Operational Check of the Five-Minute Time Delay of ADIRU2 and ADIRU3 Power Disconnection in Emergency Configuration
TASK 34-10-00-710-009-A
Operational Check of the Five-Minute Time Delay of ADIRU2 and ADIRU3 Power Disconnection in Emergency Configuration
Refer to the MPD TASK: 341300-05
OPERATIONAL CHECK OF THE 5-MINUTE TIME DELAY OF ADIRU 2 AND 3 POWER DISCONNECTION IN EMERGENCY CONFIGURATION
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 34-10-00-860-067-A ** ON A/C NOT FOR ALL
Subtask 34-10-00-710-064-A ** ON A/C NOT FOR ALL
Subtask 34-10-00-860-068-A
[Rev.10 from 2021]
2026.04.02 06:23:00 UTC
Operational Check of the Five-Minute Time Delay of ADIRU2 and ADIRU3 Power Disconnection in Emergency Configuration
ZONE: 210
1. Reason for the JobRefer to the MPD TASK: 341300-05
OPERATIONAL CHECK OF THE 5-MINUTE TIME DELAY OF ADIRU 2 AND 3 POWER DISCONNECTION IN EMERGENCY CONFIGURATION
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 34-10-00-860-067-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) On the overhead panel:
Subtask 34-10-00-860-067-B ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) On the overhead panel:
- On FLT CTL panels 23VU and 24VU, make sure that the FAC, ELAC and SEC pushbutton switches are released (the OFF legends are on).
- On the ADIRS CDU, make sure that the three OFF/NAV/ATT selector switches are set to OFF.
- On ELEC panel 35VU, make sure that the battery voltage is between 26VDC and 30VDC.
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) On the overhead panel:
Subtask 34-10-00-010-057-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) On the overhead panel:
- On FLT CTL panels 23VU and 24VU, make sure that the FAC, ELAC and SEC pushbutton switches are released (the OFF legends are on).
- On ADIRS MSU panel 41VU, make sure that the three OFF/NAV/ATT selector switches are set to OFF.
- On ELEC panel 35VU, make sure that the battery voltage is between 26VDC and 30VDC.
B. Get Access
(1) Put the ACCESS PLATFORM 1M(3 FT) in position below access door 822.
(2) Open access door 822.
(3) On battery power center 105VU:
Subtask 34-10-00-865-068-A (1) Put the ACCESS PLATFORM 1M(3 FT) in position below access door 822.
(2) Open access door 822.
(3) On battery power center 105VU:
- Loosen the two screws and remove the protective cover.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 49VU | NAV PROBES/ADIRU 1/AND AOA 1/26VAC | 5FP1 | F07 |
| 49VU | NAV PROBES/ADIRU1/115VAC | 4FP1 | F06 |
| 105VU | ADIRS/ADIRU1/28VDC | 6FP1 | C02 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ADIRS/ADIRU/2PWR/SHED | 10FP | N10 |
| ** ON A/C ALL | |||
| 121VU | ADIRS/ADIRU/3PWR/SWTG | 9FP | N09 |
| 121VU | ADIRS/ADIRU/2/26VAC AND AOA | 5FP2 | N08 |
| 121VU | ADIRS/ADIRU/3/26VAC AND AOA | 5FP3 | N07 |
| 121VU | ADIRS/ADIRU/2/115VAC | 4FP2 | N06 |
| 121VU | ADIRS/ADIRU/3/115VAC | 4FP3 | N05 |
| 121VU | ADIRS/ADIRU/2/28VDC | 6FP2 | N04 |
| 121VU | ADIRS/ADIRU/3/28VDC | 6FP3 | N03 |
| 121VU | EIS/HORN/SPLY | 2WC | P09 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ADIRS/2PWR/SHED &/AOA2 MON | 10FP | N10 |
Subtask 34-10-00-710-064-A ** ON A/C NOT FOR ALL
A. Operational Test of the Five-Minute Time Delay of ADIRU2 Power Disconnection in Emergency Configuration
Subtask 34-10-00-710-068-A ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On the ADIRS CDU: | On the ADIRS CDU: |
|
|
|
|
| 2.On rear C/B panel 121VU: | On the ADIRS CDU: |
|
|
3.On the ADIRS CDU:
| |
| 4.On rear C/B panel 121VU: | |
| |
| 5.On the ADIRS CDU: | On the ADIRS CDU: |
|
NOTE: If the time to set the OFF/NAV/ATT selector switch from OFF to NAV is less than 20 seconds, the ON BAT light does not come on. NOTE: The OFF and FAULT legends of the ADR2 pushbutton switch can flash. |
| 6.Set the OFF/NAV/ATT selector switch related to IR2 to OFF. | |
B. Operational Test of the Five-Minute Time Delay of ADIRU3 Power Disconnection in Emergency Configuration
Subtask 34-10-00-710-064-C ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On the ADIRS CDU: | On the ADIRS CDU: |
|
|
| 2.On the center pedestal, on SWITCHING panel 8VU: | |
| |
