A ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 1M(3 FT) in position in zone 126 at the access door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) On the overhead panel:
Subtask 34-11-00-860-054-B ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) On the overhead panel:
- On the FLT CTL panels 23VU and 24VU, make sure that the FAC, ELAC and SEC pushbutton switches are not pushed (in). The OFF legends are on.
- On the ADIRS CDU, on the panel 20VU, make sure that the 3 OFF/NAV/ATT selector switches are at OFF.
- On the ELEC panel 35VU, make sure that the battery voltage is correct, between 26VDC and 30VDC.
NOTE: This test is for the system 1. For the systems 2 and 3, use the indications between the parentheses.
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) On the overhead panel:
Subtask 34-11-00-865-054-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) On the overhead panel:
- On FLT CTL panels 23VU and 24VU, make sure that the FAC, ELAC and SEC pushbutton switches are released (the OFF legends are on).
- On ADIRS MSU panel 41VU, make sure that the three OFF/NAV/ATT selector switches are set to OFF.
- On ELEC panel 35VU, make sure that the battery voltage is correct, between 26VDC and 30VDC.
NOTE: This test is for the system 1. For the systems 2 and 3, use the indications between the parentheses.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 49VU | NAV PROBES/ADIRU 1/AND AOA 1/26VAC | 5FP1 | F07 |
| 49VU | NAV PROBES/ADIRU1/115VAC | 4FP1 | F06 |
| 105VU | ADIRS/ADIRU1/28VDC | 6FP1 | C02 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ADIRS/ADIRU/2PWR/SHED | 10FP | N10 |
| ** ON A/C ALL | |||
| 121VU | ADIRS/ADIRU/3PWR/SWTG | 9FP | N09 |
| 121VU | ADIRS/ADIRU/2/26VAC AND AOA | 5FP2 | N08 |
| 121VU | ADIRS/ADIRU/3/26VAC AND AOA | 5FP3 | N07 |
| 121VU | ADIRS/ADIRU/2/115VAC | 4FP2 | N06 |
| 121VU | ADIRS/ADIRU/3/115VAC | 4FP3 | N05 |
| 121VU | ADIRS/ADIRU/2/28VDC | 6FP2 | N04 |
| 121VU | ADIRS/ADIRU/3/28VDC | 6FP3 | N03 |
| 121VU | EIS/HORN/SPLY | 2WC | P09 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ADIRS/2PWR/SHED &/AOA2 MON | 10FP | N10 |
Subtask 34-11-00-710-051-A ** ON A/C NOT FOR ALL
A. Test of the Monitoring of the ADIRS Power Supply (115VAC-28VDC)
Subtask 34-11-00-710-051-C ** ON A/C NOT FOR ALL NOTE: Ignore all warnings / indications which are not related to this test.
| ACTION | RESULT |
|---|---|
1.On the panel 49VU (121VU):
| |
|
|
| 4.On the panel 49VU (121VU), close the circuit breaker 4FP1 (4FP2). |
|
5.On the ADIRS CDU:
|
|
| 6.Do the IR 2 test as specified in para. 1 to 5. | You must get the same results on the F/O side. |
7.On the ADIRS CDU:
| On the ADIRS CDU:
|
| 8.On the panel 49VU (121VU): | |
|
|
| 9.On the panel 49VU (121VU): | |
|
|
| 10.On the ADIRS CDU: set the OFF/NAV/ATT selector switch related to the IR1 (IR2) to OFF. | On the ADIRS CDU: the ALIGN legend goes off. |
| 11.Do the IR 2 test as specified in para. 7 to 10. | You must get the same results on the F/O side. |
12.On the panel 121VU:
| |
|
|
14.On the ADIRS CDU:
| |
|
|
| 15.On the panel 121VU: | |
|
|
| 16.On the ADIRS CDU: | |
|
|
| 17.On the ADIRS CDU: | |
|
|
| 18.On the panel 121VU: | |
|
|
19.On the panel 121VU:
|
|
| 20.On the ADIRS CDU: | |
|
|
21.On the panel 8VU:
| |
A. Test of the Monitoring of the ADIRS Power Supply (115VAC-28VDC)
Subtask 34-11-00-710-051-D ** ON A/C NOT FOR ALL NOTE: Ignore all warnings / indications which are not related to this test.
