W DOC AIRBUS | AMM A320F

Installation of the Dual Shuttle Valve


TASK 32-45-16-400-001-A
Installation of the Dual Shuttle Valve


WARNING: MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES. WORK ON THE HYDRAULIC SYSTEMS CAN BE DANGEROUS.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 744
FIN: 2578GM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft ) T
No specific
Torque wrench: range to between 4.57 and 4.47 m.daN (33.70 and 32.96 lbf.ft ) T
No specific
Torque wrench: range to between 5.9 and 5.4 m.daN (43.51 and 39.82 lbf.ft ) T
No specific
Torque wrench: range to between 7.95 and 7.85 m.daN (58.63 and 57.89 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
(Material No.06AEA1)
Polysulfide Sealant-Low Adhesion Brushable -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
744
MAIN DOOR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
PACKINGS
AIPC 32-45-03-03-100
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 20-23-22-910-001-A
Marking of the Unions after Application of Standard or Specific Tightening Torque
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-864-002-A
Depressurize the Yellow Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
TASK 32-43-00-710-001-A
Operational Check of Alternate Braking System
TASK 32-43-00-870-002-A
Bleeding of the High Pressure Alternate Braking System
TASK 32-45-00-710-001-A
Operational Check of the Parking Brake System
TASK 32-45-17-400-001-A
Installation of the Park Brake - Pressure Switch
TASK 51-75-13-916-002-A
Repair to a layer of Corrosion Preventive Compound
3. Job Set-up
Subtask 32-45-16-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
   (2) Make sure that the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-002).
   (3) Make sure that the reservoir of the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
Subtask 32-45-16-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUL/G/Y BRK/PRESS/IND61GGC10
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
121VUHYDRAULIC/PARK BRK/CTL/STBY71GGN37
121VUHYDRAULIC/PARK BRK/CTL/NORM70GGN36
121VUHYDRAULIC/HYD POWER/Y3803GXN30
121VUHYDRAULIC/Y HYD/PUMP ENG2/MONG3700GDQ37
121VUHYDRAULIC/Y HYD/PUMP ENG2/CTL3701GDQ36
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 32-45-16-941-052-A ** ON A/C NOT FOR ALL
C. Safety Precautions
   (1) Make sure that the warning notices are in position to tell persons not to pressurize the Yellow hydraulic system:
  • On panel 40VU in the cockpit
  • On the ground service panel of the Yellow hydraulic system.
4. Procedure
Subtask 32-45-16-560-050-A ** ON A/C NOT FOR ALL Subtask 32-45-16-560-051-A ** ON A/C NOT FOR ALL
B. Preparation for Installation
   (1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.
14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 32-45-16-420-050-B ** ON A/C NOT FOR ALL
C. Installation of the Dual Shuttle Valve
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
   (1) Apply Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) to the component interface.
   (2) Put the dual shuttle valve (4) in position and install the bolts (6) and the washers (5).
   (3) Remove the PLUG-BLANKING from each disconnected line end.
   (4) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (5) Make sure that the hydraulic line end-fittings are serviceable.
   (6) Connect the hydraulic connectors (7) and (8) to the reducers (2).
   (7) Connect the hydraulic connectors (10) and (13) to the unions (9).
   (8) TORQUE the hydraulic connector (13) to between 4.57 and 4.47 m.daN (33.70 and 32.96 lbf.ft ) T.
   (9) Connect the hydraulic connector (12) to the parking brake pressure-switch (86GG).
   (10) TORQUE the hydraulic connector (12) to between 4.57 and 4.47 m.daN (33.70 and 32.96 lbf.ft )
T.
   (11) If removed, install parking brake pressure-switch (86GG) (
Ref. AMM TASK 32-45-17-400-001).
   (12) TORQUE the hydraulic connectors (7) and (8) to between 5.9 and 5.4 m.daN (43.51 and 39.82 lbf.ft ) T.
   (13) TORQUE the hydraulic connector (10) to between 4.57 and 4.47 m.daN (33.70 and 32.96 lbf.ft )
T.
   (14) Connect the hydraulic connector (1) to the reducer (2).
   (15) TORQUE the hydraulic connector (1) to between 7.95 and 7.85 m.daN (58.63 and 57.89 lbf.ft )
T.
   (16) Identify the tightened union nuts with a red line
(
Ref. AMM TASK 20-23-22-910-001).
Subtask 32-45-16-860-052-A ** ON A/C NOT FOR ALL
D. Preparation for Test
   (1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
Subtask 32-45-16-865-052-A ** ON A/C NOT FOR ALL
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUL/G/Y BRK/PRESS/IND61GGC10
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
121VUHYDRAULIC/PARK BRK/CTL/STBY71GGN37
121VUHYDRAULIC/PARK BRK/CTL/NORM70GGN36
121VUHYDRAULIC/HYD POWER/Y3803GXN30
121VUHYDRAULIC/Y HYD/PUMP ENG2/MONG3700GDQ37
121VUHYDRAULIC/Y HYD/PUMP ENG2/CTL3701GDQ36
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 32-45-16-870-050-A ** ON A/C NOT FOR ALL
F. Bleed the System
   (1) Bleed the high-pressure alternate braking system (Ref. AMM TASK 32-43-00-870-002).
Subtask 32-45-16-710-050-A ** ON A/C NOT FOR ALL
G. Test
   (1) Do the operational check of the parking brake system (Ref. AMM TASK 32-45-00-710-001).
   (2) Do the operational check of the alternate braking system (Ref. AMM TASK 32-43-00-710-001).
   (3) Make sure that there is no hydraulic fluid leakage from the dual shuttle valve (4). Leaks are not permitted.
5. Close-up
Subtask 32-45-16-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Apply corrosion protection to the heads of the bolts, the connectors and the adjacent areas (Ref. AMM TASK 51-75-13-916-002).
   (2) Remove the CONTAINER.
   (3) Remove the WARNING NOTICE(S).
   (4) Remove the access platform(s).
   (5) Make sure that the work area is clean and clear of tools and other items.
   (6) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
   (7) If necessary fill the reservoir of the Yellow hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
   (8) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.01 00:49:57 UTC