W DOC AIRBUS | AMM A320F

Installation of the Alternate-Brake Direct Drive Valve


TASK 32-43-35-400-001-A
Installation of the Alternate-Brake Direct Drive Valve


WARNING: MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 97GG ** ON A/C NOT FOR ALL
FIN: 98GG ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.4 and 0.3 m.daN (35.40 and 26.55 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
(Material No.06LDG2)
Non Hardening Jointing Putty-High Temp. Area - Structure
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
4
SEALS
AIPC 32-43-27-02-040
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-10-00-864-002-A
Depressurize the Yellow Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 32-00-00-481-001-A
Installation of the Safety Devices on the Landing Gears
TASK 32-43-00-710-001-A
Operational Check of Alternate Braking System
TASK 32-43-00-870-002-A
Bleeding of the High Pressure Alternate Braking System
3. Job Set-up
Subtask 32-43-35-941-051-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) Make sure that the SAFETY BARRIER(S) are in position.
   (2) Make sure that the ground safety locks are on the landing gear (Ref. AMM TASK 32-00-00-481-001).
   (3) On the panel 400VU:
  • make sure that the landing-gear control-lever 6GA is in the DOWN position
  • make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the landing gear.
   (4) Make sure that the WARNING NOTICE(S) is in position on the ground service connection (to tell persons not to pressurize the Yellow and Green hydraulic systems).
Subtask 32-43-35-860-051-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Make sure that the ACCESS PLATFORM 3M (10 FT) is below the applicable false rear spar at zone 571(671).
   (2) Make sure that the isolation coupling of the PTU is disconnected (Ref. AMM TASK 29-23-00-860-001).
   (3) Make sure that the Yellow and Green hydraulic systems are depressurized (Ref. AMM TASK 29-00-00-864-001) and (Ref. AMM TASK 29-10-00-864-002).
   (4) Make sure that the applicable hydraulic reservoir has been depressurized (Ref. AMM TASK 29-14-00-614-001).
Subtask 32-43-35-865-051-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUABCU &/Y BRK/PRESS IND61GGC10
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
121VUABCU/HOT BUS/SPLY110GGP30
** ON A/C NOT FOR ALL
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
121VUHYDRAULIC/PARK BRK/CTL/STBY71GGN37
121VUHYDRAULIC/PARK BRK/CTL/NORM70GGN36
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
121VUABCU/HOT BUS/SPLY110GGP31
** ON A/C NOT FOR ALL
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
4. Procedure
Subtask 32-43-35-420-050-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Do an inspection of the component interfaces and the adjacent area.
   (4) Lubricate the new AIPC 32-43-27-02-040 SEALS (4) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
Subtask 32-43-35-420-051-A ** ON A/C NOT FOR ALL
B. Installation of the Alternate-Brake Direct Drive Valve
   (1) Install the back-up rings (5) and the seals (4) on the direct drive valve (3).
   (2) Remove the cover from the alternate-brake manifold.
   (3) Align the dowel with its locating-hole on the manifold and install the direct drive valve (3).
   (4) Apply a thin layer of Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to the screws (2).
   (5) Install the screws (2) and TORQUE tighten to between 0.4 and 0.3 m.daN (35.40 and 26.55 lbf.in ) T.
   (6) Remove the blanking caps and connect the electrical connector (1).
Subtask 32-43-35-865-052-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUABCU &/Y BRK/PRESS IND61GGC10
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
121VUABCU/HOT BUS/SPLY110GGP30
** ON A/C NOT FOR ALL
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
121VUHYDRAULIC/PARK BRK/CTL/STBY71GGN37
121VUHYDRAULIC/PARK BRK/CTL/NORM70GGN36
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
121VUABCU/HOT BUS/SPLY110GGP31
** ON A/C NOT FOR ALL
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 32-43-35-860-052-A ** ON A/C NOT FOR ALL
Subtask 32-43-35-870-050-A ** ON A/C NOT FOR ALL
E. Bleed the System
   (1) Bleed the alternate brake system (Ref. AMM TASK 32-43-00-870-002).
   (2) Use a clean Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) to remove unwanted hydraulic fluid.
Subtask 32-43-35-710-050-A ** ON A/C NOT FOR ALL
F. Test
   (1) Do an operational test of the alternate braking system (Ref. AMM TASK 32-43-00-710-001).
   (2) Make sure that there are no hydraulic leaks at the interface of the alternate-brake manifold and the direct drive valve.
5. Close-up
Subtask 32-43-35-942-050-A ** ON A/C NOT FOR ALL
A. Removal of Equipment
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the SAFETY BARRIER(S).
   (3) Remove the WARNING NOTICE(S).
   (4) Remove the access platform(s).
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.01 00:49:17 UTC