Installation of the Selector Valve
TASK 32-51-23-400-002-A
Installation of the Selector Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 32-51-23-010-053-A ** ON A/C NOT FOR ALL
Subtask 32-51-23-560-052-A ** ON A/C NOT FOR ALL
Subtask 32-51-23-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:51:41 UTC
Installation of the Selector Valve
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WORK ON THE HYDRAULIC SYSTEMS CAN BE DANGEROUS.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 744
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03PBC1) | Lubricant-Anti Seize MoS2 and Petrolatum - |
| (Material No.06LDG2) | Non Hardening Jointing Putty-High Temp. Area - Structure |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 744 | MAIN DOOR |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 5 | O-RINGS | AIPC 32-51-23-01-060 |
| 6 | BACK-UP RINGS | AIPC 32-51-23-01-070 |
| 9 | O-RINGS | AIPC 32-51-23-01-080 |
| 8 | BACK-UP RINGS | AIPC 32-51-23-01-090 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 20-23-21-911-001-A | Removal/Installation of the Bobbins from their Housings and Installation of O-rings, Square Seals, and Back-up Rings on the Bobbins |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-864-002-A | Depressurize the Yellow Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 32-51-00-720-003-A | Functional Test of the Nose Wheel Steering with the Handwheel |
Subtask 32-51-23-010-053-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Make sure that the right MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position.
Subtask 32-51-23-860-056-A ** ON A/C NOT FOR ALL (1) Make sure that the right MLG door is open (Ref. AMM TASK 32-12-00-010-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position.
B. Aircraft Maintenance Configuration
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Make sure that the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-002).
(3) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
(4) Make sure that WARNING NOTICE(S) are in position to tell persons not to pressurize the Yellow hydraulic system:
(6) Make sure that the CONTAINER 5 L (1.32 USGAL) is in position below the selector valve (2).
Subtask 32-51-23-865-056-A ** ON A/C NOT FOR ALL (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Make sure that the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-002).
(3) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
(4) Make sure that WARNING NOTICE(S) are in position to tell persons not to pressurize the Yellow hydraulic system:
- On the panel 40VU in the cockpit
- On the ground service panel of the Yellow hydraulic system.
(6) Make sure that the CONTAINER 5 L (1.32 USGAL) is in position below the selector valve (2).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | ABCU &/Y BRK/PRESS IND | 61GG | C10 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
| 121VU | HYDRAULIC/PARK BRK/CTL/STBY | 71GG | N37 |
| 121VU | HYDRAULIC/PARK BRK/CTL/NORM | 70GG | N36 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/CTL | 3701GD | Q36 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
Subtask 32-51-23-560-052-A ** ON A/C NOT FOR ALL
A. Preparation of the Replacement Selector Valve
(1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Prepare the bobbins (7) (Ref. AMM TASK 20-23-21-911-001) as follows:
(a) Install the new AIPC 32-51-23-01-070 BACK-UP RINGS (6) and the new AIPC 32-51-23-01-090 BACK-UP RINGS (8) on the bobbins (7).
(b) Install the new AIPC 32-51-23-01-060 O-RINGS (5) and the new AIPC 32-51-23-01-080 O-RINGS (9) on the bobbins (7).
(5) Apply Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to the threads of the bolts (3).
(6) Remove the blanking plugs from the ports of the new selector valve (2) and the manifold (10).
Subtask 32-51-23-420-052-A ** ON A/C NOT FOR ALL (1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Prepare the bobbins (7) (Ref. AMM TASK 20-23-21-911-001) as follows:
(a) Install the new AIPC 32-51-23-01-070 BACK-UP RINGS (6) and the new AIPC 32-51-23-01-090 BACK-UP RINGS (8) on the bobbins (7).
(b) Install the new AIPC 32-51-23-01-060 O-RINGS (5) and the new AIPC 32-51-23-01-080 O-RINGS (9) on the bobbins (7).
(5) Apply Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to the threads of the bolts (3).
(6) Remove the blanking plugs from the ports of the new selector valve (2) and the manifold (10).
B. Installation of the Selector Valve
(1) Install the bobbins (7) in the manifold (10) (Ref. AMM TASK 20-23-21-911-001).
(2) Apply a layer of Lubricant-Anti Seize MoS2 and Petrolatum - (Material No.03PBC1) to the mating surfaces of the selector valve (2) and the manifold (10).
(3) Put the selector valve (2) in position and install the washers (4) and the bolts (3).
(4) Put the bonding strap (11) in position and install the washer (12) and the bolt (13) (Ref. AMM TASK 20-28-00-912-802).
(5) TORQUE the bolts (3) and (13) to to between 0.7 and 0.6 m.daN (61.95 and 53.10 lbf.in )
.
(6) Remove the CAP-BLANKING from each electrical connector and receptacle.
(7) Make sure that all the electrical connections are clean and in the correct condition.
(8) Connect the electrical connector (1) to the selector valve (2).
Subtask 32-51-23-860-057-A ** ON A/C NOT FOR ALL (1) Install the bobbins (7) in the manifold (10) (Ref. AMM TASK 20-23-21-911-001).
(2) Apply a layer of Lubricant-Anti Seize MoS2 and Petrolatum - (Material No.03PBC1) to the mating surfaces of the selector valve (2) and the manifold (10).
(3) Put the selector valve (2) in position and install the washers (4) and the bolts (3).
(4) Put the bonding strap (11) in position and install the washer (12) and the bolt (13) (Ref. AMM TASK 20-28-00-912-802).
(5) TORQUE the bolts (3) and (13) to to between 0.7 and 0.6 m.daN (61.95 and 53.10 lbf.in )
. (6) Remove the CAP-BLANKING from each electrical connector and receptacle.
(7) Make sure that all the electrical connections are clean and in the correct condition.
(8) Connect the electrical connector (1) to the selector valve (2).
C. Preparation for Test
(1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(2) If necessary, fill the reservoir of the Yellow hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
Subtask 32-51-23-865-057-A ** ON A/C NOT FOR ALL (1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(2) If necessary, fill the reservoir of the Yellow hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-51-23-710-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | ABCU &/Y BRK/PRESS IND | 61GG | C10 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
| 121VU | HYDRAULIC/PARK BRK/CTL/STBY | 71GG | N37 |
| 121VU | HYDRAULIC/PARK BRK/CTL/NORM | 70GG | N36 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/CTL | 3701GD | Q36 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
E. Test
(1) Do the functional test of the nose wheel steering (Ref. AMM TASK 32-51-00-720-003).
(2) Make sure that there is no hydraulic fluid leakage from the selector valve (2) and/or the manifold (10).
5. Close-up(1) Do the functional test of the nose wheel steering (Ref. AMM TASK 32-51-00-720-003).
(2) Make sure that there is no hydraulic fluid leakage from the selector valve (2) and/or the manifold (10).
NOTE: Leaks are not permitted.
Subtask 32-51-23-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Remove the container.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
(5) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(6) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the container.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
(5) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(6) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Selector Valve Assembly