Installation of the Alternate Brake Safety-Valve
TASK 32-43-16-400-001-A
Installation of the Alternate Brake Safety-Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 32-43-16-941-053-A ** ON A/C NOT FOR ALL
Subtask 32-43-16-420-051-A ** ON A/C NOT FOR ALL
Subtask 32-43-16-942-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:48:58 UTC
Installation of the Alternate Brake Safety-Valve
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 2620GM ** ON A/C NOT FOR ALL
FIN: 2621GM ** ON A/C NOT FOR ALL
FIN: 2622GM ** ON A/C NOT FOR ALL
FIN: 2623GM ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 2621GM ** ON A/C NOT FOR ALL
FIN: 2622GM ** ON A/C NOT FOR ALL
FIN: 2623GM ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 3 | PACKING | AIPC 32-43-31-02-060 |
| 8 | PACKINGS | AIPC 32-43-31-02-060 |
| 4 | BACK-UP RING | AIPC 32-43-31-02-070 |
| 9 | BACK-UP RINGS | AIPC 32-43-31-02-070 |
| 6 | PACKING | AIPC 32-43-31-02-080 |
| 5 | RETAINER | AIPC 32-43-31-02-090 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-00-00-481-001-A | Installation of the Safety Devices on the Landing Gears |
| TASK 32-43-00-710-001-A | Operational Check of Alternate Braking System |
| TASK 32-43-00-870-002-A | Bleeding of the High Pressure Alternate Braking System |
Subtask 32-43-16-941-053-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the ground safety locks are on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On the panel 400VU:
Subtask 32-43-16-860-054-A ** ON A/C NOT FOR ALL (1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the ground safety locks are on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On the panel 400VU:
- make sure that the landing-gear control-lever 6GA is in the DOWN position
- make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the landing gear.
- the Yellow hydraulic system.
B. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position below the applicable false spar at the alternate brake manifold.
(2) Make sure that the Isolation Coupling of the PTU is disconnected (Ref. AMM TASK 29-23-00-860-001).
(3) Make sure that the hydraulic systems have been depressurized (Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that the applicable hydraulic reservoir has been depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the container is below the applicable alternate brake manifold.
Subtask 32-43-16-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position below the applicable false spar at the alternate brake manifold.
(2) Make sure that the Isolation Coupling of the PTU is disconnected (Ref. AMM TASK 29-23-00-860-001).
(3) Make sure that the hydraulic systems have been depressurized (Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that the applicable hydraulic reservoir has been depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the container is below the applicable alternate brake manifold.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
| 121VU | HYDRAULIC/PARK BRK/CTL/STBY | 71GG | N37 |
| 121VU | HYDRAULIC/PARK BRK/CTL/NORM | 70GG | N36 |
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
Subtask 32-43-16-420-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Remove the covers from the alternate brake manifold, the bobbin (10) and the filter (7).
(5) Use Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to lubricate:
Subtask 32-43-16-420-050-A ** ON A/C NOT FOR ALL (1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Remove the covers from the alternate brake manifold, the bobbin (10) and the filter (7).
(5) Use Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to lubricate:
- The new AIPC 32-43-31-02-060 PACKING (3)
- The new AIPC 32-43-31-02-080 PACKING (6)
- The new AIPC 32-43-31-02-060 PACKINGS (8)
- The new AIPC 32-43-31-02-070 BACK-UP RING (4)
- The new AIPC 32-43-31-02-070 BACK-UP RINGS (9)
- The new AIPC 32-43-31-02-090 RETAINER (5).
B. Installation of the Alternate Brake Safety-Valve
(1) Install the packings (3) and (6), the back-up ring (4) and the retainer (5) on the filter (7).
(2) Install the packings (8) and the back-up rings (9) on the bobbin (10).
(3) Install the filter (7) and the bobbin (10) in the alternate brake manifold.
(4) Carefully install the safety-valve (1) on the alternate brake manifold. Make sure that you do not cause damage to the:
.
Subtask 32-43-16-865-052-A ** ON A/C NOT FOR ALL (1) Install the packings (3) and (6), the back-up ring (4) and the retainer (5) on the filter (7).
(2) Install the packings (8) and the back-up rings (9) on the bobbin (10).
(3) Install the filter (7) and the bobbin (10) in the alternate brake manifold.
(4) Carefully install the safety-valve (1) on the alternate brake manifold. Make sure that you do not cause damage to the:
- packings (3), (6) and (8)
- back-up rings (4) and (9)
- retainer (5)
- filter (7)
- bobbin (10).
. C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-43-16-860-053-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
| 121VU | HYDRAULIC/PARK BRK/CTL/STBY | 71GG | N37 |
| 121VU | HYDRAULIC/PARK BRK/CTL/NORM | 70GG | N36 |
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
D. Aircraft Maintenance Configuration
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Connect the Isolation Coupling of the PTU (Ref. AMM TASK 29-23-00-860-002).
(4) Pressurize the Yellow hydraulic system.
(5) Pressurize the applicable hydraulic reservoirs (Ref. AMM TASK 29-14-00-614-002).
Subtask 32-43-16-870-051-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Connect the Isolation Coupling of the PTU (Ref. AMM TASK 29-23-00-860-002).
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM. UNWANTED MOVEMENT OF HYDRAULICALLY OPERATED ITEMS CAN CAUSE SERIOUS INJURY AND/OR DAMAGE.
(3) Pressurize the Green hydraulic system. (4) Pressurize the Yellow hydraulic system.
(5) Pressurize the applicable hydraulic reservoirs (Ref. AMM TASK 29-14-00-614-002).
E. Bleed the Braking System
(1) Bleed the Alternate Braking System (Ref. AMM TASK 32-43-00-870-002).
Subtask 32-43-16-710-050-A ** ON A/C NOT FOR ALL (1) Bleed the Alternate Braking System (Ref. AMM TASK 32-43-00-870-002).
F. Test
(1) Do an operational check of the Alternate Braking system (Ref. AMM TASK 32-43-00-710-001).
(2) Make sure that there are no hydraulic leaks at the interface of the alternate brake manifold and the alternate brake safety-valve.
5. Close-up(1) Do an operational check of the Alternate Braking system (Ref. AMM TASK 32-43-00-710-001).
(2) Make sure that there are no hydraulic leaks at the interface of the alternate brake manifold and the alternate brake safety-valve.
Subtask 32-43-16-942-050-A ** ON A/C NOT FOR ALL
A. Removal of Equipment
(1) Remove the SAFETY BARRIER(S).
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the SAFETY BARRIER(S).
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Alternate Brake Safety-Valve