1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [10LL] (MAINTENANCE LIGHT)
196BB
FOR [9LL] (MAINTENANCE LIGHT)
195BB
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 33-37-00-710-001-A
Operational Test of the Wheel Well Lighting
F MLG Dome Light ** ON A/C NOT FOR ALL
F MLG Dome Light ** ON A/C NOT FOR ALL
FOR [7LL] (MAINTENANCE LIGHT)
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
FOR [8LL] (MAINTENANCE LIGHT)
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
3. Job Set-up
Subtask 33-37-11-865-051-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VULIGHTING/WHL WELL/LTG/DOME2LLX08
4. Procedure
Subtask 33-37-11-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the MLG Dome Light.
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (4) Support the MLG dome light (1) and install the electrical connectors (6) with the washers (5) and the nuts (4).
   (5) Install the MLG dome light (1) with the washers (3) and the screws (2).
Subtask 33-37-11-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VULIGHTING/WHL WELL/LTG/DOME2LLX08
Subtask 33-37-11-710-050-A ** ON A/C NOT FOR ALL
C. Do the operational test of the wheel well lights (Ref. AMM TASK 33-37-00-710-001).
5. Close-up
Subtask 33-37-11-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the access platform(s).
   (3) Close the applicable access door/panel:
     (a) FOR [7LL] (MAINTENANCE LIGHT)
Close the left MLG door 734 (Ref. AMM TASK 32-12-00-410-001).
     (b) FOR [8LL] (MAINTENANCE LIGHT)
Close the right MLG door 744 (Ref. AMM TASK 32-12-00-410-001).
     (c) FOR [9LL] (MAINTENANCE LIGHT)
Close the access panel 195BB.
     (d) FOR [10LL] (MAINTENANCE LIGHT)
Close the access panel 196BB.
Subtask 33-37-11-410-050-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the access platform(s).
   (3) Close the applicable access door:
     (a) FOR [7LL] (MAINTENANCE LIGHT)
Close the left MLG door 734 (Ref. AMM TASK 32-12-00-410-001).
     (b) FOR [8LL] (MAINTENANCE LIGHT)
Close the right MLG door 744 (Ref. AMM TASK 32-12-00-410-001).