Installation of the Lavatory-Occupied Signs (WJ)
TASK 33-26-23-400-001-A
Installation of the Lavatory-Occupied Signs (WJ)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 33-26-23-865-054-A
Subtask 33-26-23-420-050-B
Subtask 33-26-23-942-051-A
[Rev.10 from 2021]
2026.04.01 00:53:57 UTC
Installation of the Lavatory-Occupied Signs (WJ)
ZONE: 220
ZONE: 260
FIN: 13WJ
FIN: 14WJ ** ON A/C NOT FOR ALL
FIN: 23WJ ** ON A/C NOT FOR ALL
FIN: 25WJ ** ON A/C NOT FOR ALL
FIN: 3WJ
1. Reason for the JobZONE: 260
FIN: 13WJ
FIN: 14WJ ** ON A/C NOT FOR ALL
FIN: 23WJ ** ON A/C NOT FOR ALL
FIN: 25WJ ** ON A/C NOT FOR ALL
FIN: 3WJ
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | STEPLADDER 1.0 M (3.3 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 220 | FWD CAB UTILITY AREAS |
| 260 | AFT CABIN UTILITY AREA |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 33-26-00-710-001-A | Operational Test of the Lavatory Lighted Signs WJ |
Subtask 33-26-23-865-054-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 33-26-23-941-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LAV FWD-OCCUPIED | 1WJ | F01 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LAV FWD & MID-OCCUPIED | 1WJ | F01 |
| ** ON A/C ALL | |||
| 2001VU | LAVATORY AFT-OCCUPIED | 11WJ | B04 |
B. Make sure that the STEPLADDER 1.0 M (3.3 FT) is in position below the lavatory-occupied sign.
4. ProcedureSubtask 33-26-23-420-050-B
A. Installation of the Lavatory-Occupied Sign
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(5) Install the sign housing (5) with the washers (3) and the screws (2).
(6) Install the lens (1) on the sign housing (5).
Make sure that you hear a click when the lens (1) locks in position.
Subtask 33-26-23-865-055-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
CAUTION:
REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU CONNECT THE ELECTRICAL WIRES.
INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO EQUIPMENT.
CAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
(4) Connect the electrical connectors (4) to the sign housing (5). (5) Install the sign housing (5) with the washers (3) and the screws (2).
(6) Install the lens (1) on the sign housing (5).
Make sure that you hear a click when the lens (1) locks in position.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 33-26-23-710-050-A 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LAV FWD-OCCUPIED | 1WJ | F01 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LAV FWD & MID-OCCUPIED | 1WJ | F01 |
| ** ON A/C ALL | |||
| 2001VU | LAVATORY AFT-OCCUPIED | 11WJ | B04 |
Subtask 33-26-23-942-051-A
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the stepladder.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the stepladder.
Lavatory-Occupied Sign