W DOC AIRBUS | AMM A320F

Check Fluid Level of Low Pressure Brake Reservoir


TASK 32-43-11-210-001-A
Check Fluid Level of Low Pressure Brake Reservoir


ZONE: 122
FIN: 2624GM ** ON A/C NOT FOR ALL
1. Reason for the Job
Refer to the MPD TASK: 324311-01
FUNCTIONAL CHECK OF FLUID LEVEL OF LOW PRESSURE BRAKE RESERVOIR
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
CHOCK - WHEEL(S)
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
122
AVIONICS COMPARTMENT
811
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-32-611-002-A
Replenishment of the Alternate Brake Reservoir
TASK 32-43-00-612-001-A
Filling and Bleeding of the Low Pressure Control System of the Alternate Braking
TASK 32-43-00-612-001-A-01
Filling and Bleeding of the Low Pressure Control System of the Alternate Braking using Green Reservoir fluid
3. Job Set-up
Subtask 32-43-11-867-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) On the panel 400VU, make sure that the landing-gear control-lever is in the DOWN position.
   (2) On the panel 110VU, make sure that the PARK BRK control switch is in the OFF position.
Subtask 32-43-11-941-053-A ** ON A/C NOT FOR ALL
B. Safety Precautions
   (1) Make sure that the CHOCK - WHEEL(S) are in position.
   (2) In the cockpit, put the WARNING NOTICE(S) to tell persons not to operate the brake pedals.
Subtask 32-43-11-010-051-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone 120.
   (2) Open the access door 811.
4. Procedure
Subtask 32-43-11-210-050-A ** ON A/C NOT FOR ALL
A. Check of the Fluid Level of the Low-Pressure Brake Reservoir
   (1) On the fluid level indicator of the reservoir, examine the position of the piston end.
     (a) If the piston end is aligned with the green band, the level is correct.
     (b) If the piston end is between the red band and the green band:
       1 Fill the reservoir (Ref. AMM TASK 12-12-32-611-002).
     (c) If the piston end is aligned with or below the red band:
       1 The reservoir is empty, do the bleed procedure of the system (Ref. AMM TASK 32-43-00-612-001).
     (d) If the piston end is above the green band:
       1 The reservoir is too full, do the bleed procedure of the system (Ref. AMM TASK 32-43-00-612-001).
5. Close-up
Subtask 32-43-11-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 811.
   (3) Remove the access platform(s).
   (4) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 00:48:47 UTC