1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
211
COCKPIT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 33-14-00-710-001-A
Operational Check of the Light Test System
3. Job Set-up
Subtask 33-14-51-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VULIGHTING/TST/BOARD/SPLY30LPX06
** ON A/C NOT FOR ALL
FOR FIN: 31LP (XFMRESS)
49VULIGHTING/XFMR/115V.5V/ESS BUS29LPH03
** ON A/C NOT FOR ALL
49VULIGHTING/XFMR/115V.5V/ESS BUS29LPH01
** ON A/C NOT FOR ALL
FOR FIN: 35LP (XFMRESS)
49VULIGHTING/XFMR/115V.5V/ESS BUS29LPH03
** ON A/C NOT FOR ALL
49VULIGHTING/XFMR/115V.5V/ESS BUS29LPH01
** ON A/C ALL
122VULIGHTING/ANN LT SPLY/XFMR/STAT INV28LPX03
Subtask 33-14-51-010-052-A
B. Get Access
   (1) Make sure that the ceiling panel 211HC is removed.
4. Procedure
Subtask 33-14-51-420-050-A
A. Installation of the Essential Transformer
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the CAP - BLANKING from the electrical connector.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Install the new transformer (1).
   (6) Tighten the four screws (3) and the washers (2) that attach the transformer (1) to the structure.
   (7) Connect the movable connector (4) to the transformer (1).
Subtask 33-14-51-865-053-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VULIGHTING/TST/BOARD/SPLY30LPX06
** ON A/C NOT FOR ALL
FOR FIN: 31LP (XFMRESS)
49VULIGHTING/XFMR/115V.5V/ESS BUS29LPH03
** ON A/C NOT FOR ALL
49VULIGHTING/XFMR/115V.5V/ESS BUS29LPH01
** ON A/C NOT FOR ALL
FOR FIN: 35LP (XFMRESS)
49VULIGHTING/XFMR/115V.5V/ESS BUS29LPH03
** ON A/C NOT FOR ALL
49VULIGHTING/XFMR/115V.5V/ESS BUS29LPH01
** ON A/C ALL
122VULIGHTING/ANN LT SPLY/XFMR/STAT INV28LPX03
Subtask 33-14-51-710-050-A
C. Do the operational test (Ref. AMM TASK 33-14-00-710-001).
5. Close-up
Subtask 33-14-51-410-051-A
A. Close Access
   (1) Install the ceiling panel 211HC with an ALLEN wrench.
   (2) Make sure that the work area is clean and clear of tools and other items.