W DOC AIRBUS | AMM A320F

Removal of the Power Supply Unit of the Tail Cone Strobe-Light


TASK 33-48-39-000-001-A
Removal of the Power Supply Unit of the Tail Cone Strobe-Light


FIN: 18LV
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
3. Job Set-up
Subtask 33-48-39-861-050-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 33-48-39-865-053-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VULIGHTING/WING/STROBE10LVV05
Subtask 33-48-39-010-050-A
C. Get Access
   (1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the access door 314AR at Zone 310.
   (2) Be careful not to step on a closed access door.
   (3) Open access door 314AR and safety it in the open position.
   (4) Set the light switch to on.
4. Procedure
Subtask 33-48-39-020-050-A
A. Removal of the Power Supply Unit (18LV)
   (1) Disconnect the electrical connectors (4) and (5).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Remove the screws (2) and the washers (3).
   (4) Remove the power supply unit (1).
[Rev.10 from 2021] 2026.04.01 00:56:48 UTC