| ACTION | RESULT |
|---|---|
1.On overhead C/B panel 49VU (121VU):
| |
3.On ADIRS MSU panel 41VU:
|
|
| 4.On overhead C/B panel 49VU (121VU), close the circuit breaker 4FP1 (4FP2). |
|
5.On ADIRS MSU panel 41VU:
|
|
| 6.Do IR2 test as specified in para. 1 to 5. | You must get the same results on the F/O side. |
7.On ADIRS MSU panel 41VU:
| On ADIRS MSU panel 41VU:
|
| 8.On overhead C/B panel 49VU (121VU): | |
|
|
| 9.On overhead C/B panel 49VU (121VU): | |
|
|
| 10.On ADIRS MSU panel 41VU: Set the OFF/NAV/ATT selector switch related to IR1 (IR2) to OFF. | |
| 11.Do IR2 test as specified in para. 7 to 10. | You must get the same results on the F/O side. |
12.On rear C/B panel 121VU:
| |
|
|
14.On ADIRS MSU panel 41VU:
|
|
| 15.On rear C/B panel 121VU: | |
|
|
| 16.On ADIRS MSU panel 41VU: | |
|
|
| 17.On ADIRS MSU panel 41VU: | |
|
|
| 18.On rear C/B panel 121VU: | |
|
|
19.On rear C/B panel 121VU:
|
|
| 20.On ADIRS MSU panel 41VU: | |
| |
21.On SWITCHING panel 8VU:
| |
A. Test of the Monitoring of the ADIRS Power Supply (115VAC-28VDC)
Subtask 34-11-00-710-051-E ** ON A/C NOT FOR ALL NOTE: Ignore all warnings / indications which are not related to this test.
| ACTION | RESULT |
|---|---|
1.On overhead C/B panel 49VU (121VU):
| |
3.On ADIRS MSU panel 41VU:
|
|
| 4.On overhead C/B panel 49VU (121VU): | |
|
|
| 5.On ADIRS MSU panel 41VU: | |
| |
| 6.On the F/O and CAPT glareshield panels 130VU and 131VU: | |
|
|
| 7.Do IR2 test as specified in para. 1 to 6. | You must get the same results on the F/O side. |
| 8.On ADIRS MSU panel 41VU: | |
|
|
| 9.On overhead C/B panel 49VU (121VU): | |
|
|
| 10.On overhead C/B panel 49VU (121VU): | |
|
|
| 11.On ADIRS MSU panel 41VU: | |
|
|
| 12.Do IR2 test as specified in para. 8 to 11. | You must get the same results on the F/O side. |
13.On rear C/B panel 121VU:
| |
|
|
15.On ADIRS MSU panel 41VU:
|
|
| 16.On rear C/B panel 121VU: | |
|
|
| 17.On ADIRS MSU panel 41VU: | |
| |
| 18.On the F/O and CAPT glareshield panels 130VU and 131VU: | |
|
|
| 19.On ADIRS MSU panel 41VU: | |
|
|
| 20.On rear C/B panel 121VU: | |
|
|
| 21.On rear C/B panel 121VU: | |
|
|
| 22.On ADIRS MSU panel 41VU: | |
| |
23.On SWITCHING panel 8VU:
| |
A. Test of the Monitoring of the ADIRS Power Supply (115VAC-28VDC)
5. Close-upNOTE: Ignore all warnings / indications which are not related to this test.
| ACTION | RESULT |
|---|---|
1.On the overhead C/B panel 49VU (121VU):
| |
3.On ADIRS MSU panel 41VU:
|
|
| 4.On overhead C/B panel 49VU (121VU), close circuit breaker 4FP1 (4FP2). |
|
5.On ADIRS MSU panel 41VU:
|
|
| 6.Do IR2 test as specified in para. 1 to 5. | You must get the same results on the F/O side. |
7.On ADIRS MSU panel 41VU:
| On ADIRS MSU panel 41VU:
|
| 8.On overhead C/B panel 49VU (121VU): | |
|
|
| 9.On overhead C/B panel 49VU (121VU): | |
|
|
| 10.On ADIRS MSU panel 41VU: Set the OFF/NAV/ATT selector switch related to IR1 (IR2) to OFF. | |
| 11.Do IR2 test as specified in para. 7 to 10. | You must get the same results on the F/O side. |
12.On rear C/B panel 121VU:
| |
|
|
14.On ADIRS MSU panel 41VU:
|
|
| 15.On rear C/B panel 121VU: | |
|
|
| 16.On ADIRS MSU panel 41VU: | |
|
|
| 17.On ADIRS MSU panel 41VU: | |
|
|
| 18.On rear C/B panel 121VU: | |
|
|
19.On rear C/B panel 121VU:
|
|
| 20.On ADIRS MSU panel 41VU: | |
| |
21.On SWITCHING panel 8VU:
| |
Subtask 34-11-00-860-055-A
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) On the overhead panel:
(Ref. AMM TASK 24-41-00-862-002).
Subtask 34-11-00-410-052-A (1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) On the overhead panel:
- On the FLT CTL panels 23VU and 24VU, make sure that the FAC, ELAC and SEC pushbutton switches are pushed. The off legends are off.
(Ref. AMM TASK 24-41-00-862-002).
B. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).