1. Reason for the Job
Refer to the MPD TASK: 341300-11
CLEANING OF 1 OUT OF 3 PITOT PROBES.
  • To remove dust and particles from the pitot probes.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY
No specific
AR
WIRE - NYLON
98D34103004001
2
CLEANER-PITOT PROBE
98F34103003000
1
FLUSHING TOOL-PITOT PROBE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
125
LATERAL AVIONIC COMPARTMENT
126
LATERAL AVIONIC COMPARTMENT
FOR [9DA1] (PROBE-PITOT, 1)
812
FOR [9DA2] (PROBE-PITOT, 2)
822
FOR [9DA3] (PROBE-PITOT, 3)
812
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 10-11-00-555-013-A
Installation of the Aircraft Protection Equipment
TASK 10-11-00-555-014-A
Removal of the Aircraft Protection Equipment
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 52-41-00-010-002-A
Open the Avionics Compartment Doors for Access
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
3. Job Set-up
Subtask 34-10-00-861-063-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 34-10-00-865-084-A
B. Open, safety and tag these circuit breakers in this sequence:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUCOM NAV/RADAR/15SQ1K13
** ON A/C NOT FOR ALL
121VUCOM NAV/RADAR/25SQ2K14
** ON A/C ALL
FOR FIN: 9DA1 (PROBEPITOT, 1)
122VUANTI ICE/PROBES/1/TAT1DA1Z12
49VUANTI ICE/PROBES/PITOT/13DA1D02
49VUANTI ICE/PROBES/AOA/14DA1D04
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
FOR FIN: 9DA2 (PROBEPITOT, 2)
122VUANTI ICE/PROBES/2/TAT1DA2Y15
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
FOR FIN: 9DA3 (PROBEPITOT, 3)
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
FOR FIN: 9DA1 (PROBEPITOT, 1)
49VUANTI ICE/PROBES/PHC/12DA1D03
FOR FIN: 9DA2 (PROBEPITOT, 2)
122VUANTI ICE/PROBES/PHC/22DA2Y12
FOR FIN: 9DA3 (PROBEPITOT, 3)
122VUANTI ICE/PROBES/PHC/32DA3Y16
Subtask 34-10-00-010-067-A
C. Get access to the avionics compartment.
   (1) Put the ACCESS PLATFORM 2M (6 FT) in position:
  • At zone 125 to get access to pitot probe 1 (9DA1) and pitot probe 3 (9DA3)
  • At zone 126 to get access to pitot probe 2 (9DA2).
   (2) Open the applicable access door (Ref. AMM TASK 52-41-00-010-002):
     (a) FOR [9DA1] (PROBE-PITOT, 1)
     (b) FOR [9DA3] (PROBE-PITOT, 3)
     (c) FOR [9DA2] (PROBE-PITOT, 2)
Subtask 34-10-00-860-079-A
D. Connection of the Dry Nitrogen Source
CAUTION: DO NOT CONNECT THE NITROGEN SOURCE TO THE QUICK-DISCONNECT COUPLING OF THE ADM. IF YOU DO, DAMAGE TO THE ISIS INDICATOR WILL OCCUR.
   (1) Remove the aircraft protection equipment, if installed (Ref. AMM TASK 10-11-00-555-014).
   (2) Disconnect the quick-disconnect coupling from total pitot probe 1 (2 or 3).
   (3) Connect 98F34103003000 FLUSHING TOOL-PITOT PROBE to the quick-disconnect coupling of pitot probe 1 (2 or 3). Then connect the flushing tool to a NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
   (4) Attach the hose of the adapter to prevent movement.
4. Procedure
Subtask 34-10-00-170-061-A
A. Cleaning of the Pitot Probe Drain-Holes (for the Thales Pitot Probes)
   (1) Blow the nitrogen gas from the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY through the hose at a pressure of 2 -0.35 bar or +0.35 bar (29 -5 psi or +5 psi) for approximately three minutes.
   (2) Use the 98D34103004001 CLEANER-PITOT PROBE and the WIRE - NYLON with diameters of 0.7 mm (0.028 in.) and 0.8 MM (0.031 IN.) to clean the drain holes of pitot probe 1 (2, 3):
     (a) Use the WIRE - NYLON with a length of 5 mm (0.197 in.) to make sure that it does not touch the metal tool element and the pitot probe.
     (b) To make the cleaning of the drain holes easier, first use the WIRE - NYLON with a diameter of 0.7 mm (0.028 in.) and then use the WIRE - NYLON with a diameter of 0.8 MM (0.031 IN.).
   (3) Make sure that there is no contamination in the pressurized nitrogen gas at the outlet of pitot probe 1 (2, 3).
   (4) Stop the flow of the nitrogen gas.
   (5) Disconnect the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
   (6) Disconnect the 98F34103003000 FLUSHING TOOL-PITOT PROBE from pitot probe 1 (2, 3).
   (7) Connect the quick-disconnect coupling to pitot probe 1 (2, 3).
