Installation of the Map Table lights
TASK 33-12-12-400-002-A
Installation of the Map Table lights
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Expendable Parts
C. Referenced Information
3. Job Set-up
Subtask 33-12-12-865-054-A ** ON A/C NOT FOR ALL
Subtask 33-12-12-420-055-A ** ON A/C NOT FOR ALL
Subtask 33-12-12-942-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:52:22 UTC
Installation of the Map Table lights
CAUTION:
DO NOT TOUCH THE LAMP GLASS WITH YOUR FINGERS.
THE OILS FROM YOUR SKIN WILL QUICKLY CAUSE DETERIORATION OF THE LAMP.
IF YOU ACCIDENTALLY TOUCH THE LAMP GLASS, CLEAN IT WITH A LINT-FREE CLOTH.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 211 | COCKPIT |
| 212 | COCKPIT |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | BULB | AIPC 33-12-01-04-030 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 33-12-00-710-001-A | Operational Test of the General Illumination |
Subtask 33-12-12-865-054-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 41LE (LIGHTMAP TABLE, CAPT) | |||
| 122VU | LIGHTING/FLOOD/CAPT/SIDE | 5LE | Z05 |
| FOR FIN: 42LE (LIGHTMAP TABLE, F/O) | |||
| 122VU | LIGHTING/FLOOD/F/O/SIDE | 4LE | Z06 |
Subtask 33-12-12-420-055-A ** ON A/C NOT FOR ALL
A. Installation of the Map Table Light Bulb
(1) Install the new AIPC 33-12-01-04-030 BULB (2)
(2) Install the cover (3) on the support (1).
(3) Install the screw (4).
Subtask 33-12-12-420-055-C ** ON A/C NOT FOR ALL (1) Install the new AIPC 33-12-01-04-030 BULB (2)
(2) Install the cover (3) on the support (1).
(3) Install the screw (4).
A. Installation of the Map Table Light
(1) Put the leads (4) through the hole of the mounting bracket (3).
(2) Install the mounting bracket (3).
(3) Tighten the screws of the mounting bracket (3).
(4) Install the unit (2) on the mounting bracket (3).
(5) Turn the quick-release fastener (1) a quarter turn clockwise to tighten it.
Subtask 33-12-12-865-055-A ** ON A/C NOT FOR ALL (1) Put the leads (4) through the hole of the mounting bracket (3).
(2) Install the mounting bracket (3).
(3) Tighten the screws of the mounting bracket (3).
(4) Install the unit (2) on the mounting bracket (3).
(5) Turn the quick-release fastener (1) a quarter turn clockwise to tighten it.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 33-12-12-710-051-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 41LE (LIGHTMAP TABLE, CAPT) | |||
| 122VU | LIGHTING/FLOOD/CAPT/SIDE | 5LE | Z05 |
| FOR FIN: 42LE (LIGHTMAP TABLE, F/O) | |||
| 122VU | LIGHTING/FLOOD/F/O/SIDE | 4LE | Z06 |
Subtask 33-12-12-942-051-A ** ON A/C NOT FOR ALL
A. Make sure that the work area is clean and clear of tools and other items.
Captain/First-Officer Map-Table Lights