Replacement of the Glass Assembly of the LED Landing Light
TASK 33-42-11-960-802-A
Replacement of the Glass Assembly of the LED Landing Light
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 33-42-11-941-059-A
Subtask 33-42-11-210-062-A
Subtask 33-42-11-860-059-A
[Rev.10 from 2021]
2026.04.01 00:55:24 UTC
Replacement of the Glass Assembly of the LED Landing Light
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THERE ARE NO SIGNS OF FUEL CONTAMINATION IN THE LANDING LIGHT ASSEMBLY.
IF YOU FIND FUEL CONTAMINATION, NO PERSON MUST OPERATE THE LANDING LIGHT UNTIL:
- YOU REPAIR THE FUEL LEAK
- YOU REPLACE THE LANDING LIGHT ASSEMBLY.
WARNING:
WEAR GLASSES AND PROTECTIVE CLOTHING WHEN YOU DO WORK ON THE LIGHT. THE LAMP IS PRESSURIZED AND AN EXPLOSION CAN OCCUR.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
WHEN YOU REPLACE A LANDING LIGHT LAMP, EXAMINE THE APPLICABLE LANDING LIGHT ASSEMBLY FOR SIGNS OF FUEL CONTAMINATION. IF YOU FIND FUEL CONTAMINATION, EXAMINE THE ITEMS THAT FOLLOW FOR SIGNS OF FUEL LEAKAGE:
1. Reason for the Job- THE FUEL PUMP(S) 21QA(26QA) OR 25QA(22QA)
- THE WATER DRAIN VALVE 25QM(26QM) DIRECTLY FORWARD OF THE LANDING LIGHT ASSEMBLY.
- THE LEAK IS REPAIRED
- THE LANDING LIGHT ASSEMBLY IS REPLACED.
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 571 | MLG BAY |
| 671 | MLG BAY |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 5 | GLASS ASSEMBLY | AIPC 33-42-11-01-010 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 28-11-00-280-002-A | Structural Fuel Tank Leaks - General Information |
| TASK 28-11-41-000-003-A | Removal of the Water Drain Valve |
| TASK 28-21-51-000-001-A | Removal of the Fuel Pumps |
| TASK 33-42-00-710-001-A | Operational Test of the Landing Lights |
Subtask 33-42-11-941-059-A
A. Safety Precautions
(1) Put the SAFETY BARRIER(S) in position.
(2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate the landing lights.
Subtask 33-42-11-010-054-A (1) Put the SAFETY BARRIER(S) in position.
(2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate the landing lights.
B. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position as applicable:
(a) FOR [7LB] (LT-LANDING, L)
below zone 571
(b) FOR [8LB] (LT-LANDING, R)
below zone 671.
Subtask 33-42-11-860-058-A (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position as applicable:
(a) FOR [7LB] (LT-LANDING, L)
below zone 571
(b) FOR [8LB] (LT-LANDING, R)
below zone 671.
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Extend the landing light (4):
(a) In zone 571 (671), make sure that the travel range of the landing light (4) is clear.
(b) In the cockpit, on the lighting panel 25VU, set the LAND L (R) switch to the OFF position.
(c) Make sure that the landing light (4) extends.
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 33-42-11-865-065-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Extend the landing light (4):
(a) In zone 571 (671), make sure that the travel range of the landing light (4) is clear.
(b) In the cockpit, on the lighting panel 25VU, set the LAND L (R) switch to the OFF position.
(c) Make sure that the landing light (4) extends.
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
D. Open, safety and tag this(these) circuit breaker(s):
Subtask 33-42-11-860-060-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | LIGHTING/LANDING LT/R/CTL | 4LB | T07 |
| 122VU | LIGHTING/LANDING LT/R/SPLY | 2LB | T06 |
| 122VU | LIGHTING/LANDING LT/L/CTL | 3LB | T05 |
| 122VU | LIGHTING/LANDING LT/L/SPLY | 1LB | T04 |
E. Aircraft Maintenance Configuration
(a) Use a PLIERS - CIRCLIP and remove the seeger rings (2).
