1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.25 and 0.20 m.daN (22.12 and 17.70 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
211
COCKPIT
212
COCKPIT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 33-12-00-710-001-A
Operational Test of the General Illumination
3. Job Set-up
Subtask 33-12-17-865-057-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH08
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH06
** ON A/C NOT FOR ALL
122VULIGHTING/FLOOD/CTR INST/PNL2LEZ04
4. Procedure
Subtask 33-12-17-420-054-A ** ON A/C NOT FOR ALL
A. Installation of Pedestal Flood-Light Single-Control-Box (50LE)
   (1) Do an inspection of the component interfaces and the adjacent area.
   (2) If the new single control box (9) has the washer (8) and the nut (7):
  • Make sure that you remove them before you put the single control box (9) in position.
   (3) Install the single control box (9) through the hole of the flood-light panel 112VU (1).
   (4) Install the washer (8) and the nut (7).
   (5) TORQUE the nut (7) to between 0.25 and 0.20 m.daN (22.12 and 17.70 lbf.in ) T.
   (6) Put the placard (3) in position on the flood-light panel 112VU (1) and hold it in this position.
   (7) Attach the placard (3) with the two screws (4).
   (8) Install the knob (5). Be careful not to cause damage to the flat of the axle of the single control box (9).
   (9) Tighten the two screws (6).
   (10) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (11) Make sure that all the electrical connections are clean and in the correct condition.
   (12) Install the connector (10) and attach it with the two screws (11) at the rear of the single control box (9).
   (13) Install flood-light panel 112VU (1) with the two fasteners (2).
Subtask 33-12-17-420-055-A ** ON A/C NOT FOR ALL Subtask 33-12-17-865-058-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH08
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH06
** ON A/C NOT FOR ALL
122VULIGHTING/FLOOD/CTR INST/PNL2LEZ04
Subtask 33-12-17-710-052-A ** ON A/C NOT FOR ALL
5. Close-up
Subtask 33-12-17-942-052-A ** ON A/C NOT FOR ALL
A. Make sure that the work area is clean and clear of tools and other items.