   (8) Make sure that you can see the blue ring on the quick-disconnect coupling.
   (9) Pull the quick-disconnect coupling to make sure that it is correctly attached.
   (10) Make sure that the quick-disconnect coupling is correctly engaged (the pin on the quick-disconnect male part is fully engaged into the groove in the quick-disconnect female part).
Subtask 34-10-00-170-062-A
B. Cleaning of the Pitot Probe Drain-Holes (for the Rosemount Aerospace and Goodrich Pitot Probes)
   (1) Blow the nitrogen gas from the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY through the hose at a pressure of 2 -0.35 bar or +0.35 bar (29 -5 psi or +5 psi) for approximately three minutes.
   (2) Use the 98D34103004001 CLEANER-PITOT PROBE and the WIRE - NYLON with diameters of 0.6 mm (0.024 in.) and 0.7 mm (0.028 in.) to clean the drain holes of pitot probe 1 (2, 3):
     (a) Use the WIRE - NYLON with a length of 5 mm (0.197 in.) to make sure that it does not touch the metal tool element and the pitot probe.
     (b) To make the cleaning of the drain holes easier, first use the WIRE - NYLON with a diameter of 0.6 mm (0.024 in.) and then use the WIRE - NYLON with a diameter of 0.7 mm (0.028 in.).
   (3) Make sure that there is no contamination in the pressurized nitrogen gas at the outlet of pitot probe 1 (2, 3).
   (4) Stop the flow of the nitrogen gas.
   (5) Disconnect the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
   (6) Disconnect the 98F34103003000 FLUSHING TOOL-PITOT PROBE from pitot probe 1 (2, 3).
   (7) Connect the quick-disconnect coupling to pitot probe 1 (2, 3).
   (8) Make sure that you can see the blue ring on the quick-disconnect coupling.
   (9) Pull the quick-disconnect coupling to make sure that it is correctly attached.
   (10) Make sure that the quick-disconnect coupling is correctly engaged (the pin on the quick-disconnect male part is fully engaged into the groove in the quick-disconnect female part).
Subtask 34-10-00-170-058-A
C. After the Cleaning Procedure
WARNING: IF YOU DISCONNECT PITOT PROBE 3, OR IF YOU DISCONNECT MORE THAN ONE PITOT PROBE, MAKE SURE THAT A SECOND QUALIFIED MECHANIC DOES A VISUAL INSPECTION OF THE QUICK-DISCONNECT COUPLING CONNECTIONS. THE TWO MECHANICS MUST SIGN OFF THE JOB.
   (1) Refer to the table that follows to know if you must do two checks of the quick-disconnect couplings and/or the leak test:
Condition
Two Checks of the Quick-Disconnect Couplings
Leak Test
One pitot drain-hole cleaning
ADR 1 or ADR 2
No
No
More than one pitot drain-hole cleaning or ADR 3 drain-hole cleaning
Yes
No
     (a) If you must do two checks of the quick-disconnect coupling:
  • Tell a second qualified mechanic to do a visual inspection of the quick-disconnect coupling (the signature of the two mechanics is mandatory).
  • Make sure that the quick-disconnect coupling is correctly engaged (the pin located on the quick-disconnect male part must be fully engaged into the groove in the quick-disconnect female part).
   (2) Install the aircraft protection equipment, if necessary (Ref. AMM TASK 10-11-00-555-013).
Subtask 34-10-00-865-085-A
D. Remove the safety clips and tags and close these circuit breakers in this sequence:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUCOM NAV/RADAR/15SQ1K13
** ON A/C NOT FOR ALL
121VUCOM NAV/RADAR/25SQ2K14
** ON A/C ALL
FOR FIN: 9DA1 (PROBEPITOT, 1)
49VUANTI ICE/PROBES/PHC/12DA1D03
FOR FIN: 9DA2 (PROBEPITOT, 2)
122VUANTI ICE/PROBES/PHC/22DA2Y12
FOR FIN: 9DA3 (PROBEPITOT, 3)
122VUANTI ICE/PROBES/PHC/32DA3Y16
FOR FIN: 9DA1 (PROBEPITOT, 1)
122VUANTI ICE/PROBES/1/TAT1DA1Z12
49VUANTI ICE/PROBES/PITOT/13DA1D02
49VUANTI ICE/PROBES/AOA/14DA1D04
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
FOR FIN: 9DA2 (PROBEPITOT, 2)
122VUANTI ICE/PROBES/2/TAT1DA2Y15
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
FOR FIN: 9DA3 (PROBEPITOT, 3)
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
5. Close-up
Subtask 34-10-00-410-067-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the applicable access door (Ref. AMM TASK 52-41-00-410-002):
     (a) FOR [9DA1] (PROBE-PITOT, 1)
     (b) FOR [9DA3] (PROBE-PITOT, 3)
     (c) FOR [9DA2] (PROBE-PITOT, 2)
   (3) Remove the access platform(s).
Subtask 34-10-00-862-064-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.02 06:22:59 UTC