(b) Remove the spring inoxes (3) and the steel arms (1).
(c) Turn the landing light (4) until you get access to the captive screws (6).
(d) Install the steel arms (1) and the spring inoxes (3) in the correct position.
(e) Use a PLIERS - CIRCLIP and install the seeger rings (2).
4. ProcedureNOTE: This procedure is only applicable if the landing light (4) does not extend correctly in Para. 3.C.
(1) If the landing light (4) does not extend correctly, do the steps that follow: (a) Use a PLIERS - CIRCLIP and remove the seeger rings (2).
(b) Remove the spring inoxes (3) and the steel arms (1).
(c) Turn the landing light (4) until you get access to the captive screws (6).
(d) Install the steel arms (1) and the spring inoxes (3) in the correct position.
(e) Use a PLIERS - CIRCLIP and install the seeger rings (2).
Subtask 33-42-11-210-062-A
A. Examine the Landing Light Assembly for Fuel Contamination
(1) Examine the landing light assembly for signs of fuel contamination.
(2) If you find fuel contamination, examine the items that follow for fuel leakage:
Subtask 33-42-11-020-055-A (1) Examine the landing light assembly for signs of fuel contamination.
(2) If you find fuel contamination, examine the items that follow for fuel leakage:
- The fuel pumps 21QA(26QA) and 25QA(22QA) (Ref. AMM TASK 28-21-51-000-001)
- The water drain valve 25QM(26QM) (Ref. AMM TASK 28-11-41-000-003)
- The wing tank structure (Ref. AMM TASK 28-11-00-280-002).
B. Removal of the Glass Assembly
(1) Loosen the captive screws (6) of the landing light (4).
(2) Remove the glass assembly (5).
Subtask 33-42-11-420-058-A (1) Loosen the captive screws (6) of the landing light (4).
(2) Remove the glass assembly (5).
C. Installation of the Glass Assembly
(1) Install a new AIPC 33-42-11-01-010 GLASS ASSEMBLY (5) on the landing light (4).
(2) TORQUE the captive screws (6) to between 0.0935 and 0.0765 m.daN (8.27 and 6.77 lbf.in )
.
Subtask 33-42-11-865-066-A (1) Install a new AIPC 33-42-11-01-010 GLASS ASSEMBLY (5) on the landing light (4).
(2) TORQUE the captive screws (6) to between 0.0935 and 0.0765 m.daN (8.27 and 6.77 lbf.in )
. D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 33-42-11-710-055-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | LIGHTING/LANDING LT/R/CTL | 4LB | T07 |
| 122VU | LIGHTING/LANDING LT/R/SPLY | 2LB | T06 |
| 122VU | LIGHTING/LANDING LT/L/CTL | 3LB | T05 |
| 122VU | LIGHTING/LANDING LT/L/SPLY | 1LB | T04 |
E. Operational Test
(1) Do an operational test of the applicable landing light (4) (Ref. AMM TASK 33-42-00-710-001).
(2) Clean the glass assembly (5) with a clean Textile-Lint free Cotton - (Material No.14SBA1) .
5. Close-up(1) Do an operational test of the applicable landing light (4) (Ref. AMM TASK 33-42-00-710-001).
(2) Clean the glass assembly (5) with a clean Textile-Lint free Cotton - (Material No.14SBA1) .
Subtask 33-42-11-860-059-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Retract the landing light (4):
(a) In zone 571 (671), make sure that the travel range of the landing light is clear.
(b) In the cockpit, on the lighting panel 25VU, set the LAND L (R) switch to the RETRACT position.
(c) Make sure that the landing light (4) retracts.
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 33-42-11-942-055-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Retract the landing light (4):
(a) In zone 571 (671), make sure that the travel range of the landing light is clear.
(b) In the cockpit, on the lighting panel 25VU, set the LAND L (R) switch to the RETRACT position.
(c) Make sure that the landing light (4) retracts.
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the safety barriers.
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the safety barriers.
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Glass Assembly of the LED Landing Light - Location and Details