W DOC AIRBUS | AMM A320F

Installation of the Nose - Wheel Steering Electrical Deactivation - Box


TASK 32-51-12-400-001-A
Installation of the Nose - Wheel Steering Electrical Deactivation - Box


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM. UNWANTED MOVEMENT OF HYDRAULICALLY OPERATED ITEMS CAN CAUSE SERIOUS INJURY AND/OR DAMAGE.
WARNING: PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY HYDRAULIC POWER TO THE AIRCRAFT.
WARNING: MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
ZONE: 711
FIN: 5GC
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
711
NOSE GEAR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 32-51-00-720-005-A
Functional Test of the Nose-Wheel-Steering Deactivation Electrical-Box
3. Job Set-up
Subtask 32-51-12-941-051-A
A. Safety Precautions
   (1) Make sure that the warning notice is on the panel 400VU, to tell persons not to operate the nose landing gear.
   (2) On the center pedestal, in the cockpit make sure that the free-fall control handle of the landing gear is in the normal position.
Subtask 32-51-12-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
121VUHYDRAULIC/PARK BRK/CTL/NORM70GGN36
4. Procedure
Subtask 32-51-12-420-050-A
A. Installation of the Electrical Box
   (1) Put the electrical box (1) in position.
   (2) Install the screws (4) and the washers (3).
   (3) TORQUE the screws (4) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) T.
   (4) Remove the blanking cap from the connector (2).
   (5) Make sure that all the electrical connections are clean and in the correct condition.
   (6) Connect the electrical connector (2) to the electrical box (1).
Subtask 32-51-12-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
121VUHYDRAULIC/PARK BRK/CTL/NORM70GGN36
Subtask 32-51-12-720-050-A
5. Close-up
Subtask 32-51-12-942-050-A
A. Removal of Equipment
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 00:51:16 UTC