Cleaning of 1 out of 3 Pitot Probes
TASK 34-10-00-170-004-A
Cleaning of 1 out of 3 Pitot Probes
Refer to the MPD TASK: 341300-11
CLEANING OF 1 OUT OF 3 PITOT PROBES.
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 34-10-00-861-063-A Subtask 34-10-00-865-084-A
Subtask 34-10-00-170-061-A
Subtask 34-10-00-410-067-A
[Rev.10 from 2021]
2026.04.02 07:24:44 UTC
Cleaning of 1 out of 3 Pitot Probes
WARNING:
MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE OPENED, SAFETIED AND TAGGED.
WARNING:
BEFORE YOU OPEN PHC CIRCUIT BREAKERS 2DA1(2,3), OPEN PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3). IF YOU DO NOT OBEY THIS SEQUENCE:
- THE PROBES WILL BECOME TOO HOT.
- THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
1. Reason for the JobRefer to the MPD TASK: 341300-11
CLEANING OF 1 OUT OF 3 PITOT PROBES.
- To remove dust and particles from the pitot probes.
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY |
| No specific | AR | WIRE - NYLON |
| 98D34103004001 | 2 | CLEANER-PITOT PROBE |
| 98F34103003000 | 1 | FLUSHING TOOL-PITOT PROBE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 125 | LATERAL AVIONIC COMPARTMENT |
| 126 | LATERAL AVIONIC COMPARTMENT |
| FOR [9DA1] (PROBE-PITOT, 1) | |
| 812 | |
| FOR [9DA2] (PROBE-PITOT, 2) | |
| 822 | |
| FOR [9DA3] (PROBE-PITOT, 3) | |
| 812 | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 10-11-00-555-013-A | Installation of the Aircraft Protection Equipment |
| TASK 10-11-00-555-014-A | Removal of the Aircraft Protection Equipment |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 34-10-00-861-063-A Subtask 34-10-00-865-084-A
B. Open, safety and tag these circuit breakers in this sequence:
Subtask 34-10-00-010-067-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | COM NAV/RADAR/1 | 5SQ1 | K13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/RADAR/2 | 5SQ2 | K14 |
| ** ON A/C ALL | |||
| FOR FIN: 9DA1 (PROBEPITOT, 1) | |||
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| FOR FIN: 9DA2 (PROBEPITOT, 2) | |||
| 122VU | ANTI ICE/PROBES/2/TAT | 1DA2 | Y15 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| FOR FIN: 9DA3 (PROBEPITOT, 3) | |||
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
| FOR FIN: 9DA1 (PROBEPITOT, 1) | |||
| 49VU | ANTI ICE/PROBES/PHC/1 | 2DA1 | D03 |
| FOR FIN: 9DA2 (PROBEPITOT, 2) | |||
| 122VU | ANTI ICE/PROBES/PHC/2 | 2DA2 | Y12 |
| FOR FIN: 9DA3 (PROBEPITOT, 3) | |||
| 122VU | ANTI ICE/PROBES/PHC/3 | 2DA3 | Y16 |
C. Get access to the avionics compartment.
(1) Put the ACCESS PLATFORM 2M (6 FT) in position:
(a) FOR [9DA1] (PROBE-PITOT, 1)
Subtask 34-10-00-860-079-A (1) Put the ACCESS PLATFORM 2M (6 FT) in position:
- At zone 125 to get access to pitot probe 1 (9DA1) and pitot probe 3 (9DA3)
- At zone 126 to get access to pitot probe 2 (9DA2).
(a) FOR [9DA1] (PROBE-PITOT, 1)
- 812.
- 812.
- 822.
D. Connection of the Dry Nitrogen Source
(2) Disconnect the quick-disconnect coupling from total pitot probe 1 (2 or 3).
(3) Connect 98F34103003000 FLUSHING TOOL-PITOT PROBE to the quick-disconnect coupling of pitot probe 1 (2 or 3). Then connect the flushing tool to a NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
(4) Attach the hose of the adapter to prevent movement.
4. ProcedureCAUTION:
DO NOT CONNECT THE NITROGEN SOURCE TO THE QUICK-DISCONNECT COUPLING OF THE ADM. IF YOU DO, DAMAGE TO THE ISIS INDICATOR WILL OCCUR.
(1) Remove the aircraft protection equipment, if installed (Ref. AMM TASK 10-11-00-555-014). (2) Disconnect the quick-disconnect coupling from total pitot probe 1 (2 or 3).
(3) Connect 98F34103003000 FLUSHING TOOL-PITOT PROBE to the quick-disconnect coupling of pitot probe 1 (2 or 3). Then connect the flushing tool to a NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
(4) Attach the hose of the adapter to prevent movement.
