W DOC AIRBUS | AMM A320F

Installation of the Parking Brake Control Switch


TASK 32-45-52-400-001-A
Installation of the Parking Brake Control Switch


ZONE: 211
FIN: 73GG
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
PIN - RELEASE
DMC519
1
ELECTRICIAN SERVICE TOOL KIT
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
211
COCKPIT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 22-97-00-710-001-A
Operational Test of the LAND CAT III Capability
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 32-45-00-710-001-A
Operational Check of the Parking Brake System
ESPM 204523
3. Job Set-up
Subtask 32-45-52-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUHYDRAULIC/PARK BRK/CTL/STBY71GGN37
121VUHYDRAULIC/PARK BRK/CTL/NORM70GGN36
4. Procedure
Subtask 32-45-52-420-050-A
A. Installation of the Rotary Switch
   (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Install the rotary switch (8) in position on the panel 110VU (1).
NOTE: Make sure that the locating stud is in the locating hole.
   (4) Install the washer (7) and the nut (6) and tighten. Refer to ESPM 204523.
   (5) Connect the wires (9) to the rotary switch (8) with the applicable tool color white red included in the DMC519 ELECTRICIAN SERVICE TOOL KIT.
   (6) Install the panel (1) on the support (10).
   (7) Tighten the four Dzus fasteners (2) on the panel (1).
   (8) Install the knob (3), (in OFF position), the PIN - RELEASE (4), and the screw (5).
   (9) Moderatly tighten the screw (5).
Subtask 32-45-52-861-050-A
B. Energize the aircraft electrical circuits. (Ref. AMM TASK 24-41-00-861-002)
Subtask 32-45-52-865-052-A
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUHYDRAULIC/PARK BRK/CTL/STBY71GGN37
121VUHYDRAULIC/PARK BRK/CTL/NORM70GGN36
Subtask 32-45-52-720-050-A
D. Test of the Rotary Switch
   (1) Do the Operational Check of the Parking Brake System Using Individual Motors in turn (Ref. AMM TASK 32-45-00-710-001).

NOTE: If you have disconnected the connectors of the panel 110VU and if the aircraft is operated in CAT 3 conditions, you must also do the test below:
Land CAT 3 Capability Test (Ref. AMM TASK 22-97-00-710-001).
5. Close-up
Subtask 32-45-52-942-050-A
A. Removal of Equipment
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Put the aircraft back to the serviceable condition.
Subtask 32-45-52-862-050-A
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.01 00:50:04 UTC