Installation of the Rheostat - Flood Light
TASK 33-12-17-400-001-A
Installation of the Rheostat - Flood Light
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Expendable Parts
C. Referenced Information
3. Job Set-up
Subtask 33-12-17-865-051-A ** ON A/C NOT FOR ALL
Subtask 33-12-17-420-050-A ** ON A/C NOT FOR ALL
Subtask 33-12-17-942-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:52:40 UTC
Installation of the Rheostat - Flood Light
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 211 | COCKPIT |
| 212 | COCKPIT |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 9 | RHEOSTAT | AIPC 33-12-08-02-130 |
| 20 | RHEOSTAT | AIPC 33-12-08-02-140 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 33-12-00-710-001-A | Operational Test of the General Illumination |
Subtask 33-12-17-865-051-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | LIGHTING/EMER LT/CKPT/DOME | 1LE | H08 |
| 122VU | LIGHTING/FLOOD/CTR INST/PNL | 2LE | Z04 |
Subtask 33-12-17-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Pedestal Flood-Light Rheostat (28LE)
(1) Do an inspection of the component interfaces and the adjacent area.
(2) Install a new AIPC 33-12-08-02-130 RHEOSTAT (9) through the hole of the panel 112VU (9).
(3) Install the washer (8) and tighten the nut (7).
(4) Put the placard (3) in position on the panel 112VU (1) and hold it in this position.
(5) Attach the placard (3) with the two screws (4).
(6) Install the knob (5). Be careful not to damage the flat of the axle of the rheostat (9).
(7) Tighten the two screws (6).
(8) Remove the CAP-BLANKING from each electrical connector and receptacle.
(9) Make sure that all the electrical connections are clean and in the correct condition.
(10) Install the connector (10) and attach it with the two screws (11) on the back of the rheostat (9).
(11) Install the panel 112VU (1) with the two fasteners (2).
Subtask 33-12-17-420-051-A ** ON A/C NOT FOR ALL (1) Do an inspection of the component interfaces and the adjacent area.
(2) Install a new AIPC 33-12-08-02-130 RHEOSTAT (9) through the hole of the panel 112VU (9).
(3) Install the washer (8) and tighten the nut (7).
(4) Put the placard (3) in position on the panel 112VU (1) and hold it in this position.
(5) Attach the placard (3) with the two screws (4).
(6) Install the knob (5). Be careful not to damage the flat of the axle of the rheostat (9).
(7) Tighten the two screws (6).
(8) Remove the CAP-BLANKING from each electrical connector and receptacle.
(9) Make sure that all the electrical connections are clean and in the correct condition.
(10) Install the connector (10) and attach it with the two screws (11) on the back of the rheostat (9).
(11) Install the panel 112VU (1) with the two fasteners (2).
B. Installation of the Main-Panel Flood-Light Rheostat (35LE)
(1) Do an inspection of the component interfaces and the adjacent area.
(2) Install a new AIPC 33-12-08-02-140 RHEOSTAT (20) through the hole of the panel 111VU (12).
(3) Install the washer (19) and tighten the nut (18).
(4) Put the placard (14) in position on the panel 111VU (12) and hold it in this position.
(5) Attach the placard (14) with the two screws (15).
(6) Install the knob (16). Be careful not to damage the flat of the axle of the rheostat (20).
(7) Tighten the two screws (17).
(8) Remove the CAP-BLANKING from each electrical connector and receptacle.
(9) Make sure that all the electrical connections are clean and in the correct condition.
(10) Install the connector (21) and attach it with the two screws (22) on the back of the rheostat (20).
(11) Install the panel 111VU (12) with the two fasteners (13).
Subtask 33-12-17-865-052-A ** ON A/C NOT FOR ALL (1) Do an inspection of the component interfaces and the adjacent area.
(2) Install a new AIPC 33-12-08-02-140 RHEOSTAT (20) through the hole of the panel 111VU (12).
(3) Install the washer (19) and tighten the nut (18).
(4) Put the placard (14) in position on the panel 111VU (12) and hold it in this position.
(5) Attach the placard (14) with the two screws (15).
(6) Install the knob (16). Be careful not to damage the flat of the axle of the rheostat (20).
(7) Tighten the two screws (17).
(8) Remove the CAP-BLANKING from each electrical connector and receptacle.
(9) Make sure that all the electrical connections are clean and in the correct condition.
(10) Install the connector (21) and attach it with the two screws (22) on the back of the rheostat (20).
(11) Install the panel 111VU (12) with the two fasteners (13).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 33-12-17-710-050-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | LIGHTING/EMER LT/CKPT/DOME | 1LE | H08 |
| 122VU | LIGHTING/FLOOD/CTR INST/PNL | 2LE | Z04 |
Subtask 33-12-17-942-050-A ** ON A/C NOT FOR ALL
A. Make sure that the work area is clean and clear of tools and other items.
Main Panel and Pedestal Flood Light Rheostats