Installation of the Cockpit Dome Light
TASK 33-12-11-400-002-A
Installation of the Cockpit Dome Light
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 33-12-11-865-056-A ** ON A/C NOT FOR ALL
Subtask 33-12-11-160-051-A ** ON A/C NOT FOR ALL
Subtask 33-12-11-942-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:52:17 UTC
Installation of the Cockpit Dome Light
CAUTION:
DO NOT TOUCH THE LAMP GLASS WITH YOUR FINGERS.
THE OILS FROM YOUR SKIN WILL QUICKLY CAUSE DETERIORATION OF THE LAMP.
IF YOU ACCIDENTALLY TOUCH THE LAMP GLASS, CLEAN IT WITH A LINT-FREE CLOTH.
ZONE: 734
ZONE: 744
FIN: 161LE ** ON A/C NOT FOR ALL
FIN: 162LE ** ON A/C NOT FOR ALL
FIN: 163LE ** ON A/C NOT FOR ALL
FIN: 164LE ** ON A/C NOT FOR ALL
FIN: 165LE ** ON A/C NOT FOR ALL
FIN: 166LE ** ON A/C NOT FOR ALL
FIN: 167LE ** ON A/C NOT FOR ALL
FIN: 168LE ** ON A/C NOT FOR ALL
1. Reason for the JobZONE: 744
FIN: 161LE ** ON A/C NOT FOR ALL
FIN: 162LE ** ON A/C NOT FOR ALL
FIN: 163LE ** ON A/C NOT FOR ALL
FIN: 164LE ** ON A/C NOT FOR ALL
FIN: 165LE ** ON A/C NOT FOR ALL
FIN: 166LE ** ON A/C NOT FOR ALL
FIN: 167LE ** ON A/C NOT FOR ALL
FIN: 168LE ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - BLANKING |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 734 | MAIN DOOR |
| 744 | MAIN DOOR |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 9 | HOLDER LAMP | AIPC 33-12-08-09-010 |
| 10 | LAMP | AIPC 33-12-08-09-030 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-13-41-400-001-A | Installation of the Ceiling Panels |
| TASK 33-12-00-710-001-A | Operational Test of the General Illumination |
Subtask 33-12-11-865-056-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | LIGHTING/EMER LT/CKPT/DOME | 1LE | H08 |
| 122VU | LIGHTING/CKPT/DOME | 3LE | Y06 |
Subtask 33-12-11-160-051-A ** ON A/C NOT FOR ALL
A. Preparation for the Installation
(1) Clean the component interface and/or the adjacent area.
(2) Make an inspection of the component interface and/or the adjacent area.
Subtask 33-12-11-420-053-A ** ON A/C NOT FOR ALL Subtask 33-12-11-420-054-A ** ON A/C NOT FOR ALL (1) Clean the component interface and/or the adjacent area.
(2) Make an inspection of the component interface and/or the adjacent area.
C. Installation of the Dome Light Box
(1) Remove the CAP - BLANKING of the disconnected electrical connector (1) and the socket (2).
(2) Install the dome light box.
(3) Install the four screws (4) and washers (3).
(4) Tighten the four screws (4).
(5) Connect the electrical connector (1) to the socket (2).
Subtask 33-12-11-420-055-A ** ON A/C NOT FOR ALL (1) Remove the CAP - BLANKING of the disconnected electrical connector (1) and the socket (2).
(2) Install the dome light box.
(3) Install the four screws (4) and washers (3).
(4) Tighten the four screws (4).
(5) Connect the electrical connector (1) to the socket (2).
D. Installation of the Socket
(1) Install the new AIPC 33-12-08-09-010 HOLDER LAMP (9) in its housing.
(2) Install the washer (8) and nut (7).
(a) Tighten the nut (7).
(3) Connect the power supply cable (11) to the socket (9).
(4) Install the washer (13) and screw (12).
(a) Tighten the screw (12).
(5) Put the plate (6) in position. Hold it in this position.
(6) Install the two screws (14) and the two screws (5) with their nuts (15) and tighten them.
Subtask 33-12-11-410-050-A ** ON A/C NOT FOR ALL (1) Install the new AIPC 33-12-08-09-010 HOLDER LAMP (9) in its housing.
(2) Install the washer (8) and nut (7).
(a) Tighten the nut (7).
(3) Connect the power supply cable (11) to the socket (9).
(4) Install the washer (13) and screw (12).
(a) Tighten the screw (12).
(5) Put the plate (6) in position. Hold it in this position.
(6) Install the two screws (14) and the two screws (5) with their nuts (15) and tighten them.
E. Installation of the Ceiling Panel
(1) For the Captain dome light, install ceiling panel 211CC (Ref. AMM TASK 25-13-41-400-001).
(2) For the F/O dome light, install ceiling panel 212CC (Ref. AMM TASK 25-13-41-400-001).
Subtask 33-12-11-865-057-A ** ON A/C NOT FOR ALL (1) For the Captain dome light, install ceiling panel 211CC (Ref. AMM TASK 25-13-41-400-001).
(2) For the F/O dome light, install ceiling panel 212CC (Ref. AMM TASK 25-13-41-400-001).
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 33-12-11-710-052-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | LIGHTING/EMER LT/CKPT/DOME | 1LE | H08 |
| 122VU | LIGHTING/CKPT/DOME | 3LE | Y06 |
Subtask 33-12-11-942-051-A ** ON A/C NOT FOR ALL
A. Make sure that the work area is clean and clear of tools and other items.
Dome Light