Subtask 34-10-00-170-061-A
A. Cleaning of the Pitot Probe Drain-Holes (for the Thales Pitot Probes)
(1) Blow the nitrogen gas from the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY through the hose at a pressure of 2 -0.35 bar or +0.35 bar (29 -5 psi or +5 psi) for approximately three minutes.
(2) Use the 98D34103004001 CLEANER-PITOT PROBE and the WIRE - NYLON with diameters of 0.7 mm (0.028 in.) and 0.8 MM (0.031 IN.) to clean the drain holes of pitot probe 1 (2, 3):
(a) Use the WIRE - NYLON with a length of 5 mm (0.197 in.) to make sure that it does not touch the metal tool element and the pitot probe.
(b) To make the cleaning of the drain holes easier, first use the WIRE - NYLON with a diameter of 0.7 mm (0.028 in.) and then use the WIRE - NYLON with a diameter of 0.8 MM (0.031 IN.).
(3) Make sure that there is no contamination in the pressurized nitrogen gas at the outlet of pitot probe 1 (2, 3).
(4) Stop the flow of the nitrogen gas.
(5) Disconnect the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
(6) Disconnect the 98F34103003000 FLUSHING TOOL-PITOT PROBE from pitot probe 1 (2, 3).
(7) Connect the quick-disconnect coupling to pitot probe 1 (2, 3).
(8) Make sure that you can see the blue ring on the quick-disconnect coupling.
(9) Pull the quick-disconnect coupling to make sure that it is correctly attached.
(10) Make sure that the quick-disconnect coupling is correctly engaged (the pin on the quick-disconnect male part is fully engaged into the groove in the quick-disconnect female part).
Subtask 34-10-00-170-062-A (1) Blow the nitrogen gas from the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY through the hose at a pressure of 2 -0.35 bar or +0.35 bar (29 -5 psi or +5 psi) for approximately three minutes.
(2) Use the 98D34103004001 CLEANER-PITOT PROBE and the WIRE - NYLON with diameters of 0.7 mm (0.028 in.) and 0.8 MM (0.031 IN.) to clean the drain holes of pitot probe 1 (2, 3):
(a) Use the WIRE - NYLON with a length of 5 mm (0.197 in.) to make sure that it does not touch the metal tool element and the pitot probe.
(b) To make the cleaning of the drain holes easier, first use the WIRE - NYLON with a diameter of 0.7 mm (0.028 in.) and then use the WIRE - NYLON with a diameter of 0.8 MM (0.031 IN.).
(3) Make sure that there is no contamination in the pressurized nitrogen gas at the outlet of pitot probe 1 (2, 3).
(4) Stop the flow of the nitrogen gas.
(5) Disconnect the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
(6) Disconnect the 98F34103003000 FLUSHING TOOL-PITOT PROBE from pitot probe 1 (2, 3).
(7) Connect the quick-disconnect coupling to pitot probe 1 (2, 3).
(8) Make sure that you can see the blue ring on the quick-disconnect coupling.
(9) Pull the quick-disconnect coupling to make sure that it is correctly attached.
(10) Make sure that the quick-disconnect coupling is correctly engaged (the pin on the quick-disconnect male part is fully engaged into the groove in the quick-disconnect female part).
B. Cleaning of the Pitot Probe Drain-Holes (for the Rosemount Aerospace and Goodrich Pitot Probes)
(1) Blow the nitrogen gas from the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY through the hose at a pressure of 2 -0.35 bar or +0.35 bar (29 -5 psi or +5 psi) for approximately three minutes.
(2) Use the 98D34103004001 CLEANER-PITOT PROBE and the WIRE - NYLON with diameters of 0.6 mm (0.024 in.) and 0.7 mm (0.028 in.) to clean the drain holes of pitot probe 1 (2, 3):
(a) Use the WIRE - NYLON with a length of 5 mm (0.197 in.) to make sure that it does not touch the metal tool element and the pitot probe.
(b) To make the cleaning of the drain holes easier, first use the WIRE - NYLON with a diameter of 0.6 mm (0.024 in.) and then use the WIRE - NYLON with a diameter of 0.7 mm (0.028 in.).
(3) Make sure that there is no contamination in the pressurized nitrogen gas at the outlet of pitot probe 1 (2, 3).
(4) Stop the flow of the nitrogen gas.
(5) Disconnect the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
(6) Disconnect the 98F34103003000 FLUSHING TOOL-PITOT PROBE from pitot probe 1 (2, 3).
(7) Connect the quick-disconnect coupling to pitot probe 1 (2, 3).
