Installation of the Center Main-Instrument-Panel Light


TASK 33-12-13-400-002-A
Installation of the Center Main-Instrument-Panel Light


CAUTION: DO NOT TOUCH THE LAMP GLASS WITH YOUR FINGERS. THE OILS FROM YOUR SKIN WILL QUICKLY CAUSE DETERIORATION OF THE LAMP. IF YOU ACCIDENTALLY TOUCH THE LAMP GLASS, CLEAN IT WITH A LINT-FREE CLOTH.
ZONE: 210
FIN: 38LE
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 33-12-00-710-001-A
Operational Test of the General Illumination
3. Job Set-up
Subtask 33-12-13-865-057-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH08
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH06
** ON A/C ALL
122VULIGHTING/FLOOD/CTR INST/PNL2LEZ04
4. Procedure
Subtask 33-12-13-560-051-A
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
Subtask 33-12-13-420-053-A
B. Installation of the Center Main-Instrument-Panel Light
   (1) Remove the CAP - BLANKING and connect the electrical connector (8) to the connector (7) of the light (1).
   (2) Install the light (1) in the housing and hold it.
   (3) Install the washers (2) and the screws (3).
     (a) Let the blanking plate of the light (1) open in the down direction.
   (4) Tighten the screws (3).
   (5) Install the washer (5) and the screw (6).
   (6) Tighten the screw (6).
   (7) Close the blanking plate of the light (1) in the up direction.
   (8) Tighten the fasteners (4).
Subtask 33-12-13-865-058-A
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH08
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH06
** ON A/C ALL
122VULIGHTING/FLOOD/CTR INST/PNL2LEZ04
Subtask 33-12-13-710-052-A
D. Do the operational test of the Center Main-Instrument-Panel Light (Ref. AMM TASK 33-12-00-710-001).
5. Close-up
Subtask 33-12-13-942-052-A
A. Make sure that the work area is clean and clear of tools and other items.