W DOC AIRBUS | AMM A320F

Installation of the Brake Control Hydraulic Reservoir


TASK 32-43-11-400-001-A
Installation of the Brake Control Hydraulic Reservoir


ZONE: 122
FIN: 2624GM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
No specific
Torque wrench: range to between 1.2 and 1.1 m.daN (106.19 and 97.35 lbf.in ) T
No specific
Torque wrench: range to between 1.65 and 1.35 m.daN (146.02 and 119.47 lbf.in ) T
No specific
Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
122
AVIONICS COMPARTMENT
811
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
14
WASHER-SEAL
AIPC 32-43-01-01-150
10
PACKING
AIPC 32-43-01-02-060
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 32-43-00-612-001-A
Filling and Bleeding of the Low Pressure Control System of the Alternate Braking
TASK 32-43-00-612-001-A-01
Filling and Bleeding of the Low Pressure Control System of the Alternate Braking using Green Reservoir fluid
TASK 32-43-00-710-001-A
Operational Check of Alternate Braking System
3. Job Set-up
Subtask 32-43-11-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the warning notice to tell persons not to operate the brake pedals is in position in the cockpit.
   (3) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the access door 811.
   (4) Make sure that the access door 811 is open.
4. Procedure
Subtask 32-43-11-560-050-A ** ON A/C NOT FOR ALL
A. Preparation of the Brake Control Reservoir before Installation
   (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (2) Remove the blanking plugs from the bleed screw (15) and the union (9).
   (3) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) :
   (4) Install the union (11) and the new packing (10) on the union (9) of the brake control reservoir (1).
   (5) TORQUE the union (11) to between 1.2 and 1.1 m.daN (106.19 and 97.35 lbf.in )
T.
Subtask 32-43-11-420-050-A ** ON A/C NOT FOR ALL Subtask 32-43-11-612-050-A ** ON A/C NOT FOR ALL Subtask 32-43-11-710-050-A ** ON A/C NOT FOR ALL
D. Operational test
   (1) Do the operational test of the alternate braking system. (Ref. AMM TASK 32-43-00-710-001)
5. Close-up
Subtask 32-43-11-410-050-A ** ON A/C NOT FOR ALL
A. Close access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 811.
   (3) Remove the access platform(s).
   (4) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 00:48:46 UTC