Installation of the System 1 (2) Transformer
TASK 33-14-51-400-002-A
Installation of the System 1 (2) Transformer
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 33-14-51-865-055-A
Subtask 33-14-51-420-051-A
Subtask 33-14-51-942-051-A
[Rev.10 from 2021]
2026.04.01 00:53:09 UTC
Installation of the System 1 (2) Transformer
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - BLANKING |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 212 | COCKPIT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 33-14-00-710-001-A | Operational Check of the Light Test System |
Subtask 33-14-51-865-055-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 33-14-51-010-053-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | LIGHTING/TST/BOARD/SPLY | 30LP | X06 |
| FOR FIN: 36LP (XFMRSYS 2) | |||
| 122VU | LIGHTING/ANN LT SPLY/XFMR/BUS 2 | 27LP | X05 |
| FOR FIN: 37LP (XFMRSYS 1) | |||
| 122VU | LIGHTING/ANN LT SPLY/XFMR/BUS 1 | 26LP | X04 |
B. Get Access
(1) Make sure that the panel(s) 121VU and/or 122VU is (are) removed.
(2) Make sure that the quick-disconnect fasteners are loosened for these panels:
(a) FOR [37LP] (XFMR-SYS 1)
122VU.
(b) FOR [36LP] (XFMR-SYS 2)
122VU, 121VU.
(3) Make sure that these panels are pulled to the front.
4. Procedure(1) Make sure that the panel(s) 121VU and/or 122VU is (are) removed.
(2) Make sure that the quick-disconnect fasteners are loosened for these panels:
(a) FOR [37LP] (XFMR-SYS 1)
122VU.
(b) FOR [36LP] (XFMR-SYS 2)
122VU, 121VU.
(3) Make sure that these panels are pulled to the front.
Subtask 33-14-51-420-051-A
A. Installation of the Transformer
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the CAP - BLANKING from the electrical connector.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Install the new transformer (1).
(6) Install the four screws (3) and the washers (2) that attach the transformer (1) to the structure.
(7) Connect the movable connector (4) to the transformer.
Subtask 33-14-51-410-050-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the CAP - BLANKING from the electrical connector.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Install the new transformer (1).
(6) Install the four screws (3) and the washers (2) that attach the transformer (1) to the structure.
(7) Connect the movable connector (4) to the transformer.
B. Install these panels. Attach them with the quick-disconnect fasteners:
(1) FOR [37LP] (XFMR-SYS 1)
122VU
(2) FOR [36LP] (XFMR-SYS 2)
122VU, 121VU
Subtask 33-14-51-865-054-A (1) FOR [37LP] (XFMR-SYS 1)
122VU
(2) FOR [36LP] (XFMR-SYS 2)
122VU, 121VU
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 33-14-51-710-051-A 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | LIGHTING/TST/BOARD/SPLY | 30LP | X06 |
| FOR FIN: 36LP (XFMRSYS 2) | |||
| 122VU | LIGHTING/ANN LT SPLY/XFMR/BUS 2 | 27LP | X05 |
| FOR FIN: 37LP (XFMRSYS 1) | |||
| 122VU | LIGHTING/ANN LT SPLY/XFMR/BUS 1 | 26LP | X04 |
Subtask 33-14-51-942-051-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(1) Make sure that the work area is clean and clear of tools and other items.
System 1 (2) Transformer