| 3.On the ADIRS CDU, push the ADR3 pushbutton switch. |
|
| 4.On rear circuit-breaker panel 121VU: | On the ADIRS CDU: |
|
|
5.On the ADIRS CDU:
| |
| 6.On rear circuit-breaker panel 121VU: | |
| |
| 7.On the ADIRS CDU: | On the ADIRS CDU: |
|
NOTE: If the time to set the OFF/NAV/ATT selector switch from OFF to NAV is less than 20 seconds, the ON BAT light does not come on. NOTE: The OFF and FAULT legends of the ADR3 pushbutton switch can flash. |
8.On the ADIRS CDU:
| |
| 9.Set the ATT HDG selector switch to NORM. | |
C. Operational Test of the Five-Minute Time Delay of ADIRU2 Power Disconnection in Emergency Configuration
Subtask 34-10-00-710-068-C ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On ADIRS MSU panel 41VU: | On ADIRS MSU panel 41VU: |
|
|
|
|
| 2.On rear C/B panel 121VU: | On ADIRS MSU panel 41VU: |
|
|
3.On ADIRS MSU panel 41VU:
| |
| 4.On rear C/B panel 121VU: | |
| |
| 5.On ADIRS MSU panel 41VU: | On ADIRS MSU panel 41VU: |
|
NOTE: If the time to set the OFF/NAV/ATT selector switch from OFF to NAV is less than 20 seconds, the ON BAT light does not come on. NOTE: The OFF and FAULT legends of the ADR2 pushbutton switch can flash. |
| 6.Set the OFF/NAV/ATT selector switch related to IR2 to OFF. | |
D. Operational Test of the Five-Minute Time Delay of ADIRU3 Power Disconnection in Emergency Configuration
Subtask 34-10-00-710-064-D ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On ADIRS MSU panel 41VU: | On ADIRS MSU panel 41VU: |
|
|
| 2.On the center pedestal, on SWITCHING panel 8VU: | |
| |
| 3.On ADIRS MSU panel 41VU, push the ADR3 pushbutton switch. |
|
| 4.On rear circuit-breaker panel 121VU: | On ADIRS MSU panel 41VU: |
|
|
5.On ADIRS MSU panel 41VU:
| |
| 6.On rear circuit-breaker panel 121VU: | |
| |
| 7.On ADIRS MSU panel 41VU: | On ADIRS MSU panel 41VU: |
|
NOTE: If the time to set the OFF/NAV/ATT selector switch from OFF to NAV is less than 20 seconds, the ON BAT light does not come on. NOTE: The OFF and FAULT legends of the ADR3 pushbutton switch can flash. |
8.On ADIRS MSU panel 41VU:
| |
| 9.Set the ATT HDG selector switch to NORM. | |
E. Operational Test of the Five-Minute Time Delay of ADIRU2 Power Disconnection in Emergency Configuration
Subtask 34-10-00-710-068-D ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On ADIRS MSU panel 41VU: | On ADIRS MSU panel 41VU: |
|
|
|
|
| 2.On rear C/B panel 121VU: | On ADIRS MSU panel 41VU: |
|
|
3.On ADIRS MSU panel 41VU:
| |
| 4.On rear C/B panel 121VU: | |
| |
| 5.On ADIRS MSU panel 41VU: | On ADIRS MSU panel 41VU: |
|
NOTE: If the time to set the OFF/NAV/ATT selector switch from OFF to NAV is less than 20 seconds, the ON BAT light does not come on. |
| 6.Set the OFF/NAV/ATT selector switch related to IR2 to OFF. | |
F. Operational Test of the Five-Minute Time Delay of ADIRU3 Power Disconnection in Emergency Configuration
5. Close-up| ACTION | RESULT |
|---|---|
| 1.On ADIRS MSU panel 41VU: | On ADIRS MSU panel 41VU: |
|
|
| 2.On the center pedestal, on SWITCHING panel 8VU: | |
| |
| 3.On ADIRS MSU panel 41VU, push the ADR3 pushbutton switch. |
|
| 4.On rear circuit-breaker panel 121VU: | On ADIRS MSU panel 41VU: |
|
|
5.On ADIRS MSU panel 41VU:
| |
| 6.On rear circuit-breaker panel 121VU: | |
| |
| 7.On ADIRS MSU panel 41VU: | On ADIRS MSU panel 41VU: |
|
NOTE: If the time to set the OFF/NAV/ATT selector switch from OFF to NAV is less than 20 seconds, the ON BAT light does not come on. |
8.On ADIRS MSU panel 41VU:
| |
| 9.Set the ATT HDG selector switch to NORM. | |
Subtask 34-10-00-860-068-A
A. Put the aircraft back to its initial configuration.
Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(1) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 34-10-00-410-057-A Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(1) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
B. Close Access
(1) Install the protective cover on battery power center 105VU.
(2) Tighten the two screws.
(3) Close access door 822.
(4) Remove the access platform(s).
(1) Install the protective cover on battery power center 105VU.
(2) Tighten the two screws.
(3) Close access door 822.
(4) Remove the access platform(s).