Removal of the MLG Dome Light (HELLA)
TASK 33-37-11-000-001-A
Removal of the MLG Dome Light (HELLA)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 33-37-11-865-050-A ** ON A/C NOT FOR ALL
Subtask 33-37-11-020-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:54:40 UTC
Removal of the MLG Dome Light (HELLA)
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
NOTE: The procedure is the same for all MLG dome lights (HELLA).
FIN: 10LL ** ON A/C NOT FOR ALL
FIN: 7LL ** ON A/C NOT FOR ALL
FIN: 8LL ** ON A/C NOT FOR ALL
FIN: 9LL ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 7LL ** ON A/C NOT FOR ALL
FIN: 8LL ** ON A/C NOT FOR ALL
FIN: 9LL ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| FOR [10LL] (MAINTENANCE LIGHT) | ||
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| FOR [7LL] (MAINTENANCE LIGHT) | ||
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| FOR [8LL] (MAINTENANCE LIGHT) | ||
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| FOR [9LL] (MAINTENANCE LIGHT) | ||
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [10LL] (MAINTENANCE LIGHT) | |
| 196BB | |
| FOR [9LL] (MAINTENANCE LIGHT) | |
| 195BB | |
| REFERENCE | DESIGNATION |
|---|---|
| FOR [7LL] (MAINTENANCE LIGHT) | |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| FOR [8LL] (MAINTENANCE LIGHT) | |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
Subtask 33-37-11-865-050-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 33-37-11-010-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | LIGHTING/WHL WELL/LTG/DOME | 2LL | X08 |
B. Get Access
(1) Open the applicable access door/panel:
(a) FOR [7LL] (MAINTENANCE LIGHT)
Subtask 33-37-11-010-050-B ** ON A/C NOT FOR ALL (1) Open the applicable access door/panel:
(a) FOR [7LL] (MAINTENANCE LIGHT)
- Open the left MLG door 734 (Ref. AMM TASK 32-12-00-010-001).
- Put the ACCESS PLATFORM 2M (6 FT) in position at zone 147.
- Open the right MLG door 744 (Ref. AMM TASK 32-12-00-010-001).
- Put the ACCESS PLATFORM 2M (6 FT) in position at zone 148.
- Open the access panel 195BB.
- Put the ACCESS PLATFORM 2M (6 FT) in position at zone 195.
- Open the access panel 196BB.
- Put the ACCESS PLATFORM 2M (6 FT) in position at zone 196.
B. Get Access
(1) Open the applicable access door:
(a) FOR [7LL] (MAINTENANCE LIGHT)
4. Procedure(1) Open the applicable access door:
(a) FOR [7LL] (MAINTENANCE LIGHT)
- Open the left MLG door 734 (Ref. AMM TASK 32-12-00-010-001).
- Put the ACCESS PLATFORM 2M (6 FT) in position at zone 147.
- Open the right MLG door 744 (Ref. AMM TASK 32-12-00-010-001).
- Put the ACCESS PLATFORM 2M (6 FT) in position at zone 148.
Subtask 33-37-11-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the MLG Dome Light
(1) Find the MLG dome light.
(2) Support the dome light (1).
(3) Remove the screws (2) and the washers (3).
(4) Remove the nuts (4) and the washers (5).
(5) Remove the electrical connectors (6).
(6) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(7) Remove the dome light (1).
(1) Find the MLG dome light.
(2) Support the dome light (1).
(3) Remove the screws (2) and the washers (3).
(4) Remove the nuts (4) and the washers (5).
(5) Remove the electrical connectors (6).
(6) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(7) Remove the dome light (1).
MLG Dome Light