(8) Make sure that you can see the blue ring on the quick-disconnect coupling.
(9) Pull the quick-disconnect coupling to make sure that it is correctly attached.
(10) Make sure that the quick-disconnect coupling is correctly engaged (the pin on the quick-disconnect male part is fully engaged into the groove in the quick-disconnect female part).
Subtask 34-10-00-170-058-A (1) Blow the nitrogen gas from the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY through the hose at a pressure of 2 -0.35 bar or +0.35 bar (29 -5 psi or +5 psi) for approximately three minutes.
(2) Use the 98D34103004001 CLEANER-PITOT PROBE and the WIRE - NYLON with diameters of 0.6 mm (0.024 in.) and 0.7 mm (0.028 in.) to clean the drain holes of pitot probe 1 (2, 3):
(a) Use the WIRE - NYLON with a length of 5 mm (0.197 in.) to make sure that it does not touch the metal tool element and the pitot probe.
(b) To make the cleaning of the drain holes easier, first use the WIRE - NYLON with a diameter of 0.6 mm (0.024 in.) and then use the WIRE - NYLON with a diameter of 0.7 mm (0.028 in.).
(3) Make sure that there is no contamination in the pressurized nitrogen gas at the outlet of pitot probe 1 (2, 3).
(4) Stop the flow of the nitrogen gas.
(5) Disconnect the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
(6) Disconnect the 98F34103003000 FLUSHING TOOL-PITOT PROBE from pitot probe 1 (2, 3).
(7) Connect the quick-disconnect coupling to pitot probe 1 (2, 3).
(8) Make sure that you can see the blue ring on the quick-disconnect coupling.
(9) Pull the quick-disconnect coupling to make sure that it is correctly attached.
(10) Make sure that the quick-disconnect coupling is correctly engaged (the pin on the quick-disconnect male part is fully engaged into the groove in the quick-disconnect female part).
C. After the Cleaning Procedure
(a) If you must do two checks of the quick-disconnect coupling:
Subtask 34-10-00-865-085-A WARNING:
IF YOU DISCONNECT PITOT PROBE 3, OR IF YOU DISCONNECT MORE THAN ONE PITOT PROBE, MAKE SURE THAT A SECOND QUALIFIED MECHANIC DOES A VISUAL INSPECTION OF THE QUICK-DISCONNECT COUPLING CONNECTIONS.
THE TWO MECHANICS MUST SIGN OFF THE JOB.
(1) Refer to the table that follows to know if you must do two checks of the quick-disconnect couplings and/or the leak test:| Condition | Two Checks of the Quick-Disconnect Couplings | Leak Test |
| One pitot drain-hole cleaning ADR 1 or ADR 2 | No | No |
| More than one pitot drain-hole cleaning or ADR 3 drain-hole cleaning | Yes | No |
- Tell a second qualified mechanic to do a visual inspection of the quick-disconnect coupling (the signature of the two mechanics is mandatory).
- Make sure that the quick-disconnect coupling is correctly engaged (the pin located on the quick-disconnect male part must be fully engaged into the groove in the quick-disconnect female part).
D. Remove the safety clips and tags and close these circuit breakers in this sequence:
5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | COM NAV/RADAR/1 | 5SQ1 | K13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/RADAR/2 | 5SQ2 | K14 |
| ** ON A/C ALL | |||
| FOR FIN: 9DA1 (PROBEPITOT, 1) | |||
| 49VU | ANTI ICE/PROBES/PHC/1 | 2DA1 | D03 |
| FOR FIN: 9DA2 (PROBEPITOT, 2) | |||
| 122VU | ANTI ICE/PROBES/PHC/2 | 2DA2 | Y12 |
| FOR FIN: 9DA3 (PROBEPITOT, 3) | |||
| 122VU | ANTI ICE/PROBES/PHC/3 | 2DA3 | Y16 |
| FOR FIN: 9DA1 (PROBEPITOT, 1) | |||
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| FOR FIN: 9DA2 (PROBEPITOT, 2) | |||
| 122VU | ANTI ICE/PROBES/2/TAT | 1DA2 | Y15 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| FOR FIN: 9DA3 (PROBEPITOT, 3) | |||
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
Subtask 34-10-00-410-067-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the applicable access door (Ref. AMM TASK 52-41-00-410-002):
(a) FOR [9DA1] (PROBE-PITOT, 1)
Subtask 34-10-00-862-064-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the applicable access door (Ref. AMM TASK 52-41-00-410-002):
(a) FOR [9DA1] (PROBE-PITOT, 1)
- 812.
- 812.
- 822.
Check of the Quick-Disconnect Coupling